Monthly Update of Documents
Uploaded
Documents Uploaded to the EIAO Website
|
|
(for the period between 16 September
2022
to 15 October 2022)
|
|
|
|
|
|
|
Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
|
|
|
|
|
Application
for EIA Study Brief
|
|
|
|
|
|
|
ESB-357/2022
|
Expansion
of Aberdeen Typhoon Shelter
|
EIA Study Briefs
Issued
|
https://www.epd.gov.hk/eia/register/study/latest/esb-357.pdf
|
|
|
|
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
|
|
|
|
DIR-294/2022
|
Decommissioning
of Remaining Portion of Middle Ash Lagoon in Tsang Tsui
|
Decisions of the DEP
|
https://www.epd.gov.hk/eia/register/permission/conditions/dir2942022.pdf
|
|
|
|
|
|
|
Application
for Approval of EIA Report
|
|
|
|
|
|
|
EIA-286/2022
|
Upgrading
of Tai Po Sewage Treatment Works
|
EIA Reports
|
https://www.epd.gov.hk/eia/register/report/eiareport/eia_2862022/index.htm
|
|
|
|
|
|
|
EIA-287/2022
|
Revitalisation
of Fo Tan Nullah
|
EIA Reports
|
https://www.epd.gov.hk/eia/register/report/eiareport/eia_2872022/HTML/index.htm
|
|
|
|
|
|
|
Application
for Environmental Permit
|
|
|
|
|
|
|
AEP-606/2022
|
Cycle
Track between Tsuen Wan and Tuen Mun (Tuen Mun to So Kwun Wat)
|
Environmental Permit issued (EP-606/2022)
|
https://www.epd.gov.hk/eia/register/permit/latest/ep6062022.htm
|
|
|
|
|
|
|
AEP-617/2022
|
Drainage
Improvement Works in Ta Kwu Ling
|
Environmental Permit issued (EP-617/2022)
|
https://www.epd.gov.hk/eia/register/permit/latest/ep6172022.htm
|
|
|
|
|
|
|
Application
for Variation of an Environmental Permit
|
|
|
|
|
|
|
VEP-621/2022
|
NENT
- Po Shek Wu Interchange Improvement
|
Environmental Permit issued (EP-471/2013/A)
|
https://www.epd.gov.hk/eia/register/permit/latest/vep6212022.htm
|
|
|
|
|
|
|
Application
for Further Environmental Permit
|
|
|
|
|
|
|
Nil
|
|
|
|
|
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental
Submissions
|
|
|
|
|
|
|
EP-565/2019
|
Yuen Long Effluent Polishing Plant
|
Contamination Assessment Report for Surplus
Activated Sludge Thickener House - 1 (Version 1.2)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5652019_content.html
|
|
|
|
|
|
|
EP-519/2016
|
Tung Chung New
Town Extension
|
River Park Plan
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
|
|
EP-519/2016
|
Tung Chung New
Town Extension
|
Plan for Review of Use of New Low Noise Road
Surfacing Material(s) (Tung Chung West)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
|
|
EP-600/2022
|
Re-provision of Open Cycle Gas Turbines at
Lamma Power Station
|
Waste Management Plan(Revision 1)
|
https://www.epd.gov.hk/eia/english/register/aep/ep6002021_content.html
|
|
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai Boundary Control
Point and Associated Works
|
Submission of Landscape Plan(Rev.5)Booklet 1
|
https://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai Boundary Control
Point and Associated Works
|
Submission of Landscape Plan(Rev.5)Booklet 2
|
https://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
|
|
EP-556/2018
|
Provision of Trunk Sewer to 3 Villages in Tai
Po: Ta Tit Yan, Yuen Tun Ha and Lo Lau Uk in Tai Po
|
Layout Plan and
Explanatory Statement of Layout Plans of the Project
|
https://www.epd.gov.hk/eia/english/register/aep/ep5562018_content.html
|
|
|
|
|
|
|
EP-581/2020
|
Airport City Link
|
Construction Works Schedule and Location Plans
|
https://www.epd.gov.hk/eia/english/register/aep/ep5812020_content.html
|
|
|
|
|
|
|
EP-538/2017
|
Outlying Islands Sewerage Stage 2 - South
Lantau Sewerage Works
|
Preservation and
Transplantation Plan for Plant Species of Conservation Importance(PTP)(Revision 23)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5382017_content.html
|
|
|
|
|
|
|
EP-469/2013
|
NENT - Sewage Pumping Stations in Kwu Tung
North New Development Areaf
|
Submission of Location Plans
|
https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html
|
|
|
|
|
|
|
EP-437/2012/A
|
Shatin to Central Link - Mong Kok East to
Hung Hom Section
|
Monthly Operational Airborne Rail Noise Monitoring Report No.4(Sep
2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5352017_content.html
|
|
|
|
|
|
|
EP-467/2013/A
|
Kwu Tung North New Development Area Road P1
and P2 and Associated New Kwu Tung Interchange and Pak Shek Au Interchange
Improvement
|
Traffic Noise Mitigation Plan (Version A)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html
|
|
|
|
|
|
|
EP-603/2022
|
Removal of 132kV Overhead Line and Pylons for
P-Line
|
