Monthly Update of Documents Uploaded
Documents Uploaded to the EIAO
Website
|
|
(for the period between 16 August 2020
to 15
September 2020)
|
|
|
|
|
|
Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
|
|
|
|
Application
for EIA Study Brief
|
|
|
|
|
|
ESB-333/2020
|
Ngau Tam
Mei Water Treatment Works Extension
|
Study Brief
|
https://www.epd.gov.hk/eia/register/study/latest/esb-333.pdf
|
|
|
|
|
|
ESB-334/2020
|
Drainage
Improvement Works in Mui
Wo
|
Project Profile
|
https://www.epd.gov.hk/eia/register/profile/latest/esb334/esb334.pdf
|
|
|
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
|
|
|
DIR-276/2020
|
Airport City Link
|
Decisions on Applications for (DIR)
|
https://www.epd.gov.hk/eia/register/permission/conditions/dir2762020.pdf
|
|
|
|
|
|
DIR-277/2020
|
Agreement no. CE47/2014(GE) - Landslip
Prevention and Mitigation Programme
near Bride’s Pool Road, Tai Po – 3SE-D/SA2
|
Decisions on Applications for (DIR)
|
https://www.epd.gov.hk/eia/register/permission/conditions/dir2772020.pdf
|
|
|
|
|
|
DIR-278/2020
|
Drainage Improvement Works at Shek Kiu Tau
|
Project Profile
|
https://www.epd.gov.hk/eia/register/profile/latest/dir278/dir278.pdf
|
|
|
|
|
|
Application
for Approval of EIA Report
|
|
|
|
|
|
Nil
|
|
|
|
|
|
Application
for Environmental Permit
|
|
|
|
|
|
AEP-577/2020
|
Penfold Park
Enhancement Project
|
Environmental Permit issued (EP-577/2020)
|
https://www.epd.gov.hk/eia/register/permit/latest/ep5772020.htm
|
|
|
|
|
|
Application
for Variation of an Environmental Permit
|
|
|
|
|
|
Nil
|
|
|
|
|
|
Application
for Further Environmental Permit
|
|
|
|
|
|
FEP-201/2020
|
Additional Gas-fired Generation Units Project -
Installation of one additional gas-fired generation unit (CCGT unit No. 2)
at the Black Point Power Station
|
Environmental Permit issued (FEP-03/507/2016/C)
|
https://www.epd.gov.hk/eia/register/permit/latest/fep2012020.htm
|
|
|
|
|
|
FEP-202/2020
|
Queen’s Hill Sewage Pumping Station
|
Environmental Permit issued (FEP-01/506/2016)
|
https://www.epd.gov.hk/eia/register/permit/latest/fep2022020.htm
|
|
|
|
|
|
Submission as required by Environmental
Permit Condition - Design / Environmental Submissions
|
|
|
|
|
|
EP-312/2008/A
|
Disposal of
Contaminated Sediment - Dredging, Management and Capping of sediment
Disposal Facility at Sha
Chau
|
Monthly
Progress Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html
|
|
|
|
|
|
EP-466/2013
|
NENT - Castle
Peak Road Diversion
|
Location
Plans
|
https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html
|
|
|
|
|
|
EP-473/2013/A
|
Fanling Bypass Eastern
Section
|
Baseline
Condition Survey and Baseline Vibration Impact Assessment Report
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
EP-454/2013
|
Reprovisioning
of FEHD Sai Yee Street
Vehicle Depot at Yen Ming Road, West Kowloon Reclamation Area
|
Submission
of Environmental Impact Monitoring Report(Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4542013_content.html
|
|
|
|
|
|
Submission
as required by Environmental Permit Condition - EM&A Report
|
|
|
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
|
|
|
- Island District
|
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report(Jul 2020)
(HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Quarterly Environmental Monitoring and Audit
Report (Dec 2019 to Feb 2020)(HY/2013/04)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report(Jul 2020) (HY/2019/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Quarterly Environmental Monitoring and Audit
Report (Feb 2020 to May 2020)(HY/2019/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Quarterly Environmental Monitoring and Audit
Report (Mar 2020 to May 2020)(HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at Lamma Extension
|
Monthly EM&A Report (Jul 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at Lamma Extension
|
Monthly Environmental Monitoring and Audit
Report Unit L10& L11 (Jul 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
|
|
|
EP-01/097/2001/C
|
Water Recreation Centre at Penny's Bay (part &
remaining part)
|
Monthly Environmental Monitoring and Audit Report (No.
