Monthly Update of Documents Uploaded

 

       Documents Uploaded to the EIAO Website

       (for the period between 16 Aug 2013 to 15 Sep 2013)

 

 

Application No. / Permit No.

Project Title

Document Name

Hyperlink

 

 

Application for EIA Study Brief

 

 

ESB-263/2013

Sewerage Works for Ha Fa Shan, Kiu Tau Village, Wang Lung and Ma Tong

EIA Study Brief

http://www.epd.gov.hk/eia/register/study/latest/esb-263.pdf

 

 

Application for Permission to Apply Directly for Environmental Permit

 

 

DIR-231/2013

Improvement Works to Cable Landing Point at Tai Lei Island, Peng Chau

Project Profile

http://www.epd.gov.hk/eia/register/profile/latest/dir231/dir231.pdf

 

 

Application for Approval of EIA Report

 

 

EIA-217/2013

Proposed Road Improvement Works in West Kowloon Reclamation Development Phase 1

EIA Report

http://www.epd.gov.hk/eia/register/report/eiareport/eia_2172013/Front%20Page.htm

 

 

Application for Environmental Permit

 

 

AEP-458/2013

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Environmental Permit issued (EP-458/2013)

http://www.epd.gov.hk/eia/register/permit/latest/ep4582013.htm

 

 

AEP-459/2013

Cross Bay Link, Tseung Kwan O

Environmental Permit issued (EP-459/2013)

http://www.epd.gov.hk/eia/register/permit/latest/ep4592013.htm

 

 

AEP-461/2013

Replacement of the Existing 11KV Submarine Cable Circuit Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O

Environmental Permit issued (EP-461/2013)

http://www.epd.gov.hk/eia/register/permit/latest/ep4612013.htm

 

 

Application for Variation of an Environmental Permit

 

 

VEP-411/2013

Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road

Environmental Permit issued (EP-352/2009/C  )

http://www.epd.gov.hk/eia/register/permit/latest/vep4112013.htm

 

 

Application for Further Environmental Permit

 

 

NIL

 

 

Submission as required by Environmental Permit Condition - Design / Environmental Submissions

 

 

EP-438/2012/C

Shatin to Central Link - Tai Wai to Hung Hom Section

Construction Noise Mitigation Measures Plan

http://www.epd.gov.hk/eia/english/register/index8/vep4012013_content.html

 

 

EP-438/2012/C

Shatin to Central Link - Tai Wai to Hung Hom Section

Construction Noise Monitoring Plan

http://www.epd.gov.hk/eia/english/register/index8/vep4012013_content.html

 

 

EP-438/2012/C

Shatin to Central Link - Tai Wai to Hung Hom Section

Sediment Management Plan (Jul 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep4012013_content.html

 

 

EP-317/2009

Tsim Sha Tsui Station Northern Subway

Baseline Monitoring Report

http://www.epd.gov.hk/eia/english/register/aep/ep3172009_content.html

 

 

EP-399/2010/B

Kwun Tong Line Extension

Alternative Monitoring Locations

http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html

 

 

Submission as required by Environmental Permit Condition - EM&A Reports

 

 

 

Island District

Central & Western District

 

 

 

 

North District

Wan Chai District

 

 

 

 

Sai Kung District

Eastern District

 

 

 

 

Sha Tin District

Southern District

 

 

 

 

Tai Po District

Kowloon City District

 

 

 

 

Tsuen Wan District

Kwun Tong District

 

 

 

 

Tuen Mun District

Sham Shui Po District

 

 

 

 

Yuen Long District

Wong Tai Sin District

 

 

 

 

Kwai Tsing District

Yau Tsim Mong District

 

 

 

- Island District

 

 

EP- 01/097/2001/C

Water Recreation Centre at Penny's Bay (part & remaining part)

Monthly Environmental Monitoring and Audit Report (No. 94)

http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html

 

 

EP- 01/097/2001/C

Water Recreation Centre at Penny's Bay (part & remaining part)

Monthly Environmental Monitoring and Audit Report (No. 95)

http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html

 

 

EP-01/059/2000/C

The Theme Park at Penny's Bay, Lantau

93th Monthly EM&A Report (12 May 2013 to 11 Jun 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html

 

 