Ecological Management Plan (P7 to P14)
|
https://www.epd.gov.hk/eia/english/register/aep/ep6032021_content.html
|
|
|
|
|
|
|
EP-586/2021
|
Pier Improvement at Lai Chi Wo
|
Monthly EM&A Report No. 1 for Lai Chi Wo Pier
|
https://www.epd.gov.hk/eia/english/register/aep/ep5862021_content.html
|
|
|
|
|
|
|
EP-586/2021
|
Pier Improvement at Lai Chi Wo
|
Monthly EM&A Report No. 2 for Lai Chi Wo Pier (Rev. 1)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5862021_content.html
|
|
|
|
|
|
|
Submission
as required by Environmental Permit Condition - EM&A Report
|
|
|
|
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
|
|
|
|
- Island District
|
|
|
|
|
|
|
EP-581/2020
|
Airport City Link
|
Construction Phase Monthly
EM&A Report (Jul and Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5812020_content.html
|
|
|
|
|
|
|
EP-207/2005/A
|
Siu Ho Wan Water Treatment
Works Extension
|
Monthly EM&A
Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5962021_content.html
|
|
|
|
|
|
|
EP-555/2018/A
|
New Wang Tong River Bridge
|
Monthly EM&A
Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5852020_content.html
|
|
|
|
|
|
|
EP-519/2016
|
Tung Chung New Town
Extension
|
Monthly EM&A Report
(Aug 2022) (Tung Chung West)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
|
|
EP-519/2016
|
Tung Chung New Town
Extension
|
Monthly EM&A Report
(Jul 2022) (Tung Chung East)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
|
|
EP-519/2016
|
Tung Chung New Town
Extension
|
Monthly EM&A Report
(Jul 2022) (Tung Chung West)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
|
|
EP-519/2016
|
Tung Chung New Town
Extension
|
Monthly EM&A Report
(Aug 2022) (Tung Chung East)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
|
|
EP-588/2021
|
Siu Ho Wan Station and Siu
Ho Wan Depot Replanning Works
|
Monthly EM&A
Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5882021_content.html
|
|
|
|
|
|
|
EP-600/2022
|
Re-provision of Open Cycle
Gas Turbines at Lamma Power Station
|
Monthly Environmental
Monitoring & Audit Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep6002021_content.html
|
|
|
|
|
|
|
EP-488/2014/A
|
Upgrading of Cheung Chau
Sewage Collection, Treatment and Disposal Facilities
|
Monthly EM&A Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5912021_content.html
|
|
|
|
|
|
|
EP-01/097/2001/C
|
Water Recreation Centre at
Penny's Bay (part & remaining part)
|
Monthly Environmental
Monitoring and Audit Report (No. 205)
|
https://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong
International Airport into a Three-Runway System
|
Construction Phase Monthly
EM&A Report No.80
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong
International Airport into a Three-Runway System
|
Quarterly EM&A Report
No.26 (Apr 2022 to Jun 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
EP-538/2017
|
Outlying Islands Sewerage
Stage 2 - South Lantau Sewerage Works
|
Monthly EM&A
Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5382017_content.html
|
|
|
|
|
|
|
FEP-01/353/2009/K
|
Hong Kong - Zhuha - Macao
Bridge (HZMB) Hong Kong Boundary Crossing Facilities (HKBCF) - The Road
Connection between HKBCF and the Airport, Chek Lap Kok
|
Construction Phase Monthly
EM&A Report No. 11 (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1902018_content.html
|
|
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A
Report(Jun 2022) (HY/2011/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
|
|
EP-083/2000
|
Conversion of Two Existing
Gas Turbines (GT5 & GT7) into a Combined Cycle Unit
|
Monthly Environmental
Monitoring And Audit Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
|
|
|
|
EP-532/2017/A
|
Mui Wo Lai Chi Yuen
Cemetery Extension
|
Monthly EM&A Report
(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5582019_content.html
|
|
|
|
|
|
|
FEP-01/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated with
the double berth jetty at LNG Terminal
|
Monthly Environmental Monitoring and Audit (EM&A)
Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html
|
|
|
|
|
|
|
FEP-02/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated with
the subsea gas pipeline for Lamma Power Station (LPS) and the associated
Gas Receiving Station (GRS) in LPS
|
Monthly Environmental Monitoring and Audit (EM&A)
Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html
|
|
|
|
|
|
|
FEP-03/558/2018/B
|
Hong Kong Offshore LNG Terminal - Works associated with
