Monthly Update of Documents Uploaded

 

       Documents Uploaded to the EIAO Website

       (for the period between 16 Sep 2015 to 15 Oct 2015)

 

Application No. / Permit No.

Project Title

Document Name

Hyperlink

 

Application for EIA Study Brief

 

NIL

 

Application for Permission to Apply Directly for Environmental Permit

 

DIR-241/2015

Proposed Sewage Pumping Station and Dry Weather Flow Interceptor at Cherry Street Box Culvert

Decision of DEP

http://www.epd.gov.hk/eia/register/permission/conditions/dir2412015.pdf

 

DIR-242/2015

Queen’s Hill Sewage Pumping Station

Project Profile

http://www.epd.gov.hk/eia/register/profile/latest/dir242/dir242.pdf

 

Application for Approval of EIA Report

 

EIA-230/2015

Chai Wan Government Complex and Vehicle Depot

Approval Conditions

http://www.epd.gov.hk/eia/register/report/conditions/aeiar2302015.pdf

 

EIA-232/2015

Operation of the Existing Tai Lam Explosives Magazine at Tai Shu Ha, Yuen Long for Liantang / Heung Yuen Wai Boundary Control Point Project

EIA Report

http://www.epd.gov.hk/eia/register/report/eiareport/eia_2322015/HTML(Index)/index.htm

 

Application for Environmental Permit

 

NIL

 

Application for Variation of an Environmental Permit

 

VEP-481/2015

An Extension to the Existing Boardwalk and New Floating Mudflat Bird-watching Hide at Mai Po Nature Reserve for Education and Conservation Purposes

Environmental Permit issued (EP-264/2007/A)

http://www.epd.gov.hk/eia/register/permit/latest/vep4812015.htm

 

VEP-482/2015

Shatin to Central Link - Hung Hom to Admiralty Section

Environmental Permit issued (EP-436/2012/C)

http://www.epd.gov.hk/eia/register/permit/latest/vep4822015.htm

 

VEP-483/2015

Central Reclamation Phase III

Environmental Permit issued (EP-122/2002/E)

http://www.epd.gov.hk/eia/register/permit/latest/vep4832015.htm

 

Application for Further Environmental Permit

 

NIL

 

Submission as required by Environmental Permit Condition - Design / Environmental Submissions

 

EP-427/2011/A

Dredging, Management and Capping of Contaminated Sediment Disposal Facility to the South of The Brothers

Monthly Progress Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html

 

FEP-09/364/2009/B 

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Landscape Plan(HK/2012/08)

http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html

 

FEP-01/474/2013

NENT - Shek Wu Hui Sewage Treatment Works - Further Expansion at Fanling North New Development Area

Updated Environmental Monitoring and Audit (EM&A) Manual under The Contract

http://www.epd.gov.hk/eia/english/register/index7/fep1522014_content.html

 

Submission as required by Environmental Permit Condition - EM&A Reports

 

 

Island District

Central & Western District

 

 

 

North District

Wan Chai District

 

 

 

Sai Kung District

Eastern District

 

 

 

Sha Tin District

Southern District

 

 

 

Tai Po District

Kowloon City District

 

 

 

Tsuen Wan District

Kwun Tong District

 

 

 

Tuen Mun District

Sham Shui Po District

 

 

 

Yuen Long District

Wong Tai Sin District

 

 

 

Kwai Tsing District

Yau Tsim Mong District

 

 

- Island District

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Aug 2015)(HY/2012/07)

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Jul 2015)(HY/2013/12)

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Aug 2015)(HY/2012/08)

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

EP-083/2000

Conversion of Two Existing Gas Turbines (GT5 & GT7) into a Combined Cycle Unit

Monthly Environmental Monitoring And Audit Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html

 

EP-071/2000/C

1,800MW Gas-Fired Power Station at Lamma Extension

Monthly Environmental Monitoring and Audit Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html

 

EP-392/2010

Improvement of Fresh Water Supply to Cheung Chau

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep3922010_content.html

 

