Monthly
Update of Documents Uploaded
Documents
Uploaded to the EIAO Website
|
(for the
period between 16 August 2010 to 15 September 2010)
|
|
|
|
|
|
|
Application No. / Permit No.
|
Project Title
|
Document Name
|
Hyperlink
|
|
Application for EIA Study Brief
|
|
ESB-216/2010
|
Drainage Improvement in Northern New Territories – Package C
(Remaining Works)
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/esb216/esb216.pdf
|
|
ESB-215/2010
|
Phase III Redevelopment of The Hong Kong Federation of Youth Groups
Jockey Club Sai Kung Outdoor Training Camp
|
EIA Study Brief
|
http://www.epd.gov.hk/eia/register/study/latest/esb-215.pdf
|
|
Application for Permission to Apply Directly
for Environmental Permit
|
|
DIR-208/2010
|
TETRA Radio Base Station at Kai Kung Leng Lam Tsuen Country Park,
Yuen Long, N.T.
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/dir208/dir208.pdf
|
|
DIR-207/2010
|
Restoration to Yan Tun Kong Study Hall at Ping Shan, Yuen Long, New
Territories
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/dir207/dir207.pdf
|
|
DIR-206/2010
|
Major Restoration to the Residence of Ip Ting-sz, Lin Ma Hang Tsuen,
Sha Tau Kok, N.T.
|
Decision of DEP
|
http://www.epd.gov.hk/eia/register/permission/conditions/dir2062010.htm
|
|
DIR-204/2010
|
Drainage Improvement in Big Wave Bay
|
Decision of DEP
|
http://www.epd.gov.hk/eia/register/permission/conditions/dir2042010.htm
|
|
DIR-203/2010
|
Installation of the Proposed 132kV Cable Circuit Connecting with Ting
Lai Road Substation and Pak Shek Kok Substation
|
Decision of DEP
|
http://www.epd.gov.hk/eia/register/permission/conditions/dir2032010.htm
|
|
DIR-200/2010
|
Dredging Works for Proposed Public Landing Facility at Lei Yue Mun
|
Decision of DEP
|
http://www.epd.gov.hk/eia/register/permission/conditions/dir2002010.htm
|
|
Application for Approval of EIA Report
|
|
Nil
|
|
Application for Environmental Permit
|
|
Nil
|
|
Application for Variation of an Environmental
Permit
|
|
|
|
VEP-322/2010
|
Hill-Top Transposer Station Expansion at Castle Peak and Kowloon Peak
|
Environmental Permit issued (EP-260/2006/A)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep322.htm
|
|
Application for Further Environmental Permit
|
|
FEP-113/2010
|
Hill-top Transposer Station Expansion at Cloudy Hill
|
Environmental Permit issued (FEP-01/260/2006)
|
http://www.epd.gov.hk/eia/register/permit/latest/fep1132010.htm
|
|
FEP-112/2010
|
Construction of a Secondary Boundary Fence at Sha Tau Kok (Remaining
Section)
|
Environmental Permit issued (FEP-04/347/2009/A)
|
http://www.epd.gov.hk/eia/register/permit/latest/fep1122010.htm
|
|
Submission as required by Environmental
Permit Condition - Design / Environmental Submissions
|
|
EP-349/2009
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail
Link
|
Revised Contamination Assessment Plan for Mei Lai Road Works Area
(Revision B)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3492009_content.html
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building, Radar
Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Remediation Report (Rev.1)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
EP-249/2006/A
|
Repositioning and Long Term Operation Plan of Ocean Park
|
Glare Impact Assessment Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep2232006_content.html
|
|
Submission as required by Environmental
Permit Condition - EM&A Reports
|
|
|
Island District
|
Central & Western District
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
- Island District
|
|
EP-01/059/2000/B
|
The Theme Park at Penny's Bay, Lantau
|
Monthly Environmental Monitoring and Audit Report for 57th Operating
Month (12 May 2010 to 11 Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1982005_content.html
|
|
EP-01/059/2000/B
|
The Theme Park at Penny's Bay, Lantau
|
Monthly Environmental Monitoring and Audit Report for 58th Operating
Month (12 Jun 2010 to 11 Jul 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1982005_content.html
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at Lamma Extension
|
Monthly Environmental Monitoring and Audit Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines (GT5 & GT7) into a
Combined Cycle Unit
|
Monthly Environmental Monitoring And Audit Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
EP-170/2003/B
|
Improvement to Tung Chung Road between Lung Tseng Tau and Cheung Sha
|
Monthly Progress Report (May to Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2152006_content.html
|
|
EP-170/2003/B
|
Improvement to Tung Chung Road between Lung Tseng Tau and Cheung Sha
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2152006_content.html
|
|
EP-229/2005
|
Development of SkyCity Golf Course
|
EM&A Quarterly Compliance Report (May 2010 to Jul 2010)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2292005_content.html
|
|
EP-237/2005/B
|
Drainage Improvements in Southern Lantau
|
Monthly Environmental Monitoring & Audit Report (Mar 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
EP-281/2007/A
|
Outlying Islands Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage
Collection, Treatment and Disposal Facilities
|
Monthly Impact Monitoring Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