the subsea gas pipeline for Black Point Power Station (BPPS) and the
associated Gas Receiving Station (GRS) in BPPS
|
Monthly Environmental Monitoring and Audit (EM&A)
Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5972021_content.html
|
|
|
|
|
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
204th Monthly EM&A Report (12 Aug 2022 –
11 Sep 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
|
|
|
|
EP-071/2000/D
|
1,800
MW Gas-Fired Power Station at Lamma Extension
|
Monthly Environmental Monitoring and Audit
Report Unit L12 (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html
|
|
|
|
|
|
|
EP-071/2000/D
|
1,800
MW Gas-Fired Power Station at Lamma Extension
|
Monthly Environmental Monitoring And Audit
Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html
|
|
|
|
|
|
|
EP-353/2009/K
|
Hong
Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report(Aug 2022)(HY/2019/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
|
|
EP-353/2009/K
|
Hong
Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report(Jun
2022) (HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
|
|
EP-429/2012/A
|
Development
of the Integrated Waste Management Facilities Phase 1
|
Monthly
EM&A Report No.50(Rev A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
|
FEP-01/429/2012/A
|
Development
of the Integrated Waste Management Facilities Phase 1
|
Monthly
EM&A Report No.50(Rev A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
|
EP-456/2013/B
|
Drainage Improvement Works at Ngong Ping
|
Monthly Environmental Monitoring And Audit
Report (Aug 2022)(DC/2019/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5992021_content.html
|
|
|
|
|
|
|
EP-560/2018
|
Intermodal Transfer Terminal – Bonded
Vehicular Bridge and Associated Roads
|
EM&A Report(Jul 2022)(Rev.C)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5602018_content.html
|
|
|
|
|
|
|
EP-560/2018
|
Intermodal Transfer Terminal – Bonded
Vehicular Bridge and Associated Roads
|
EM&A Report(Aug 2022)(Rev.A)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5602018_content.html
|
|
|
|
|
|
|
EP-312/2008/A
|
Disposal of Contaminated Sediment - Dredging,
Management and Capping of sediment Disposal Facility at Sha Chau
|
Monthly EM&A Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html
|
|
|
|
|
|
|
- North District
|
|
|
|
|
|
|
EP-534/2017/A
|
Site
Formation and Associated Infrastructural Works for Development of
Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery
|
Monthly EM&A Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html
|
|
|
|
|
|
|
EP-534/2017
|
Site
Formation and Associated Infrastructural Works for Development of
Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery
|
Monthly EM&A Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html
|
|
|
|
|
|
|
FEP-01/534/2017
|
Site
Formation and Associated Infrastructural Works for Development of
Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery
|
Monthly EM&A Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html
|
|
|
|
|
|
|
FEP-01/534/2017/A
|
Site
Formation and Associated Infrastructural Works for Development of
Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery
|
Monthly EM&A Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html
|
|
|
|
|
|
|
FEP-01/470/2013
|
Utilization of Treated
Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works
|
Monthly EM&A Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep2042021_content.html
|
|
|
|
|
|
|
EP-466/2013
|
NENT - Castle Peak Road
Diversion
|
Monthly EM&A Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html
|
|
|
|
|
|
|
EP-467/2013/A
|
Kwu Tung North New
Development Area Road P1 and P2 and Associated New Kwu Tung Interchange and
Pak Shek Au Interchange Improvement
|
Monthly EM&A Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html
|
|
|
|
|
|
|
EP-468/2013/A
|
Kwu Tung North New
Development Area Road D1 to D5
|
Monthly EM&A Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html
|
|
|
|
|
|
|
EP-469/2013
|
NENT - Sewage Pumping
Stations in Kwu Tung North New Development Areaf
|
Monthly EM&A Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html
|
|
|
|
|
|
|
EP-470/2013/A
|
NENT - Utilization of
Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works
|
Monthly EM&A Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep6142022_content.html
|
|
|
|
|
|
|
EP-473/2013/A
|
Fanling Bypass Eastern
Section
|
Monthly EM&A Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary
Wholesale Market in Fanling North New Development Area