180)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report(Jul 2020) (HY/2011/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report(Apr 2020) (HMWSD 1/2019 (EP))
|
https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report(Jul 2020) (HMWSD 1/2019 (EP))
|
https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao Bridge
Hong Kong Link Road
|
Monthly EM&A Report(Jun 2020) (HMWSD 1/2019 (EP))
|
https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report(Aug 2019) (HMWSD 1/2019 (EP))
|
https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report(Jul 2019) (HMWSD 1/2019 (EP))
|
https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report(Jun 2019) (HMWSD 1/2019 (EP))
|
https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report(May 2019) (HMWSD 1/2019 (EP))
|
https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report(Apr 2019) (HMWSD 1/2019 (EP))
|
https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao Bridge
Hong Kong Link Road
|
Monthly EM&A Report(Mar 2019) (HMWSD 1/2019 (EP))
|
https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report(Feb 2019) (HMWSD 1/2019 (EP))
|
https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report(Jan 2019) (HMWSD 1/2019 (EP))
|
https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report(Dec 2018) (HMWSD 1/2019 (EP))
|
https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.25(Rev A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines (GT5 & GT7)
into a Combined Cycle Unit
|
Monthly Environmental Monitoring And Audit Report (Jul
2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok
Link
|
Twenty-sixth Quarterly Environmental
Monitoring and Audit Report (HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok
Link
|
Monthly Environmental Monitoring and Audit
Report (Jun 2020)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok
Link
|
8th Quarterly Environmental Monitoring and
Audit Report (HY/2017/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok
Link
|
Monthly Environmental Monitoring and Audit
Report (Jul 2020)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok
Link
|
Monthly Environmental Monitoring and Audit
Report (Jul 2020)(HY/2017/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-312/2008/A
|
Disposal of Contaminated Sediment -
Dredging, Management and Capping of sediment Disposal Facility at Sha Chau
|
Quarterly EM&A Report (Apr to Jun 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html
|
|
|
|
|
|
EP-489/2014
|
Expansion of
Hong Kong International Airport into a Three-Runway System
|
Construction
Phase Monthly EM&A Report No.55
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
EP-532/2017/A
|
Mui Wo Lai Chi Yuen Cemetery
Extension
|
Monthly EM&A
Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5582019_content.html
|
|
|
|
|
|
EP-535/2017
|
Improvement
Dredging for Lamma
Power Station Navigation Channel
|
Monthly EM&A
Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5352017_content.html
|
|
|
|
|
|
EP-01/059/2000/C
|
The Theme Park
at Penny's Bay, Lantau
|
179th Monthly
EM&A Report (12 Jul 2020 to 11 Aug 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste
Treatment Facilities, Phase I
|
Sixty-second
Monthly EM&A Report(Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste
Treatment Facilities, Phase I
|
Sixteenth
Quarterly EM&A Summary Report (Mar 2019 to May 2019)(V2)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste
Treatment Facilities, Phase I
|
Seventeenth
Quarterly EM&A Summary Report (Jun 2019 to Aug 2019)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste
Treatment Facilities, Phase I
|
Eighteenth
Quarterly EM&A Summary Report (Sep 2019 to Nov 2019)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste
Treatment Facilities, Phase I
|
Nineteenth
Quarterly EM&A Summary Report (Dec 2019 to Feb 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste
Treatment Facilities, Phase I
|
Twentieth Quarterly EM&A Summary Report (Mar
2020 to May 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
EP-519/2016
|
Tung Chung New Town
Extension
|
Monthly EM&A
Report(May 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
|
EP-519/2016
|
Tung Chung New
Town Extension
|
Monthly EM&A
Report(Jun 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
|
EP-519/2016
|
Tung Chung New
Town Extension
|
Monthly EM&A
Report(Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road
|
Quarterly
Environmental Monitoring and Audit Report (Mar 2020 to May
2020)(HY/2011/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing
Facilities
|
Quarterly
Environmental Monitoring and Audit Report (Mar 2020 to May
2020)(HY/2013/04)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
|
- North District
|
|
|
|
|
|
FEP-02/474/2013
|
Shek
Wu Hui Effluent
Polishing Plant
|
Quarterly EM&A Report(Apr 2020 to Jun
2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html
|
|
|
|
|
|
FEP-02/474/2013
|
Shek
Wu Hui Effluent
Polishing Plant
|
Monthly EM&A Report(Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html
|
|
|
|
|
|
EP-534/2017
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html
|
|
|
|
|
|
EP-534/2017/A
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html
|
|
|
|
|
|
FEP-01/534/2017
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html
|
|
|
|
|
|
FEP-01/534/2017/A
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html
|
|
|
|
|
|
FEP-01/460/2013
|
Development of
Organic Waste Treatment Facilities, Phase 2
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1912019_content.html
|
|
|
|
|
|
FEP-01/460/2013
|
Development of
Organic Waste Treatment Facilities, Phase 2
|
Quarterly EM&A Report (Dec 2019 to Feb
2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1912019_content.html
|
|
|
|
|
|
EP-477/2013
|
Development of Lok
Ma Chau Loop
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html
|
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Monthly EM&A Report (Jul 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Monthly EM&A Report (May 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Quarterly EM&A Report (May 2020 to Jul 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo
Highway/Fanling Highway
between Island House Interchange and Fanling
|
Monthly EM&A Report (Jul 2020)(HY/2012/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo
Highway/Fanling Highway
between Island House Interchange and Fanling
|
Monthly EM&A Report (Jul 2020)(CV/2012/09)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo
Highway/Fanling Highway
between Island House Interchange and Fanling
|
Quarterly EM&A Report (May 2020 - Jul 2020)
(HY/2012/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo
Highway/Fanling Highway
between Island House Interchange and Fanling
|
Quarterly EM&A Report (May 2020 - Jul
2020)(HY/2012/09)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
EP-470/2013
|
NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works
|
Monthly EM&A Report(Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html
|
|
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary Wholesale Market in Fanling North New Development Area
|
Monthly EM&A Report(Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
|
|
EP-468/2013/A
|
Kwu Tung North New Development Area Road D1 to D5
|
Monthly EM&A Report(Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html
|
|
|
|
|
|
EP-502/2015/A
|
Operation of the Existing Tai Lam Explosives Magazine at
Tai Shu Ha, Yuen Long
for Liantang / Heung
Yuen Wai Boundary
Control Point Project
|
Monthly EM&A Report
(Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5052016_content.html
|
|
|
|
|
|
EP-517/2017/A
|
Expansion of Sha
Tau Kok Sewage Treatment
Works
|
Monthly EM&A
Report(Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html
|
|
|
|
|
|
EP-329/2009
|
Provision of Cremators at Wo Hop Shek
Crematorium
|
Monthly EM&A Report
(Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
|
|
|
EP-510/2016
|
Police Facilities in Kong Nga Po
|
Monthly EM&A
Report(Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5102016_content.html
|
|
|
|
|
|
- Sai Kung
District
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04
- Cha Kwo Ling
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
FEP-01/503/2015/A
|
Desalination Plant at Tseung
Kwan O
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1922019_content.html
|
|
|
|
|
|
EP-319/2009/D
|
Development of a Biodiesel Plant at Tseung
Kwan O Industrial Estate
|
Monthly EM&A Report (Jul 2020) (V.1)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4242014_content.html
|
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung Hom Section
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
|
EP-503/2015/A
|
Desalination Plant at Tseung
Kwan O
|
24th Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5402018_content.html
|
|
|
|
|
|
EP-513/2016
|
Development of Anderson Road Quarry site - Road
Improvement Works
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html
|
|
|
|
|
|
EP-459/2013
|
Cross Bay Link, Tseung Kwan O
|