EP-281/2007/A
|
Outlying Islands Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage
Collection, Treatment and Disposal Facilities
|
Monthly Impact Monitoring Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
FEP- 01/097/2001/C
|
Water Recreation Centre at Penny's Bay (part & remaining part)
|
Monthly Environmental Monitoring and Audit Report (No. 59)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
- North District
|
|
EP-277/2007/A
|
Drainage Improvements in Northern New Territories - Package C
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
EP-277/2007/A
|
Drainage Improvements in Northern New Territories - Package C
|
Monthly EM&A Report (Jun 2010) Rev.3
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
EP-324/2008
|
Widening of Tolo Highway/Fanling Highway between Island House
Interchange and Fanling
|
Monthly EM&A Report (Jun 2010) (Stage 1)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3242008_content.html
|
|
EP-329/2009
|
Provision of Cremators at Wo Hop Shek Crematorium
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
EP-329/2009
|
Provision of Cremators at Wo Hop Shek Crematorium
|
Monthly EM&A Report (May 2010)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
EP-347/2009/A
|
Construction of a Secondary Boundary Fence and new sections of
Primary Boundary Fence and Boundary Patrol Road
|
Monthly EM&A Report ( May to Jun 2010 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html
|
|
FEP-01/347/2009
|
Construction of a Secondary Boundary Fence and new sections of
Primary Boundary Fence and Boundary Patrol Road - Contract No. SSW317
"Construction of a Secondary Boundary Fence from Mai Po to Lok Ma Chau
Control Point"
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0992010_content.html
|
|
FEP-02/347/2009
|
Construction of a Secondary Boundary Fence and new sections of
Primary Boundary Fence and Boundary Patrol Road (Section 2 Lok Ma Chau
Control Point to Ng Tung River)
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1002010_content.html
|
|
FEP-03/347/2009
|
Construction of a Secondary Boundary Fence at Sha Tau Kok
|
Monthly EM&A Report ( May to Jun 2010 )
|
http://www.epd.gov.hk/eia/english/register/index7/fep1042010_content.html
|
|
- Sai Kung District
|
|
EP-134/2002/H
|
Fill Bank at Tseung Kwan O Area 137
|
Quarterly EM&A Report (Contract No.: CV/2004/13) (Aug 2009 to Oct
2009)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2752008.html
|
|
EP-134/2002/H
|
Fill Bank at Tseung Kwan O Area 137
|
Quarterly EM&A Report (Contract No.: CV/2009/02) (Dec 2009 to Feb
2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2752008.html
|
|
EP-134/2002/H
|
Fill Bank at Tseung Kwan O Area 137
|
Monthly EM&A Report (Contract No.: CV/2009/02) (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2752008.html
|
|
- Sha Tin District
|
|
EP-135/2002/H
|
Sha Tin New Town - Stage II Trunk Road T3 and Associated Roadworks
|
Monthly Environmental Monitoring and Audit Report (May 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2582008_content.html
|
|
EP-332/2009
|
Road D1(N), Road D1(W) and Box Culvert of Whitehead & Lok Wo Sha
Phase One Project
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3322009_content.html
|
|
EP-332/2009
|
Road D1(N), Road D1(W) and Box Culvert of Whitehead & Lok Wo Sha
Phase One Project
|
Quarterly EM&A Report (Oct to Dec 2009)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3322009_content.html
|
|
EP-332/2009
|
Road D1(N), Road D1(W) and Box Culvert of Whitehead & Lok Wo Sha
Phase One Project
|
Quarterly EM&A Report (Jan to Mar 2010)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3322009_content.html
|
|
- Tai Po District
|
|
EP-202/2004
|
Tai Po Sewage Treatment Works Stage V
|
Monthly Environmental Monitoring and Audit Report (Jun 2010)
(Contract No.: DE/2004/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2022004_content.html
|
|
EP-202/2004
|
Tai Po Sewage Treatment Works Stage V
|
Monthly Environmental Monitoring and Audit Report (Jun 2010)
(Contract No.: DC/2004/10)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2022004_content.html
|
|
EP-223/2005/A
|
Drainage Improvement Works in Upper Tai Po River
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
EP-324/2008
|
Widening of Tolo Highway/Fanling Highway between Island House
Interchange and Fanling
|
Monthly EM&A Report (Jun 2010) (Stage 1)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3242008_content.html
|
|
- Tsuen Wan District
|
|
EP-349/2009
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail
Link
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3492009_content.html
|
|
EP-322/2008/B
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Ver 1.1) (Jun 2010) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3032009_content.html
|
|
EP-322/2008/B
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Mar 2010 to May 2010)
(DC/2007/23,DC/2009/05,DE/2009/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3032009_content.html
|
|
EP-322/2008/B
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jun 2010) (DC/2007/23,DC/2009/05,DE/2009/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3032009_content.html
|
|
EP-322/2008/C
