Monthly Update of Documents Uploaded
Documents Uploaded to the EIAO
Website
|
(for the period between 16 Sep 2015 to 15 Oct 2015)
|
|
Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
Application
for EIA Study Brief
|
|
NIL
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
DIR-241/2015
|
Proposed Sewage Pumping Station
and Dry Weather Flow Interceptor at Cherry Street Box Culvert
|
Decision of DEP
|
http://www.epd.gov.hk/eia/register/permission/conditions/dir2412015.pdf
|
|
DIR-242/2015
|
Queen’s Hill Sewage Pumping
Station
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/dir242/dir242.pdf
|
|
Application
for Approval of EIA Report
|
|
EIA-230/2015
|
Chai Wan Government Complex and Vehicle
Depot
|
Approval Conditions
|
http://www.epd.gov.hk/eia/register/report/conditions/aeiar2302015.pdf
|
|
EIA-232/2015
|
Operation of the Existing Tai Lam
Explosives Magazine at Tai Shu Ha, Yuen Long for Liantang / Heung Yuen Wai Boundary Control Point Project
|
EIA Report
|
http://www.epd.gov.hk/eia/register/report/eiareport/eia_2322015/HTML(Index)/index.htm
|
|
Application
for Environmental Permit
|
|
NIL
|
|
Application
for Variation of an Environmental Permit
|
|
VEP-481/2015
|
An Extension to the
Existing Boardwalk and New Floating Mudflat Bird-watching Hide at Mai Po
Nature Reserve for Education and Conservation Purposes
|
Environmental
Permit issued (EP-264/2007/A)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4812015.htm
|
|
VEP-482/2015
|
Shatin to Central Link - Hung Hom to Admiralty Section
|
Environmental
Permit issued (EP-436/2012/C)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4822015.htm
|
|
VEP-483/2015
|
Central
Reclamation Phase III
|
Environmental
Permit issued (EP-122/2002/E)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4832015.htm
|
|
Application
for Further Environmental Permit
|
|
NIL
|
|
Submission as
required by Environmental Permit Condition - Design / Environmental
Submissions
|
|
EP-427/2011/A
|
Dredging, Management and Capping of
Contaminated Sediment Disposal Facility to the South of The Brothers
|
Monthly Progress Report (Jul 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html
|
|
FEP-09/364/2009/B
|
Wan Chai Development Phase II - Central - Wan
Chai
Bypass at Wan Chai
West (Contract No. HK/2012/08) - Tunnel Work
|
Landscape Plan(HK/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
FEP-01/474/2013
|
NENT - Shek Wu Hui
Sewage Treatment Works - Further Expansion at Fanling North New
Development Area
|
Updated Environmental Monitoring and Audit
(EM&A) Manual under The Contract
|
http://www.epd.gov.hk/eia/english/register/index7/fep1522014_content.html
|
|
Submission
as required by Environmental Permit Condition - EM&A Reports
|
|
|
Island District
|
Central & Western District
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
- Island District
|
|
EP-354/2009/D
|
Tuen Mun
- Chek
Lap Kok
Link
|
Monthly Environmental Monitoring and Audit Report (Aug
2015)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun
- Chek
Lap Kok
Link
|
Monthly Environmental Monitoring and Audit Report (Jul
2015)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok
Link
|
Monthly Environmental Monitoring and Audit
Report (Aug 2015)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines
(GT5 & GT7) into a Combined Cycle Unit
|
Monthly Environmental Monitoring And Audit
Report (Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at Lamma
Extension
|
Monthly Environmental Monitoring and Audit
Report (Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
EP-392/2010
|
Improvement of Fresh Water Supply to Cheung
Chau
|
Monthly EM&A Report (Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3922010_content.html
|
|
EP-452/2013
|
Temporary Sewage Pumping Station Ancillary
to Tung Chung Area 56 Public Housing Development
|
Monthly EM&A Report (Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4522013_content.html
|
|
EP- 01/097/2001/C
|
Water Recreation Centre at Penny's Bay
(part & remaining part)
|
Monthly Environmental Monitoring and Audit
Report (No. 120)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
119th Monthly EM&A Report (12 Jul 2015
to 11 Aug 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
FEP-01/395/2010/B
|
Organic Waste Treatment Facilities, Phase I
|
Second
Monthly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/index7/fep1602015_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai - Macao Bridge
Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Jul 2015)(HY/2013/04)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai - Macao Bridge
Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Jul 2015)(HY/2013/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-237/2005/B
|
Drainage Improvements in Southern Lantau
|
Monthly Environmental Monitoring &
Audit Report (Jun 2015) (DP 04/2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
EP-237/2005/B
|
Drainage Improvements in Southern Lantau
|