|
Monthly EM&A Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
|
|
|
EP-477/2013/A
|
Development
of Lok Ma Chau Loop
|
Monthly EM&A Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5952021_content.html
|
|
|
|
|
|
|
EP-329/2009
|
Provision of Cremators at
Wo Hop Shek Crematorium
|
Final
EM&A Report(Mar 2020 to Jun 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
|
|
|
|
EP-517/2017/A
|
Expansion
of Sha Tau Kok Sewage Treatment Works
|
Monthly EM&A Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html
|
|
|
|
|
|
|
EP-510/2016
|
Police Facilities in
Kong Nga Po
|
Monthly EM&A Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5102016_content.html
|
|
|
|
|
|
|
FEP-02/474/2013
|
Shek Wu Hui Effluent Polishing Plant
|
Monthly
EM&A Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html
|
|
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated Works
|
Monthly EM&A
Report (Aug 2022)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
|
|
FEP-01/460/2013/A
|
Development of Organic Waste Treatment
Facilities, Phase 2
|
Quarterly EM&A Report (Jun 2022 to Aug
2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5792020_content.html
|
|
|
|
|
|
|
FEP-01/460/2013/A
|
Development of Organic Waste Treatment
Facilities, Phase 2
|
Monthly EM&A Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5792020_content.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link - Hung Hom to
Admiralty Section
|
Monthly EM&A Report (Aug
2022)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
- Sai Kung District
|
|
|
|
|
|
|
EP-308/2008/B
|
South-East New Territories Landfill Extension
|
Monthly EM&A Report No.43(Jul 2022)(V1)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
|
FEP-01/308/2008/B
|
South-East New Territories Landfill Extension
|
Monthly EM&A Report No.43(Jul 2022)(V1)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
|
EP-308/2008/B
|
South-East New Territories Landfill Extension
|
Monthly EM&A Report No.42(Jun 2022)(V1)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
|
FEP-01/308/2008/B
|
South-East New Territories Landfill Extension
|
Monthly EM&A Report No.42(Jun 2022)(V1)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
|
EP-308/2008/B
|
South-East New Territories Landfill Extension
|
Monthly EM&A Report No.44(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
|
FEP-01/308/2008/B
|
South-East New Territories Landfill Extension
|
Monthly EM&A Report No.44(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
|
EP-308/2008/B
|
South-East New Territories Landfill Extension
|
Quarterly EM&A Report (Apr 2022 to Jun
2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
|
FEP-01/308/2008/B
|
South-East New Territories Landfill Extension
|
Quarterly EM&A Report (Apr 2022 to Jun
2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
|
EP-503/2015/A
|
Desalination Plant at Tseung Kwan O
|
15th Quarterly EM&A Report(Feb 2022 to
Apr 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5402018_content.html
|
|
|
|
|
|
|
EP-513/2016
|
Development of Anderson Road Quarry site -
Road Improvement Works
|
Monthly EM&A Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html
|
|
|
|
|
|
|
EP-459/2013
|
Cross Bay Link, Tseung Kwan O
|
Monthly EM&A Report (Aug 2022)(Version 2)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
|
|
|
|
|
|
|
EP-516/2016
|
Port Shelter Sewerage,
Stage3 - Sewerage Works at Po Toi O
|
Monthly EM&A Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5162016_content.html
|
|
|
|
|
|
|
EP-134/2002/O
|
Fill Bank at Tseung Kwan O
Area 137
|
Monthly Environmental
Monitoring and Audit Report (May 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep6032021_content.html
|
|
|
|
|
|
|
EP-134/2002/O
|
Fill Bank at Tseung Kwan O
Area 137
|
Monthly Environmental
Monitoring and Audit Report (Apr 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep6032021_content.html
|
|
|
|
|
|
|
EP-319/2009/D
|
Development of a Biodiesel
Plant at Tseung Kwan O Industrial Estate
|
Monthly EM&A Report
(Aug 2022) (V.1)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4242014_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel
and Associated Works ED/2018/04 - Cha Kwo Ling
|
Monthly EM&A Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel
and Associated Works
|
Monthly EM&A Report (Aug 2022)(Version 1.0)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
|
- Sha Tin District
|
|
|
|
|
|
|
EP-494/2015
|
In-situ Reprovisioning of Sha Tin Water Treatment Works -