Monthly EM&A Report (Jul 2020)(Version 2)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
|
|
|
|
|
|
FEP-01/308/2008/B
|
South-East New Territories Landfill Extension
|
Monthly EM&A Report No.17 (May 2020)(v1)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
FEP-01/308/2008/B
|
South-East New Territories Landfill Extension
|
Monthly EM&A Report No.19 (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
FEP-01/308/2008/B
|
South-East New Territories Landfill Extension
|
Quarterly EM&A Report (Apr 2020 to Jun 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
EP-134/2002/N
|
Fill Bank at Tseung Kwan O Area
137
|
Monthly Environmental Monitoring and Audit Report (Jul
2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5632019_content.html
|
|
|
|
|
|
EP-134/2002/N
|
Fill Bank at Tseung Kwan O Area
137
|
Quarterly Environmental Monitoring and Audit Report (May
2020 to Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5632019_content.html
|
|
|
|
|
|
- Sha Tin
District
|
|
|
|
|
|
EP-494/2015
|
In-situ Reprovisioning of Sha Tin Water Treatment Works - South Works
|
Monthly EM&A Report No.53
|
http://www.epd.gov.hk/eia/english/register/aep/ep4942014_content.html
|
|
|
|
|
|
EP-463/2013/B
|
Widening and Reconstruction of Tai Po Road (Sha Tin Section)
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5142016_content.html
|
|
|
|
|
|
EP-533/2017
|
Sha Tin Cavern Sewage Treatment Works
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html
|
|
|
|
|
|
EP-345/2009
|
Inter-reservoirs Transfer Scheme (IRTS) - Water
Tunnel between Kowloon Byewash
Reservoir and Lower Shing
Mun Reservoir
|
13th Monthly EM&A Report(Rev.1)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3452009_content.html
|
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung Hom Section
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
|
- Tai Po District
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo
Highway/Fanling Highway
between Island House Interchange and Fanling
|
Monthly EM&A Report (Jul 2020)(HY/2012/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo
Highway/Fanling Highway
between Island House Interchange and Fanling
|
Monthly EM&A Report (Jul 2020)(CV/2012/09)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo
Highway/Fanling Highway
between Island House Interchange and Fanling
|
Quarterly EM&A Report (May 2020 - Jul 2020)
(HY/2012/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo
Highway/Fanling Highway
between Island House Interchange and Fanling
|
Quarterly EM&A Report (May 2020 - Jul
2020)(HY/2012/09)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
EP-470/2013
|
NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works
|
Monthly EM&A Report(Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html
|
|
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary Wholesale Market in Fanling North New Development Area
|
Monthly EM&A Report(Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
|
|
EP-468/2013/A
|
Kwu Tung North New Development Area Road D1 to D5
|
Monthly EM&A Report(Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html
|
|
|
|
|
|
EP-388/2010
|
Development of a Bathing Beach at Lung Mei, Tai Po
|
Monthly EM&A Report(May 2020) (CV/2012/05)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
EP-388/2010
|
Development of a Bathing Beach at Lung Mei, Tai Po
|
Quarterly EM&A Report(Mar 2018 to May 2018)
(CV/2012/05)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
- Tsuen Wan District
|
|
|
|
|
|
EP-076/2000
|
Upgrading of Siu
Ho Wan Sewage Treatment Plant
|
Monthly Environmental Monitoring And Audit
Report (Jul 2020)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html
|
|
|
|
|
|
EP-076/2000
|
Upgrading of Siu
Ho Wan Sewage Treatment Plant
|
Quarterly Environmental Monitoring And
Audit Report (May 2020 to Jul 2020)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jul
2020)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jul 2020)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/10)(Apr 2020 to Jun
2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong
Kong International Airport into a Three-Runway System
|
Construction Phase Monthly EM&A Report
No.55
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste
Treatment Facilities, Phase I
|
Sixty-second Monthly EM&A Report(Jul
2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste
Treatment Facilities, Phase I
|
Sixteenth Quarterly EM&A Summary Report
(Mar 2019 to May 2019)(V2)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste
Treatment Facilities, Phase I
|