EP-452/2013

Temporary Sewage Pumping Station Ancillary to Tung Chung Area 56 Public Housing Development

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep4522013_content.html

 

EP- 01/097/2001/C

Water Recreation Centre at Penny's Bay (part & remaining part)

Monthly Environmental Monitoring and Audit Report (No. 120)

http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html

 

EP-01/059/2000/C

The Theme Park at Penny's Bay, Lantau

119th Monthly EM&A Report (12 Jul 2015 to 11 Aug 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html

 

FEP-01/395/2010/B 

Organic Waste Treatment Facilities, Phase I

Second Monthly EM&A Report

http://www.epd.gov.hk/eia/english/register/index7/fep1602015_content.html

 

EP-353/2009/I 

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Monthly Environmental Monitoring and Audit Report (Jul 2015)(HY/2013/04)

http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html

 

EP-353/2009/I 

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Monthly Environmental Monitoring and Audit Report (Jul 2015)(HY/2013/02)

http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html

 

EP-237/2005/B

Drainage Improvements in Southern Lantau

Monthly Environmental Monitoring & Audit Report (Jun 2015) (DP 04/2012)

http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html

 

EP-237/2005/B

Drainage Improvements in Southern Lantau

Monthly Environmental Monitoring & Audit Report (Jul 2015) (DP 04/2012)

http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html

 

EP-352/2009/A

Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road

Quarterly EM&A Report (Mar 2015 to May 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep3392013_content.html

 

EP-349/2009/I

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep3772012_content.html

 

- North District

 

EP-404/2011/C 

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html

 

EP-277/2007/A

Drainage Improvements in Northern New Territories - Package C

Monthly EM&A Report(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html

 

EP-430/2011 

Regulation of Shenzhen River Stage IV

Monthly EM&A Report(Jul 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html

 

EP-436/2012/B

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4672015_content.html

 

EP-436/2012/B

Shatin to Central Link - Hung Hom to Admiralty Section

Final EM&A Review Report (Sep 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4672015_content.html

 

EP-324/2008/B

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Quarterly EM&A Report (May 2015 to Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html

 

EP-324/2008/B

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html

 

- Sai Kung District

 

EP-134/2002/K

Fill Bank at Tseung Kwan O Area 137

Quarterly EM&A Report (Apr 2015 to Jun 2015)(CV/2013/06)

http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html

 

EP-134/2002/K

Fill Bank at Tseung Kwan O Area 137

Monthly EM&A Report (Jul 2015)(CV/2013/06)

http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html

 

EP-438/2012/H

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4532014_content.html

 

- Sha Tin District

 

EP-135/2002/J 

Sha Tin New Town - Stage II TrunkRoad T3 and Associated Roadworks

Monthly Environmental Monitoring and Audit Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4282014_content.html

 

EP-438/2012/H

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4532014_content.html

 

- Tai Po District

 

EP-303/2008

Drainage Improvement in Sha Tin and Tai Po

Monthly EM&A Report (Jul 2015) (DC/2009/22)

http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html

 

EP-324/2008/B

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Quarterly EM&A Report (May 2015 to Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html

 

EP-324/2008/B

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html

 

- Tsuen Wan District

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/23)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2009/24)(Apr 2015 to Jun 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/24)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Final EM&A Report (EMA/087)(Dec 2009 to Jul 2015) Rev.B

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

- Tuen Mun District

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Aug 2015)(HY/2012/07)

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Jul 2015)(HY/2013/12)

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Aug 2015)(HY/2012/08)

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

EP-321/2008/B

Upgrading of Pillar Point Sewage Treatment Works

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4372014_content.html

 

EP-331/2009

Widening of Tsing Lun Road, Tuen Mun

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html

 

EP-381/2009

Tuen Mun Area 54 Sewage Pumping Station

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html

 

EP-381/2009

Tuen Mun Area 54 Sewage Pumping Station

Quarterly EM&A Report (May 2015 to Jul 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html

 

EP-210/2005/B

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Monthly EM&A Report (Jul 2015) (CV/2013/06)

http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html

 

- Yuen Long District

 