Monthly Environmental Monitoring &
Audit Report (Jul 2015) (DP 04/2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
EP-352/2009/A
|
Hong Kong - Zhuhai - Macao Bridge
Hong Kong Link Road
|
Quarterly EM&A Report (Mar 2015 to May
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3392013_content.html
|
|
EP-349/2009/I
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (Jul 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3772012_content.html
|
|
- North District
|
|
EP-404/2011/C
|
Liantang / Heung Yuen Wai Boundary Control
Point and Associated Works
|
Monthly EM&A Report (Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
EP-277/2007/A
|
Drainage Improvements in Northern New
Territories - Package C
|
Monthly EM&A Report(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
EP-430/2011
|
Regulation of Shenzhen River Stage IV
|
Monthly EM&A Report(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
EP-436/2012/B
|
Shatin to Central Link - Hung Hom to Admiralty
Section
|
Monthly EM&A Report (Jul 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4672015_content.html
|
|
EP-436/2012/B
|
Shatin to Central Link - Hung Hom to Admiralty
Section
|
Final EM&A
Review Report (Sep 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4672015_content.html
|
|
EP-324/2008/B
|
Widening of Tolo Highway/Fanling
Highway between Island House Interchange and Fanling
|
Quarterly EM&A Report (May 2015 to Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html
|
|
EP-324/2008/B
|
Widening of Tolo Highway/Fanling
Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Jul 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html
|
|
- Sai
Kung District
|
|
EP-134/2002/K
|
Fill Bank at Tseung Kwan O Area 137
|
Quarterly EM&A Report (Apr 2015 to Jun
2015)(CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
EP-134/2002/K
|
Fill Bank at Tseung Kwan O Area 137
|
Monthly EM&A Report (Jul
2015)(CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
EP-438/2012/H
|
Shatin to Central Link - Tai Wai to Hung Hom
Section
|
Monthly EM&A Report (Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4532014_content.html
|
|
- Sha
Tin District
|
|
EP-135/2002/J
|
Sha Tin New Town - Stage II TrunkRoad
T3 and Associated Roadworks
|
Monthly Environmental Monitoring and Audit
Report (Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4282014_content.html
|
|
EP-438/2012/H
|
Shatin to Central Link - Tai Wai to Hung Hom
Section
|
Monthly EM&A Report (Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4532014_content.html
|
|
- Tai Po District
|
|
EP-303/2008
|
Drainage Improvement in Sha Tin and Tai Po
|
Monthly EM&A Report (Jul 2015)
(DC/2009/22)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
EP-324/2008/B
|
Widening of Tolo Highway/Fanling
Highway between Island House Interchange and Fanling
|
Quarterly EM&A Report (May 2015 to Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html
|
|
EP-324/2008/B
|
Widening of Tolo Highway/Fanling
Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Jul 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html
|
|
- Tsuen
Wan District
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (DC/2009/24)(Apr 2015 to Jun 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18)(Jul 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Final EM&A Report (EMA/087)(Dec 2009 to
Jul 2015) Rev.B
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
- Tuen
Mun
District
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok
Link
|
Monthly Environmental Monitoring and Audit
Report (Aug 2015)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok
Link
|
Monthly Environmental Monitoring and Audit
Report (Jul 2015)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok
Link
|
Monthly Environmental Monitoring and Audit
Report (Aug 2015)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-321/2008/B
|
Upgrading of Pillar Point Sewage Treatment
Works
|
Monthly EM&A Report (Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4372014_content.html
|
|
EP-331/2009
|
Widening of Tsing Lun
Road, Tuen
Mun
|
Monthly EM&A Report (Jul 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
EP-381/2009
|
Tuen Mun Area 54 Sewage Pumping Station
|
Monthly EM&A Report (Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html
|
|
EP-381/2009
|
Tuen Mun Area 54 Sewage Pumping Station
|
Quarterly EM&A Report (May 2015 to Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html
|
|
EP-210/2005/B
|
Expansion and Extension of Fill Bank at Tuen
Mun
Area 38
|
Monthly EM&A Report (Jul 2015)
(CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
- Yuen Long District
|
|
FEP-24/004/1998/I
|
West Rail, Phase 1
|
Monthly EM&A Report (Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1382012_content.html
|
|
EP-450/2013
|
Construction of Cycle Tracks and the
associated Supporting Facilities from Sha Po Tsuen
to Shek
Sheung
River
|
Monthly EM&A Report (Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4502013_content.html