EP-01/059/2000/C

The Theme Park at Penny's Bay, Lantau

94th Monthly EM&A Report (12 Jun 2013 to 11 Jul 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html

 

 

EP-282/2007

Outlying Islands Sewerage Stage 1 Phase 1 Part 2 – Yung Shue Wan Sewerage, Sewage Treatment Works and Outfall

Monthly EM&A Report (May 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html

 

 

EP-281/2007/A

Outlying Islands Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage Collection, Treatment and Disposal Facilities

Monthly EM&A Report (Jun 2013) (DC/2009/13)

http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html

 

 

EP-083/2000

Conversion of Two Existing Gas Turbines (GT5 & GT7) into a Combined Cycle Unit

Monthly Environmental Monitoring And Audit Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html

 

 

EP-071/2000/C

1,800MW Gas-Fired Power Station at Lamma Extension

Monthly Environmental Monitoring and Audit Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html

 

 

EP-349/2009/J

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep4072013_content.html

 

 

- North District

 

 

EP-430/2011

Regulation of Shenzhen River Stage IV

Monthly EM&A Report (May 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html

 

 

EP-324/2008

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Jun 2013) (Stage 1)

http://www.epd.gov.hk/eia/english/register/index8/ep3242008_content.html

 

 

EP-329/2009

Provision of Cremators at Wo Hop Shek Crematorium

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html

 

 

EP-277/2007/A 

Drainage Improvements in Northern New Territories - Package C

Monthly EM&A Report May 2013

http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html

 

 

EP-277/2007/A 

Drainage Improvements in Northern New Territories - Package C

Quarterly EM&A Report (Dec 2012 to Feb 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html

 

 

EP-277/2007/A 

Drainage Improvements in Northern New Territories - Package C

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html

 

 

- Sai Kung District

 

 

FEP-02/428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

9th Monthly EM&A Report

http://www.epd.gov.hk/eia/english/register/index7/fep1422012_content.html

 

 

EP-02/410/2010/A

Phase III Redevelopment of The Hong Kong Federation of Youth Groups Jockey Club Sai Kung Outdoor Training Camp

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3972013_content.html

 

 

EP-399/2010/B 

Kwun Tong Line Extension

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html

 

 

EP-134/2002/J

Fill Bank at Tseung Kwan O Area 137

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3382011_content.html

 

 

EP-134/2002/J

Fill Bank at Tseung Kwan O Area 137

Monthly EM&A Report (Sep 2012)

http://www.epd.gov.hk/eia/english/register/index8/vep3382011_content.html

 

 

- Sha Tin District

 

 

NIL

 

 

- Tai Po District

 

 

EP-324/2008

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Jun 2013) (Stage 1)

http://www.epd.gov.hk/eia/english/register/index8/ep3242008_content.html

 

 

EP-303/2008

Drainage Improvement in Sha Tin and Tai Po

Monthly EM&A Report (May 2013) (DC/2010/02)

http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html

 

 

EP-303/2008

Drainage Improvement in Sha Tin and Tai Po

Monthly EM&A Report (May 2013) (DC/2009/22)

http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html

 

 

EP-265/2007

Tai Po Sewage Treatment Works Stage 5 Phase 2A-Disinfection and Stage 5 Phase 2B

Monthly Environmental and Audit Report (Jun 2013) (DE/2009/09)

http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html

 

 

EP-265/2007

Tai Po Sewage Treatment Works Stage 5 Phase 2A-Disinfection and Stage 5 Phase 2B

Monthly Environmental and Audit Report (Jun 2013) (DC/2009/09)

http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html

 

 

EP-265/2007

Tai Po Sewage Treatment Works Stage 5 Phase 2A-Disinfection and Stage 5 Phase 2B

Monthly Environmental and Audit Report (May 2013) (DC/2009/09)

http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html

 

 

EP-265/2007

Tai Po Sewage Treatment Works Stage 5 Phase 2A-Disinfection and Stage 5 Phase 2B

Quarterly Environmental and Audit Report (Apr to Jun 2013) (DC/2009/09)

http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html

 

 

EP-223/2005/A 

Drainage Improvement Works in Upper Tai Po River

Monthly EM&A Report (May 2013) (DC/2007/06)

http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html

 