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report No.6 (Jun 2010) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3122010_content.html
|
|
EP-322/2008/C
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report No.2 (Apr 2009 to Jun 2010) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3122010_content.html
|
|
- Tuen Mun District
|
|
EP-210/2005/A
|
Expansion and Extension of Fill Bank at Tuen Mun Area 38
|
Monthly Environmental Monitoring and Audit Report (CV/2009/02) (Jun
2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2772008.html
|
|
EP-226/2005/A
|
Development of an EcoPark in Tuen Mun Area 38
|
Environmental Monitoring and Audit Monthly EM&A Report (May 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2212006_content.html
|
|
EP-226/2005/A
|
Development of an EcoPark in Tuen Mun Area 38
|
Environmental Monitoring and Audit Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2212006_content.html
|
|
EP-251/2006
|
Emissions Control Project at Castle Peak Power Station "B"
Units
|
Environmental Monitoring and Audit Monthly Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2512006_content.html
|
|
EP-262/2007/B
|
Permanent Aviation Fuel Facility for Hong Kong International Airport
|
Monthly Environmental Monitoring and Audit Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2512008_content.html
|
|
EP-262/2007/B
|
Permanent Aviation Fuel Facility for Hong Kong International Airport
|
Quarterly Environmental Monitoring and Audit Report (Apr - Jun 2010)
|
|
|
EP-262/2007/B
|
Permanent Aviation Fuel Facility for Hong Kong International Airport
|
3rd Annual EM&A Report (Jul 2009 - Jun 2010)
|
|
|
EP-296/2007
|
Proposed Joint User Complex and Wholesale Fish Market at Area 44 Tuen
Mun
|
Monthly Environmental Monitoring & Audit Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2962007_content.html
|
|
EP-342/2009/A
|
Traffic Improvements to Tuen Mun Road Town Centre Section
|
Baseline Monitoring Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3012010_content.html
|
|
- Yuen Long District
|
|
EP-220/2005
|
Yuen Long and Kam Tin Sewerage and Sewage Disposal Kam Tin Trunk
Sewerage Phase I and Au Tau Trunk Sewers
|
Monthly EM&A Report (Jun 2010) (Contract no.DC/2005/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2202005_content.html
|
|
EP-263/2007
|
Yuen Long, Kam Tin, Ngau Tam Mei & Tin Shui Wai Drainage
Improvement Stage 1, Phase 2B - Kam Tin Secondary Drainage Channel KT13
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2632007_content.html
|
|
EP-290/2007
|
Operation of Shenzhen Section of Shenzhen Bay Bridge
|
Monitoring of Bridge Lighting Scheme and Bird Collisions Quarterly
Report No.12 (Apr to Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2902007_content.html
|
|
EP-327/2009
|
Expansion of Ha Tsuen Sewage Pumping Station
|
Baseline Monitoring Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep3272009_content.html
|
|
EP-343/2009
|
Hang Hau Tsuen Channel at Lau Fau Shan
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3432009_content.html
|
|
EP-343/2009
|
Hang Hau Tsuen Channel at Lau Fau Shan
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3432009_content.html
|
|
EP-347/2009/A
|
Construction of a Secondary Boundary Fence and new sections of
Primary Boundary Fence and Boundary Patrol Road
|
Monthly EM&A Report (May to Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html
|
|
FEP-01/347/2009
|
Construction of a Secondary Boundary Fence and new sections of Primary
Boundary Fence and Boundary Patrol Road - Contract No. SSW317
"Construction of a Secondary Boundary Fence from Mai Po to Lok Ma Chau
Control Point"
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0992010_content.html
|
|
FEP-02/347/2009
|
Construction of a Secondary Boundary Fence and new sections of Primary
Boundary Fence and Boundary Patrol Road (Section 2 Lok Ma Chau Control Point
to Ng Tung River)
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1002010_content.html
|
|
FEP-03/347/2009
|
Construction of a Secondary Boundary Fence at Sha Tau Kok
|
Monthly EM&A Report ( May to Jun 2010 )
|
http://www.epd.gov.hk/eia/english/register/index7/fep1042010_content.html
|
|
EP-349/2009
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail
Link
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3492009_content.html
|
|
- Kwai Tsing District
|
|
EP-121/2002/A
|
Demolition of Kwai Chung Incineration Plant
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2842009_content.html
|
|
EP-121/2002/A
|
Demolition of Kwai Chung Incineration Plant
|
Monthly EM&A Report (Apr 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2842009_content.html
|
|
EP-349/2009
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail
Link
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3492009_content.html
|
|
EP-322/2008/B
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Ver 1.1) (Jun 2010) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3032009_content.html
|
|
EP-322/2008/B
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Mar 2010 to May 2010)
(DC/2007/23,DC/2009/05,DE/2009/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3032009_content.html
|
|
EP-322/2008/B