FEP-24/004/1998/I

West Rail, Phase 1

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1382012_content.html

 

EP-450/2013

Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep4502013_content.html

 

EP-411/2011 

Improvement to Pok Oi Interchange

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html

 

EP-490/2014

Drainage Works at Mai Po

Monthly EM&A Report(Jul 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep4902014_content.html

 

EP-349/2009/I

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep3772012_content.html

 

- Kwai Tsing District

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/23)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2009/24)(Apr 2015 to Jun 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/24)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Final EM&A Report (EMA/087)(Dec 2009 to Jul 2015) Rev.B

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-426/2011/A

Providing Sufficient Water Depth for Kwai Tsing Container Basin and its Approach Channel

Monthly Environmental Monitoring & Audit Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep3692012_content.html

 

- Central & Western District

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/23)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2009/24)(Apr 2015 to Jun 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/24)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Final EM&A Report (EMA/087)(Dec 2009 to Jul 2015) Rev.B

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-313/2008/J 

West Island Line   

Monthly EM&A Report(Aug 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4522014_content.html

 

EP-122/2002/D

Central Reclamation Phase III

Monthly EM&A Report (Jul 2015) (HK/2011/07)

http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html

 

EP-122/2002/D

Central Reclamation Phase III

Quarterly EM&A Report (May 2015 to Jul 2015) (HK/2011/07)

http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html

 

EP-407/2010/E

South Island Line (East)

Monthly EM&A Report(Aug 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4512014_content.html

 

EP-376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Jul 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

EP-376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Quarterly EM&A Report (May to Jul 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

EP-364/2009/C

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4432014_content.html

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Jul 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

EP-436/2012/B

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4672015_content.html

 

EP-436/2012/B

Shatin to Central Link - Hung Hom to Admiralty Section

Final EM&A Review Report (Sep 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4672015_content.html

 

EP-408/2011/B

Central Police Station Conservation and Revitalisation Project

Monthly EM&A Report (No.45)

http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html

 

- Wan Chai District

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/23)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2009/24)(Apr 2015 to Jun 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/24)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Final EM&A Report (EMA/087)(Dec 2009 to Jul 2015) Rev.B

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-122/2002/D

Central Reclamation Phase III

Monthly EM&A Report (Jul 2015) (HK/2011/07)

http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html

 

EP-122/2002/D

Central Reclamation Phase III

Quarterly EM&A Report (May 2015 to Jul 2015) (HK/2011/07)

http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html

 

EP-407/2010/E

South Island Line (East)

Monthly EM&A Report(Aug 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4512014_content.html

 

EP-376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Jul 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

EP-376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Quarterly EM&A Report (May to Jul 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

EP-416/2011

ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html

 

EP-416/2011

ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter

Final EM&A Report (Aug 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html

 

EP-444/2012/A

MTR Wan Chai Station Lee Tung Street Subway

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4412014_content.html

 

EP-364/2009/C

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4432014_content.html

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Jul 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

EP-436/2012/B

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4672015_content.html

 

EP-436/2012/B

Shatin to Central Link - Hung Hom to Admiralty Section

Final EM&A Review Report (Sep 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4672015_content.html

 

- Eastern District

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/23)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2009/24)(Apr 2015 to Jun 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/24)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Final EM&A Report (EMA/087)(Dec 2009 to Jul 2015) Rev.B

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-122/2002/D

Central Reclamation Phase III

Monthly EM&A Report (Jul 2015) (HK/2011/07)

http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html

 

EP-122/2002/D

Central Reclamation Phase III

Quarterly EM&A Report (May 2015 to Jul 2015) (HK/2011/07)

http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html

 

EP-416/2011

ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html

 

EP-416/2011

ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter

Final EM&A Report (Aug 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html

 

EP-364/2009/C

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4432014_content.html

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Jul 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

EP-436/2012/B

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4672015_content.html

 

EP-436/2012/B

Shatin to Central Link - Hung Hom to Admiralty Section

Final EM&A Review Report (Sep 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4672015_content.html

 