 

- Tsuen Wan District

 

 

EP-275/2007

Drainage Improvement in Tsuen Wan and Kwai Chung - Tsuen Wan Drainage Tunnel

Monthly EM&A Report (May 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep2752007_content.html

 

 

EP-275/2007

Drainage Improvement in Tsuen Wan and Kwai Chung - Tsuen Wan Drainage Tunnel

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep2752007_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jul 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2009/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

- Tuen Mun District

 

 

FEP-01/334/2009/A

Sludge Treatment Facilities

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3452011_content.html

 

 

EP-226/2005

Development of an EcoPark in Tuen Mun Area 38

Annual EM&A Report (Jan 2012 to Dec 2012)

http://www.epd.gov.hk/eia/english/register/aep/ep2262005_content.html

 

 

EP-381/2009

Tuen Mun Area 54 Sewage Pumping Station

Monthly EM&A Report (May 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html

 

 

EP-381/2009

Tuen Mun Area 54 Sewage Pumping Station

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html

 

 

FEP-01/334/2009/C 

Sludge Treatment Facilities

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3872012_content.html

 

 

EP-342/2009/C

Traffic Improvements to Tuen Mun Road Town Centre Section

Quarterly EM&A Report (Feb 2013 to Apr 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html

 

 

EP-342/2009/C

Traffic Improvements to Tuen Mun Road Town Centre Section

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html

 

 

EP-210/2005/B

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html

 

 

EP-321/2008/A

Upgrading of Pillar Point Sewage Treatment Works

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3982013_content.html

 

 

EP-331/2009

 Widening of Tsing Lun Road, Tuen Mun

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html

 

 

- Yuen Long District

 

 

FEP-24/004/1998/I

West Rail, Phase 1

Monthly Noise Monitoring Report (May 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1382012_content.html

 

 

EP-411/2011

Improvement to Pok Oi Interchange

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html

 

 

EP-411/2011

Improvement to Pok Oi Interchange

Quarterly EM&A Report (Mar to May 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html

 

 

FEP-05/347/2009/A

Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road (Section 3)

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1392012_content.html

 

 

EP-349/2009/J

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep4072013_content.html

 

 

- Kwai Tsing District

 

 

EP-275/2007

Drainage Improvement in Tsuen Wan and Kwai Chung - Tsuen Wan Drainage Tunnel

Monthly EM&A Report (May 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep2752007_content.html

 

 

EP-275/2007

Drainage Improvement in Tsuen Wan and Kwai Chung - Tsuen Wan Drainage Tunnel

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep2752007_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jul 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2009/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

- Central & Western District

 

 

EP-447/2013

Decommissioning of the Magazine Site at Victoria Road for West Island Line

 

Monthly EM&A Report No.1

http://www.epd.gov.hk/eia/english/register/aep/ep4472013_content.html

 

 

EP-364/2009/B

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html

 

 

EP-408/2011/B

Central Police Station Conservation and Revitalisation Project

Monthly EM&A Report (No.20

http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html

 

 

EP-313/2008/G

West Island Line

Monthly EM&A Report No.47

http://www.epd.gov.hk/eia/english/register/index8/vep4042013_content.html

 

 

FEP-01/272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Monthly EM&A Report (May 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

 

EP-356/2009

 Wan Chai Development Phase II and Central-Wan Chai Bypass

 

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

FEP-02/356/2009

 Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

FEP-05/356/2009

Wan Chai Development Phase II - Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) - Marine Work

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html

 

 

FEP-06/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jul 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2009/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-407/2010/C

South Island Line (East)

Monthly EM&A Report (Jul 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3992013_content.html

 

 

EP-286/2007/B

The Expansion of Heliport Facilities at Macau Ferry Terminal

Monthly EM&A Report No.25

http://www.epd.gov.hk/eia/english/register/index8/vep2802008_content.html

 

 

EP-364/2009/A

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (May 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html

 

 

EP-364/2009/A

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html

 

 

EP-122/2002/D

Central Reclamation Phase III

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html

 

 

- Wan Chai District

 

 

EP-364/2009/B

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html

 

 

FEP-01/272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Monthly EM&A Report (May 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

 

EP-416/2011

ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html

 

 