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jun 2010) (DC/2007/23,DC/2009/05,DE/2009/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3032009_content.html
|
|
EP-322/2008/C
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report No.6 (Jun 2010) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3122010_content.html
|
|
EP-322/2008/C
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report No.2 (Apr 2009 to Jun 2010) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3122010_content.html
|
|
- Central & Western District
|
|
EP-273/2007
|
Laying of Western Cross Harbour Main and Associated Land Mains from
West Kowloon to Sai Ying Pun
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html
|
|
EP-313/2008/C
|
West Island Line
|
Baseline Monitoring Report (Part 8) for Project Works Area A
|
http://www.epd.gov.hk/eia/english/register/index8/vep2982009.html
|
|
EP-313/2008/C
|
West Island Line
|
Baseline Monitoring Report (Part 6 & 7) for Project Works Area
(C&D)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2982009.html
|
|
EP-313/2008/C
|
West Island Line
|
Environmental Monitoring & Audit Report (Jul 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2982009.html
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island - Hong Kong West
Drainage Tunnel
|
Monthly EM&A Report (DC/2007/10) (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island - Hong Kong West
Drainage Tunnel
|
EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island - Hong Kong West
Drainage Tunnel
|
Quarterly EM&A Report (Apr to Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and Central - Wan Chai Bypass - North
Point Reclamation
|
Quarterly EM&A Report (Mar to May 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and Central - Wan Chai Bypass - North
Point Reclamation
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong
Kong Convention and Exhibition Centre
|
Quarterly EM&A Report (Mar to May 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai
East
|
Quarterly EM&A Report (Mar to May 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai
East
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
EP-322/2008/B
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Ver 1.1) (Jun 2010) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3032009_content.html
|
|
EP-322/2008/B
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Mar 2010 to May 2010)
(DC/2007/23,DC/2009/05,DE/2009/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3032009_content.html
|
|
EP-322/2008/B
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jun 2010) (DC/2007/23,DC/2009/05,DE/2009/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3032009_content.html
|
|
EP-322/2008/C
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report No.6 (Jun 2010) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3122010_content.html
|
|
EP-322/2008/C
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report No.2 (Apr 2009 to Jun 2010) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3122010_content.html
|
|
- Wan Chai District
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island - Hong Kong West
Drainage Tunnel
|
Monthly EM&A Report (DC/2007/10) (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island - Hong Kong West
Drainage Tunnel
|
EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island - Hong Kong West
Drainage Tunnel
|
Quarterly EM&A Report (Apr to Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and Central - Wan Chai Bypass - North
Point Reclamation
|
Quarterly EM&A Report (Mar to May 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and Central - Wan Chai Bypass - North
Point Reclamation
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong
Kong Convention and Exhibition Centre
|
Quarterly EM&A Report (Mar to May 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong
Kong Convention and Exhibition Centre
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai
East
|
Quarterly EM&A Report (Mar to May 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai
East
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
EP-322/2008/B
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Ver 1.1) (Jun 2010) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3032009_content.html
|
|
EP-322/2008/B
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Mar 2010 to May 2010)
(DC/2007/23,DC/2009/05,DE/2009/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3032009_content.html
|
|
EP-322/2008/B
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jun 2010) (DC/2007/23,DC/2009/05,DE/2009/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3032009_content.html
|
|
EP-322/2008/C
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report No.6 (Jun 2010) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3122010_content.html
|
|
EP-322/2008/C
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report No.2 (Apr 2009 to Jun 2010) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3122010_content.html
|
|
- Eastern District
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and Central - Wan Chai Bypass - North
Point Reclamation
|
Quarterly EM&A Report (Mar to May 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and Central - Wan Chai Bypass - North
Point Reclamation