Seventeenth Quarterly EM&A Summary
Report (Jun 2019 to Aug 2019)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste
Treatment Facilities, Phase I
|
Eighteenth Quarterly EM&A Summary
Report (Sep 2019 to Nov 2019)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste
Treatment Facilities, Phase I
|
Nineteenth Quarterly EM&A Summary
Report (Dec 2019 to Feb 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste
Treatment Facilities, Phase I
|
Twentieth
Quarterly EM&A Summary Report (Mar 2020 to May 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
- Tuen Mun District
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Twenty-sixth Quarterly Environmental
Monitoring and Audit Report (HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun
- Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Jun 2020)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun
- Chek Lap Kok Link
|
8th Quarterly Environmental Monitoring and
Audit Report (HY/2017/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun
- Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Jul 2020)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun
- Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Jul 2020)(HY/2017/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.25(Rev A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
FEP-02/507/2016/B
|
Additional Gas-fired Generation units Project - Installation
of one additional gas-fired generation unit (CCGT Unit No. 1) at the Black
Point Power Station
|
Monthly EM&A Report no.44
|
https://www.epd.gov.hk/eia/english/register/index8/vep5522018_content.html
|
|
|
|
|
|
EP-507/2016/C
|
Installation of One additional gas-fired generation unit
(CCGT Unit No. 1) at the Black Point Power Station
|
Monthly EM&A Report no.44
|
https://www.epd.gov.hk/eia/english/register/index8/vep5752020_content.html
|
|
|
|
|
|
EP-507/2016/C
|
Installation of One additional gas-fired generation unit
(CCGT Unit No. 1) at the Black Point Power Station
|
Environmental Monitoring and Audit Manual
|
https://www.epd.gov.hk/eia/english/register/index8/vep5752020_content.html
|
|
|
|
|
|
EP-534/2017
|
Site Formati3on and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html
|
|
|
|
|
|
EP-534/2017/A
|
Site Formation and Associated Infrastructural Works
for Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html
|
|
|
|
|
|
FEP-01/534/2017
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html
|
|
|
|
|
|
FEP-01/534/2017/A
|
Site Formation and Associated Infrastructural Works
for Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html
|
|
|
|
|
|
EP-441/2012/A
|
Enhanced Ash Utilisation
and Water Management Facilities at the Castle Peak Power Station (CPPS)
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5432018_content.html
|
|
|
|
|
|
EP-210/2005/D
|
Expansion and Extension of Fill Bank at Tuen Mun Area 38
|
Monthly EM&A Report(Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5772020_content.html
|
|
|
|
|
|
EP-210/2005/D
|
Expansion and Extension of Fill Bank at Tuen Mun Area 38
|
Quarterly EM&A Report(May 2020 to Jul
2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5772020_content.html
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong International
Airport into a Three-Runway System
|
Construction Phase Monthly EM&A Report
No.55
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
- Yuen Long District
|
|
|
|
|
|
EP-477/2013
|
Development of Lok
Ma Chau Loop
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html
|
|
|
|
|
|
EP-464/2013
|
Expansion of Ha Tsuen
Sewage Pumping Station
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4642013_content.html
|
|
|
|
|
|
EP-464/2013
|
Expansion of Ha Tsuen
Sewage Pumping Station
|
Quarterly EM&A
Report (May 2020 to Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4642013_content.html
|
|
|
|
|
|
EP-450/2013/A
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha
Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Jul 2020)(Version 1.0)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html
|
|
|
|
|
|
EP-501/2015
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha
Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Jul 2020)(Version 1.0)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html
|
|
|
|
|
|
EP-502/2015/A
|
Operation of the Existing Tai Lam Explosives Magazine at
Tai Shu Ha, Yuen Long
for Liantang / Heung
Yuen Wai Boundary
Control Point Project
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5052016_content.html
|
|
|
|
|
|
- Kwai Tsing District