EP-416/2011

ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html

 

 

EP-356/2009

 Wan Chai Development Phase II and Central-Wan Chai Bypass

 

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

FEP-02/356/2009

 Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

FEP-05/356/2009

Wan Chai Development Phase II - Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) - Marine Work

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html

 

 

FEP-06/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html

 

 

EP-356/2009

 Wan Chai Development Phase II and Central-Wan Chai Bypass

 

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

FEP-02/356/2009

 Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

FEP-05/356/2009

Wan Chai Development Phase II - Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) - Marine Work

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html

 

 

FEP-06/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jul 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2009/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-364/2009/A

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (May 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html

 

 

EP-364/2009/A

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html

 

 

EP-122/2002/D

Central Reclamation Phase III

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html

 

 

- Eastern District

 

 

EP-364/2009/B

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html

 

 

FEP-01/272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Monthly EM&A Report (May 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

 

FEP-01/335/2009

Phased Reprovisioning of Cape Collinson Crematorium

Monthly EM&A Report (May 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html

 

 

EP-442/2012

EMSD Hong Kong Workshop at Sheung On Street, Chai Wan

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep4422012_content.html

 

 

EP-416/2011

ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html

 

 

EP-416/2011

ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html

 

 

EP-356/2009

 Wan Chai Development Phase II and Central-Wan Chai Bypass

 

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

FEP-02/356/2009

 Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

FEP-05/356/2009

Wan Chai Development Phase II - Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) - Marine Work

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html

 

 

FEP-06/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html

 

 

EP-401/2010

 Installation of Submarine Gas Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development

13th Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html

 

 

EP-356/2009

 Wan Chai Development Phase II and Central-Wan Chai Bypass

 

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

FEP-02/356/2009

 Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

FEP-05/356/2009

Wan Chai Development Phase II - Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) - Marine Work

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html

 

 

FEP-06/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jul 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2009/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-364/2009/A

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (May 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html

 

 

 

EP-364/2009/A

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html

 

 

EP-122/2002/D

Central Reclamation Phase III

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html

 

 

FEP-01/335/2009

Phased Reprovisioning of Cape Collinson Crematorium

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html

 

 

- Southern District

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jul 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2009/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

- Kowloon City District

 

 

EP-437/2012

Shatin to Central Link - Mong Kok East to Hung Hom Section

Monthly EM&A Report No.10 (Jun 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html

 

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report(May 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-344/2009

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report(May 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

 

EP-399/2010/B 

Kwun Tong Line Extension

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html

 

 

EP-438/2012/C

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report No.8

http://www.epd.gov.hk/eia/english/register/index8/vep4012013_content.html

 

 

EP-438/2012/C

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report No.10

http://www.epd.gov.hk/eia/english/register/index8/vep4012013_content.html

 

 

- Kwun Tong District

 

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report(May 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-344/2009

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report(May 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

 

EP-140/2002

Planning and Engineering Feasibility Study for Development at Anderson Road

Monthly EM&A Report (May 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html

 

 

EP-140/2002

Planning and Engineering Feasibility Study for Development at Anderson Road

Quarterly EM&A Report (Mar to May 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html

 

 

- Sham Shui Po District

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jul 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2009/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jun 2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

- Wong Tai Sin District

 

 

EP-438/2012/C

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report No.8

http://www.epd.gov.hk/eia/english/register/index8/vep4012013_content.html

 

 

EP-438/2012/C

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report No.10

http://www.epd.gov.hk/eia/english/register/index8/vep4012013_content.html

 

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Quarterly EM&A Report (Mar 2013 to May 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report(May 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-344/2009

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report(May 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

 

- Yau Tsim Mong District

 

 

EP-414/2011

Reprovision of Bridges D1 and T in West Kowloon

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html

 

 

EP-437/2012

Shatin to Central Link - Mong Kok East to Hung Hom Section

Monthly EM&A Report No.10 (Jun 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html

 

 

EP-317/2009

Tsim Sha Tsui Station Northern Subway

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3172009_content.html

 

 

EP-366/2009/A

Road Works at West Kowloon

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html

 

 

EP-349/2009/J

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep4072013_content.html

 

 

EP-399/2010/B 

Kwun Tong Line Extension

Monthly EM&A Report (Jun 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html