South Works
|
Monthly EM&A Report No.78
|
http://www.epd.gov.hk/eia/english/register/aep/ep4942014_content.html
|
|
|
|
|
|
|
EP-463/2013/B
|
Widening and
Reconstruction of Tai Po Road (Sha Tin Section)
|
Monthly EM&A
Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5142016_content.html
|
|
|
|
|
|
|
EP-533/2017/A
|
Sha Tin Cavern Sewage Treatment Works
|
Monthly EM&A Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep6182022_content.html
|
|
|
|
|
|
|
- Tai Po District
|
|
|
|
|
|
|
EP-597/2021
|
Sai O Trunk Sewer Sewage
Pumping Station
|
Monthly EM&A Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5972021_content.html
|
|
|
|
|
|
|
FEP-01/470/2013
|
Utilization of Treated
Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works
|
Monthly EM&A Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep2042021_content.html
|
|
|
|
|
|
|
EP-466/2013
|
NENT - Castle Peak Road
Diversion
|
Monthly EM&A
Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html
|
|
|
|
|
|
|
EP-467/2013/A
|
Kwu Tung North New
Development Area Road P1 and P2 and Associated New Kwu Tung Interchange and
Pak Shek Au Interchange Improvement
|
Monthly EM&A
Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html
|
|
|
|
|
|
|
EP-468/2013/A
|
Kwu Tung North New
Development Area Road D1 to D5
|
Monthly EM&A
Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html
|
|
|
|
|
|
|
EP-469/2013
|
NENT - Sewage Pumping
Stations in Kwu Tung North New Development Areaf
|
Monthly EM&A
Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html
|
|
|
|
|
|
|
EP-470/2013/A
|
NENT - Utilization of
Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works
|
Monthly EM&A
Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep6142022_content.html
|
|
|
|
|
|
|
EP-473/2013/A
|
Fanling Bypass Eastern
Section
|
Monthly EM&A
Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary
Wholesale Market in Fanling North New Development Area
|
Monthly EM&A
Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
|
|
|
- Tsuen Wan
District
|
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong International Airport
into a Three-Runway System
|
Construction Phase Monthly EM&A Report
No.80
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong International Airport
into a Three-Runway System
|
Quarterly EM&A Report No.26 (Apr 2022 to
Jun 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
- Tuen Mun
District
|
|
|
|
|
|
|
EP-429/2012/A
|
Development
of the Integrated Waste Management Facilities Phase 1
|
Monthly
EM&A Report No.50(Rev A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
|
FEP-01/429/2012/A
|
Development
of the Integrated Waste Management Facilities Phase 1
|
Monthly
EM&A Report No.50(Rev A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong
International Airport into a Three-Runway System
|
Construction Phase Monthly
EM&A Report No.80
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong
International Airport into a Three-Runway System
|
Quarterly EM&A Report
No.26 (Apr 2022 to Jun 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
FEP-01/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated with
the double berth jetty at LNG Terminal
|
Monthly Environmental Monitoring and Audit (EM&A)
Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html
|
|
|
|
|
|
|
FEP-02/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated with
the subsea gas pipeline for Lamma Power Station (LPS) and the associated
Gas Receiving Station (GRS) in LPS
|
Monthly Environmental Monitoring and Audit (EM&A)
Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html
|
|
|
|
|
|
|
FEP-03/558/2018/B
|
Hong Kong Offshore LNG Terminal - Works associated with
the subsea gas pipeline for Black Point Power Station (BPPS) and the
associated Gas Receiving Station (GRS) in BPPS
|
Monthly Environmental Monitoring and Audit (EM&A)
Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5972021_content.html
|
|
|
|
|
|
|
EP-210/2005/E
|
Expansion and Extension of
Fill Bank at Tuen Mun Area 38
|
Monthly EM&A Report
(May 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep6072021_content.html
|
|
|
|
|
|
|
EP-507/2016/D
|
Additional Gas-fired Generation Units Project
|
Monthly EM&A Report no.69
|
https://www.epd.gov.hk/eia/english/register/index8/vep6052021_content.html
|
|
|
|
|
|
|
FEP-04/507/2016/D
|
Additional Gas-fired Generation Units Project
- Installation of one additional gas-fired generation unit (CCGT unit No.