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong
Kong Convention and Exhibition Centre
|
Quarterly EM&A Report (Mar to May 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong
Kong Convention and Exhibition Centre
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai
East
|
Quarterly EM&A Report (Mar to May 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai
East
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
EP-322/2008/B
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Ver 1.1) (Jun 2010) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3032009_content.html
|
|
EP-322/2008/B
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Mar 2010 to May 2010)
(DC/2007/23,DC/2009/05,DE/2009/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3032009_content.html
|
|
EP-322/2008/B
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jun 2010) (DC/2007/23,DC/2009/05,DE/2009/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3032009_content.html
|
|
EP-322/2008/C
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report No.6 (Jun 2010) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3122010_content.html
|
|
EP-322/2008/C
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report No.2 (Apr 2009 to Jun 2010) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3122010_content.html
|
|
- Southern District
|
|
EP-249/2006/A
|
Repositioning and Long Term Operation Plan of Ocean Park
|
Quarterly Environmental Monitoring and Audit Report (from Apr to Jun
2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2232006_content.html
|
|
EP-249/2006/A
|
Repositioning and Long Term Operation Plan of Ocean Park
|
Monthly Environmental Monitoring and Audit Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2232006_content.html
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island - Hong Kong West
Drainage Tunnel
|
Monthly EM&A Report (DC/2007/10) (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island - Hong Kong West
Drainage Tunnel
|
EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island - Hong Kong West
Drainage Tunnel
|
Quarterly EM&A Report (Apr to Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html
|
|
EP-322/2008/B
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Ver 1.1) (Jun 2010) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3032009_content.html
|
|
EP-322/2008/B
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Mar 2010 to May 2010)
(DC/2007/23,DC/2009/05,DE/2009/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3032009_content.html
|
|
EP-322/2008/B
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jun 2010) (DC/2007/23,DC/2009/05,DE/2009/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3032009_content.html
|
|
EP-322/2008/C
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report No.6 (Jun 2010) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3122010_content.html
|
|
EP-322/2008/C
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report No.2 (Apr 2009 to Jun 2010) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3122010_content.html
|
|
- Kowloon City District
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal at Kai Tak
|
Final Post-translocation Coral Monitoring Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
- Kwun Tong District
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal at Kai Tak
|
Final Post-translocation Coral Monitoring Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
- Sham Shui Po District
|
|
EP-253/2006
|
Mass Transit Railway - Lai Chi Kok Station Cheung Lai Street
Pedestrian Subway and Entrances Works
|
Monthly Environmental Monitoring And Audit Report (16 May 2010 to 15
Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2532006_content.html
|
|
EP-349/2009
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail
Link
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3492009_content.html
|
|
EP-322/2008/B
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Ver 1.1) (Jun 2010) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3032009_content.html
|
|
EP-322/2008/B
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Mar 2010 to May 2010)
(DC/2007/23,DC/2009/05,DE/2009/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3032009_content.html
|
|
EP-322/2008/B
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jun 2010) (DC/2007/23,DC/2009/05,DE/2009/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3032009_content.html
|
|
EP-322/2008/C
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report No.6 (Jun 2010) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3122010_content.html
|
|
EP-322/2008/C
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report No.2 (Apr 2009 to Jun 2010) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3122010_content.html
|
|
- Wong Tai Sin District
|
|
Nil
|
|
- Yau Tsim Mong District
|
|
EP-273/2007
|
Laying of Western Cross Harbour Main and Associated Land Mains from
West Kowloon to Sai Ying Pun
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html
|
|
EP-349/2009
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail
Link
|
Monthly EM&A Report (Jun 2010)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3492009_content.html
|
|
|
|
|
|
|
|