|
|
EP-411/2011
|
Improvement to Pok Oi
Interchange
|
Monthly EM&A Report (Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html
|
|
EP-490/2014
|
Drainage Works at Mai Po
|
Monthly EM&A Report(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4902014_content.html
|
|
EP-349/2009/I
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (Jul 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3772012_content.html
|
|
- Kwai
Tsing
District
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (DC/2009/24)(Apr 2015 to Jun 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18)(Jul 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Final EM&A Report (EMA/087)(Dec 2009 to
Jul 2015) Rev.B
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-426/2011/A
|
Providing Sufficient Water Depth for Kwai
Tsing
Container Basin and its Approach Channel
|
Monthly Environmental Monitoring &
Audit Report (Jul 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3692012_content.html
|
|
- Central & Western District
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (DC/2009/24)(Apr 2015 to Jun 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18)(Jul 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Final EM&A Report (EMA/087)(Dec 2009 to
Jul 2015) Rev.B
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-313/2008/J
|
West Island Line
|
Monthly EM&A Report(Aug
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4522014_content.html
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Jul 2015) (HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Quarterly EM&A Report (May 2015 to Jul
2015) (HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
EP-407/2010/E
|
South Island Line (East)
|
Monthly EM&A Report(Aug
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4512014_content.html
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are
classified as primary/district distributor roads
|
Monthly EM&A Report (Jul
2015)(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are
classified as primary/district distributor roads
|
Quarterly EM&A Report (May to Jul
2015)(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
EP-364/2009/C
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4432014_content.html
|
|
EP-356/2009
|
Wan Chai Development Phase
II and Central-Wan Chai
Bypass
|
Monthly EM&A Report (Jul
2015)(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
EP-436/2012/B
|
Shatin to Central Link - Hung Hom to Admiralty
Section
|
Monthly EM&A Report (Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4672015_content.html
|
|
EP-436/2012/B
|
Shatin to Central Link - Hung Hom to Admiralty
Section
|
Final EM&A
Review Report (Sep 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4672015_content.html
|
|
EP-408/2011/B
|
Central Police Station Conservation and Revitalisation
Project
|
Monthly EM&A Report (No.45)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
- Wan Chai
District
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (DC/2009/24)(Apr 2015 to Jun 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report(DC/2007/23,DC/2009/10,DC/2009/17,
DC/2009/18)(Jul 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Final EM&A Report (EMA/087)(Dec 2009 to
Jul 2015) Rev.B
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Jul
2015) (HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Quarterly EM&A Report (May 2015 to Jul
2015) (HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
EP-407/2010/E
|
South Island Line (East)
|
Monthly EM&A Report(Aug
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4512014_content.html
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are
classified as primary/district distributor roads
|
Monthly EM&A Report (Jul
2015)(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified
as primary/district distributor roads
|
Quarterly EM&A Report (May to Jul
2015)(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at
Causeway Bay Typhoon Shelter
|
Monthly EM&A Report (Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at
Causeway Bay Typhoon Shelter
|
Final EM&A Report (Aug 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
EP-444/2012/A
|
MTR Wan Chai Station Lee Tung
Street Subway
|
Monthly EM&A Report (Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4412014_content.html
|
|
EP-364/2009/C
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4432014_content.html
|
|
EP-356/2009
|
Wan Chai Development Phase
II and Central-Wan Chai
Bypass
|
Monthly EM&A Report (Jul
2015)(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
EP-436/2012/B
|
Shatin to Central Link - Hung Hom to Admiralty
Section
|
Monthly EM&A Report (Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4672015_content.html
|
|
EP-436/2012/B
|
Shatin to Central Link - Hung Hom to Admiralty
Section
|
Final EM&A
Review Report (Sep 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4672015_content.html
|
|
- Eastern District