2) at the Black Point Power
|
Monthly EM&A Report no.69
|
https://www.epd.gov.hk/eia/english/register/index8/vep6062021_content.html
|
|
|
|
|
|
|
EP-507/2016/D
|
Additional Gas-fired Generation Units Project
|
Quarterly EM&A Report No.23
|
https://www.epd.gov.hk/eia/english/register/index8/vep6052021_content.html
|
|
|
|
|
|
|
FEP-04/507/2016/D
|
Additional Gas-fired Generation Units Project
- Installation of one additional gas-fired generation unit (CCGT unit No.
2) at the Black Point Power
|
Quarterly EM&A Report No.23
|
https://www.epd.gov.hk/eia/english/register/index8/vep6062021_content.html
|
|
|
|
|
|
|
EP-534/2017/A
|
Site
Formation and Associated Infrastructural Works for Development of
Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery
|
Monthly EM&A Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html
|
|
|
|
|
|
|
EP-534/2017
|
Site
Formation and Associated Infrastructural Works for Development of
Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery
|
Monthly EM&A Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html
|
|
|
|
|
|
|
FEP-01/534/2017
|
Site
Formation and Associated Infrastructural Works for Development of
Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery
|
Monthly EM&A Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html
|
|
|
|
|
|
|
FEP-01/534/2017/A
|
Site
Formation and Associated Infrastructural Works for Development of
Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery
|
Monthly EM&A Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html
|
|
|
|
|
|
|
EP-441/2012/A
|
Enhanced Ash Utilisation and
Water Management Facilities at the Castle Peak Power Station (CPPS)
|
Monthly EM&A Report
(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5432018_content.html
|
|
|
|
|
|
|
- Yuen Long District
|
|
|
|
|
|
|
EP-477/2013/A
|
Development of Lok
Ma Chau Loop
|
Monthly EM&A Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5952021_content.html
|
|
|
|
|
|
|
EP-565/2019
|
Yuen Long Effluent Polishing Plant
|
Monthly EM&A Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5652019_content.html
|
|
|
|
|
|
|
EP-594/2021
|
Installation of the Proposed 132kV Cable
Circuits Connecting with Ho To West Substation and Existing 132kV Fanling
to Mai Po Cable Circuits
|
Monthly Environmental Monitoring & Audit
Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5942021_content.html
|
|
|
|
|
|
|
EP-311/2008/E
|
Proposed Comprehensive Development at Wo
Shang Wai, Yuen Long
|
Monthly EM&A Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5382017_content.html
|
|
|
|
|
|
|
- Kwai Tsing District
|
|
|
|
|
|
|
EP-541/2017/A
|
Flyover from Kwai Tsing Interchange Upramp to
Kwai Chung Road
|
Monthly EM&A Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5842020_content.html
|
|
|
|
|
|
|
- Central & Western District
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link - Hung Hom to
Admiralty Section
|
Monthly EM&A Report (Aug
2022)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
FEP-13/364/2009/H
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report
No.20 (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html
|
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other
roads which are classified as primary/district distributor roads
|
Quarterly EM&A Report
(May 2022 to Jul 2022) (HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other
roads which are classified as primary/district distributor roads
|
Monthly EM&A Report
(Aug 2022)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report
(Aug 2022)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report
(Aug 2022)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
|
- Wan Chai District
|
|
|
|
|
|
|
FEP-03/376/2009
|
DP2-Road P2 and other
roads which are classified as primary/district distributor roads
|
Monthly EM&A Report
No.20 (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1982020_content.html
|
|
|
|
|
|
|
EP-436/2012/F
|
Shatin to Central Link -
Hung Hom to Admiralty Section
|
Monthly EM&A Report
(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link -
Hung Hom to Admiralty Section
|
Monthly EM&A Report
(Aug 2022)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
FEP-13/364/2009/H
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report
No.20 (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html
|
|
|
|
|
|
|
EP-603/2022
|
Removal of 132kV Overhead
Line and Pylons for P-Line
|
Monthly Audit Report No. 4
(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep6032021_content.html
|
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report
(Aug 2022)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report
(Aug 2022)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other
roads which are classified as primary/district distributor roads
|
Quarterly EM&A Report
(May 2022 to Jul 2022) (HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other
roads which are classified as primary/district distributor roads
|
Monthly EM&A Report