-  Southern District

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/23)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2009/24)(Apr 2015 to Jun 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/24)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Final EM&A Report (EMA/087)(Dec 2009 to Jul 2015) Rev.B

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-407/2010/E

South Island Line (East)

Monthly EM&A Report(Aug 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4512014_content.html

 

EP-436/2012/B

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4672015_content.html

 

EP-436/2012/B

Shatin to Central Link - Hung Hom to Admiralty Section

Final EM&A Review Report (Sep 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4672015_content.html

 

EP-487/2014

Tai Shue Wan Development at Ocean Park

Monthly EM&A Report (17 Jul 2015 - 16 Aug 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep4872014_content.html

 

- Kowloon City District

 

EP-437/2012

Shatin to Central Link - Mong Kok East to Hung Hom Section

Monthly EM&A Report No.35 (Jul 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Jun 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Jul 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Jul 2015)(KL/2010/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (May 2015 to Jul 2015)(KL/2010/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Jul 2015)(KL/2012/02)(version 1.0)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-344/2009 

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report (Jun 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

EP-344/2009 

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report (Jul 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

EP-344/2009 

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report (Jul 2015)(KL/2010/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

EP-344/2009 

New Sewage Pumping Stations Serving Kai Tak Development

Quarterly EM&A Report (May 2015 to Jul 2015)(KL/2010/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

EP-438/2012/H

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4532014_content.html

 

- Kwun Tong District

 

EP-140/2002

Planning and Engineering Feasibility Study for Development at Anderson Road

Monthly EM&A Report (Jul 2015)(CV/2007/03)

http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html

 

EP-399/2010/C

Kwun Tong Line Extension

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4622015_content.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Jun 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Jul 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Jul 2015)(KL/2010/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (May 2015 to Jul 2015)(KL/2010/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Jul 2015)(KL/2012/02)(version 1.0)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-344/2009 

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report (Jun 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

EP-344/2009 

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report (Jul 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

EP-344/2009 

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report (Jul 2015)(KL/2010/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

EP-344/2009 

New Sewage Pumping Stations Serving Kai Tak Development

Quarterly EM&A Report (May 2015 to Jul 2015)(KL/2010/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

 

- Sham Shui Po District

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/23)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2009/24)(Apr 2015 to Jun 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/24)(Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Final EM&A Report (EMA/087)(Dec 2009 to Jul 2015) Rev.B

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

- Wong Tai Sin District

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Jun 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Jul 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Jul 2015)(KL/2010/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (May 2015 to Jul 2015)(KL/2010/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Jul 2015)(KL/2012/02)(version 1.0)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-344/2009 

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report (Jun 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

EP-344/2009 

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report (Jul 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

EP-344/2009 

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report (Jul 2015)(KL/2010/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

EP-344/2009 

New Sewage Pumping Stations Serving Kai Tak Development

Quarterly EM&A Report (May 2015 to Jul 2015)(KL/2010/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

EP-438/2012/H

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4532014_content.html

 

 

- Yau Tsim Mong District

 

EP-437/2012

Shatin to Central Link - Mong Kok East to Hung Hom Section

Monthly EM&A Report No.35 (Jul 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html

 

EP-438/2012/H

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4532014_content.html

 

EP-317/2009/A

Tsim Sha Tsui Station Northern Subway

Monthly EM&A Report (Jul 2015)(Final)

http://www.epd.gov.hk/eia/english/register/index8/vep4232014_content.html

 

EP-436/2012/B

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4672015_content.html

 

EP-436/2012/B

Shatin to Central Link - Hung Hom to Admiralty Section

Final EM&A Review Report (Sep 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4672015_content.html

 

EP-414/2011

Reprovision of Bridges D1 and T in West Kowloon

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html

 

EP-414/2011

Reprovision of Bridges D1 and T in West Kowloon

Monthly EM&A Report (Aug 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html

 

EP-349/2009/I

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Jul 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep3772012_content.html

 

EP-453/2013/A

Underpass Road and Austin Road Flyover Serving the West Kowloon Cultural District

Baseline EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4252014_content.html