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (DC/2009/24)(Apr 2015 to Jun 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18)(Jul 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Final EM&A Report (EMA/087)(Dec 2009 to
Jul 2015) Rev.B
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Jul
2015) (HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Quarterly EM&A Report (May 2015 to Jul
2015) (HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at
Causeway Bay Typhoon Shelter
|
Monthly EM&A Report (Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at
Causeway Bay Typhoon Shelter
|
Final EM&A Report (Aug 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
EP-364/2009/C
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4432014_content.html
|
|
EP-356/2009
|
Wan Chai Development Phase
II and Central-Wan Chai
Bypass
|
Monthly EM&A Report (Jul
2015)(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
EP-436/2012/B
|
Shatin to Central Link - Hung Hom to Admiralty
Section
|
Monthly EM&A Report (Jul 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4672015_content.html
|
|
EP-436/2012/B
|
Shatin to Central Link - Hung Hom to Admiralty
Section
|
Final EM&A
Review Report (Sep 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4672015_content.html
|
|
-
Southern District
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (DC/2009/24)(Apr 2015 to Jun 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18)(Jul 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Final EM&A Report (EMA/087)(Dec 2009 to
Jul 2015) Rev.B
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-407/2010/E
|
South Island Line (East)
|
Monthly EM&A Report(Aug
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4512014_content.html
|
|
EP-436/2012/B
|
Shatin to Central Link - Hung Hom to Admiralty
Section
|
Monthly EM&A Report (Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4672015_content.html
|
|
EP-436/2012/B
|
Shatin to Central Link - Hung Hom to Admiralty
Section
|
Final EM&A
Review Report (Sep 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4672015_content.html
|
|
EP-487/2014
|
Tai Shue Wan Development
at Ocean Park
|
Monthly EM&A Report (17 Jul 2015 - 16
Aug 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4872014_content.html
|
|
- Kowloon City District
|
|
EP-437/2012
|
Shatin to Central Link - Mong Kok
East to Hung Hom
Section
|
Monthly EM&A Report No.35 (Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak
Development
|
Monthly EM&A Report (Jun
2015)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak
Development
|
Monthly EM&A Report (Jul
2015)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak
Development
|
Monthly EM&A Report (Jul
2015)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak
Development
|
Quarterly EM&A Report (May 2015 to Jul
2015)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak
Development
|
Monthly EM&A Report (Jul
2015)(KL/2012/02)(version 1.0)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak
Development
|
Monthly EM&A Report (Jun
2015)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak
Development
|
Monthly EM&A Report (Jul
2015)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak
Development
|
Monthly EM&A Report (Jul
2015)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak
Development
|
Quarterly EM&A Report (May 2015 to Jul
2015)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
EP-438/2012/H
|
Shatin to Central Link - Tai Wai to Hung Hom
Section
|
Monthly EM&A Report (Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4532014_content.html
|
|
- Kwun
Tong District
|
|
EP-140/2002
|
Planning and Engineering Feasibility Study
for Development at Anderson Road
|
Monthly EM&A Report (Jul
2015)(CV/2007/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
EP-399/2010/C
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Jul
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4622015_content.html
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak
Development
|
Monthly EM&A Report (Jun
2015)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak
Development
|
Monthly EM&A Report (Jul
2015)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak
Development
|
Monthly EM&A Report (Jul 2015)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak
Development
|
Quarterly EM&A Report (May 2015 to Jul
2015)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak
Development
|
Monthly EM&A Report (Jul
2015)(KL/2012/02)(version 1.0)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak
Development
|
Monthly EM&A Report (Jun
2015)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak
Development
|
Monthly EM&A Report (Jul
2015)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak
Development
|
Monthly EM&A Report (Jul
2015)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak
Development
|
Quarterly EM&A Report (May 2015 to Jul
2015)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
|
|
|
|
|
|