(Aug 2022)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
|
- Eastern District
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel
and Associated Works ED/2018/04 - Cha Kwo Ling
|
Monthly EM&A Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel
and Associated Works
|
Monthly EM&A Report (Aug 2022)(Version 1.0)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
|
EP-459/2013
|
Cross Bay Link, Tseung
Kwan O
|
Monthly EM&A Report
(Aug 2022)(Version 2)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
|
|
|
|
|
|
|
EP-505/2015/A
|
Chai Wan Government
Complex and Vehicle Depot
|
Monthly EM&A
Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5702019_content.html
|
|
|
|
|
|
|
EP-505/2015/A
|
Chai Wan Government
Complex and Vehicle Depot
|
Monthly EM&A Report(Jun
2022)(Rev.1)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5702019_content.html
|
|
|
|
|
|
|
EP-505/2015/A
|
Chai Wan Government
Complex and Vehicle Depot
|
Monthly EM&A
Report(Jul 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5702019_content.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link -
Hung Hom to Admiralty Section
|
Monthly EM&A Report
(Aug 2022)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
FEP-13/364/2009/H
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report
No.20 (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html
|
|
|
|
|
|
|
EP-308/2008/B
|
South-East New Territories
Landfill Extension
|
Monthly EM&A Report No.43(Jul
2022)(V1)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
|
FEP-01/308/2008/B
|
South-East New Territories
Landfill Extension
|
Monthly EM&A Report
No.43(Jul 2022)(V1)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
|
EP-308/2008/B
|
South-East New Territories
Landfill Extension
|
Monthly EM&A Report
No.42(Jun 2022)(V1)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
|
FEP-01/308/2008/B
|
South-East New Territories
Landfill Extension
|
Monthly EM&A Report
No.42(Jun 2022)(V1)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
|
EP-308/2008/B
|
South-East New Territories
Landfill Extension
|
Monthly EM&A Report No.44(Aug
2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
|
FEP-01/308/2008/B
|
South-East New Territories
Landfill Extension
|
Monthly EM&A Report
No.44(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
|
EP-308/2008/B
|
South-East New Territories
Landfill Extension
|
Quarterly EM&A Report
(Apr 2022 to Jun 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
|
FEP-01/308/2008/B
|
South-East New Territories
Landfill Extension
|
Quarterly EM&A Report
(Apr 2022 to Jun 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report
(Aug 2022)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report
(Aug 2022)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
|
EP-603/2022
|
Removal of 132kV Overhead
Line and Pylons for P-Line
|
Monthly Audit Report No. 4
(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep6032021_content.html
|
|
|
|
|
|
|
- Southern District
|
|
|
|
|
|
|
EP-487/2014/A
|
Tai Shue Wan Development at Ocean Park
|
Operation Phase Monthly EM&A Report(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link - Hung Hom to
Admiralty Section
|
Monthly EM&A Report (Aug
2022)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel
and Associated Works ED/2018/04 - Cha Kwo Ling
|
Monthly EM&A Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel
and Associated Works
|
Monthly EM&A Report (Aug 2022)(Version 1.0)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
|
EP-603/2022
|
Removal of 132kV Overhead
Line and Pylons for P-Line
|
Monthly Audit Report No. 4
(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep6032021_content.html
|
|
|
|
|
|
|
- Kowloon City District
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Aug 2022)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor
Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Aug 2022)
(ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor
Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Aug 2022)
(ED/2018/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor
Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Aug 2022)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-544/2017
|
Kai Tak Sports Park
|
EM&A Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
|
EP-451/2013
|
Trunk Road T2
|
Monthly EM&A Report (Aug
2022)(ED/2018/04)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
|
|
|
|
|
|
|
EP-563/2018
|
The Development of AFCD Animal Management and
Animal Welfare Building Complex in Kai Tak Development
|
Monthly Audit Report No. 22
|
https://www.epd.gov.hk/eia/english/register/aep/ep5632018_content.html
|
|
|
|
|
|
|
EP-445/2013/A
|
Kai Tak Development
– Roads D3A & D4A
|
Monthly EM&A Report (Aug 2022)
(ED/2018/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
|
|
|
EP-445/2013/B
|
Kai Tak Development
– Roads D3A & D4A
|
Monthly EM&A Report (Aug 2022)(KL/2014/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep6122022_content.html
|
|
|
|
|
|
|
EP-445/2013/B
|
Kai Tak Development
– Roads D3A & D4A
|
Monthly EM&A Report (Aug 2022)
(ED/2018/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep6122022_content.html
|
|
|
|
|
|
|
FEP-03/457/2013/D
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A
Report(Aug 2022)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep2082021hy201408.html
|
|
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak West
(HY/2014/07)
|
Monthly EM&A Report
(Aug 2022)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report
(Aug 2022)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report
(Aug 2022)(HY/2014/20) (HY/2019/13)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report
(Aug 2022)(HY/2018/02)(HY/2019/13)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A
Report(Aug 2022)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201408.html
|
|
|
|
|
|
|
- Kwun Tong District
|
|
|
|
|
|
|
EP-337/2009
|
New
Distributor Roads Serving the Planned Kai Tak Development
|
Monthly
EM&A Report (Aug 2022)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor
Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Aug 2022)
(ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor
Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Aug 2022)
(ED/2018/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor
Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Aug
2022)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-564/2018
|
Lei Yue Mun Waterfront Enhancement Project
|
Monthly EM&A Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5642018_content.html
|
|
|
|
|
|
|
EP-513/2016
|
Development of Anderson
Road Quarry site - Road Improvement Works
|
Monthly EM&A Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html
|
|
|
|
|
|
|
EP-544/2017
|
Kai Tak Sports Park
|
EM&A Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
|
FEP-03/457/2013/D
|
Central Kowloon Route -
Yau Ma Tei East
|
Monthly EM&A
Report(Aug 2022)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep2082021hy201408.html
|
|
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route -
Kai Tak West (HY/2014/07)
|
Monthly EM&A Report
(Aug 2022)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report
(Aug 2022)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report
(Aug 2022)(HY/2014/20) (HY/2019/13)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report
(Aug 2022)(HY/2018/02)(HY/2019/13)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A
Report(Aug 2022)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201408.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel
and Associated Works ED/2018/04 - Cha Kwo Ling
|
Monthly EM&A Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel
and Associated Works
|
Monthly EM&A Report (Aug 2022)(Version 1.0)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
|
- Sham Shui Po District
|
|
|
|
|
|
|
Nil
|
|
|
|
|
|
|
- Wong Tai Sin District
|
|
|
|
|
|
|
EP-337/2009
|
New
Distributor Roads Serving the Planned Kai Tak Development
|
Monthly
EM&A Report (Aug 2022)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor
Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Aug 2022)
(ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor
Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report
(Aug 2022) (ED/2018/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor
Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report
(Aug 2022)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-544/2017
|
Kai Tak Sports Park
|
EM&A Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
|
- Yau Tsim Mong District
|
|
|
|
|
|
|
EP-436/2012/F
|
Shatin to Central Link - Hung Hom to
Admiralty Section
|
Monthly EM&A Report (Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html
|
|
|
|
|
|
|
EP-523/2016
|
Proposed Sewage Pumping Station and Dry
Weather Flow Interceptor at Cherry Street Box Culvert
|
Submission of Monthly EM&A Report No.55
|
https://www.epd.gov.hk/eia/english/register/aep/ep5232016_content.html
|
|
|
|
|
|
|
EP-453/2013/B
|
Underpass Road and Austin
Road Flyover Serving the West Kowloon Cultural District
|
Monthly EM&A Report
(Aug 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link -
Hung Hom to Admiralty Section
|
Monthly EM&A Report
(Aug 2022)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
FEP-03/457/2013/D
|
Central Kowloon Route -
Yau Ma Tei East
|
Monthly EM&A Report
(Aug 2022)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep2082021hy201408.html
|
|
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route -
Kai Tak West (HY/2014/07)
|
Monthly EM&A Report
(Aug 2022)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report
(Aug 2022)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report
(Aug 2022)(HY/2014/20) (HY/2019/13)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report
(Aug 2022)(HY/2018/02)(HY/2019/13)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A
Report(Aug 2022)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201408.html
|
|
|
|
|
|
|
|
|
|
|
|
|
|