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jul
2020)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jul 2020)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/10)(Apr 2020 to Jun
2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-426/2011/A
|
Providing Sufficient Water Depth for Kwai Tsing
Container Basin and its Approach Channel
|
Monthly Environmental Monitoring & Audit Report (Jul
2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep3692012_content.html
|
|
|
|
|
|
EP-426/2011/A
|
Providing Sufficient Water Depth for Kwai Tsing
Container Basin and its Approach Channel
|
Quarterly Environmental Monitoring & Audit Report
(Mar 2020 to May 2020)(CV/2013/04)
|
https://www.epd.gov.hk/eia/english/register/index8/vep3692012_content.html
|
|
|
|
|
|
- Central & Western District
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Jul 2020)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Quarterly EM&A Report (May 2020 to Jul 2020)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Jul
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)
|
Monthly EM&A Report (Jul 2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Jul
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central-Wanchai Bypass (CWB) including its road tunnel
and slip roads
|
Monthly EM&A Report (Jul
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Jul
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
FEP-11/364/2009/E
|
Central - Wan Chai Bypass -
Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel
Commissioning (Contract No. HY/2011/08)
|
Monthly EM&A Report (Jul
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Jul
2020)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as primary/district
distributor roads
|
Quarterly EM&A Report (May 2020 to Jul
2020)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (May 2020 to Jul
2020)(HK/2015/01)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (May 2020 to Jul
2020)(HK/2015/01)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Monthly
EM&A Report (Jul 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Quarterly
EM&A Report (Mar 2020 to May 2020)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Quarterly
EM&A Report (Mar 2020 to May 2020)(HK/2015/01)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly
EM&A Report (Jul 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Quarterly
EM&A Report (Mar 2020 to May 2020)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Jul 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly
EM&A Report (Mar 2020 to May 2020)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jul
2020)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jul 2020)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/10)(Apr 2020 to Jun
2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-408/2011/C
|
Central Police Station Conservation and Revitalisation Project
|
Monthly EM&A Report(Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4992016_content.html
|
|
|
|
|
|
- Wan Chai District
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Jul 2020)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Jul 2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)
|
Monthly EM&A Report (Jul
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass - Central
Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Jul
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central-Wanchai Bypass (CWB) including its road tunnel
and slip roads
|
Monthly EM&A Report (Jul
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Jul
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
FEP-11/364/2009/E
|
Central - Wan Chai Bypass - Tunnel
Buildings, Systems and Fittings, and Works Associated with Tunnel
Commissioning (Contract No. HY/2011/08)
|
Monthly EM&A Report (Jul
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Monthly
EM&A Report (Jul 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Quarterly
EM&A Report (Mar 2020 to May 2020)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Quarterly
EM&A Report (Mar 2020 to May 2020)(HK/2015/01)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly
EM&A Report (Jul 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Quarterly
EM&A Report (Mar 2020 to May 2020)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Jul 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly
EM&A Report (Mar 2020 to May 2020)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Jul 2020)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as primary/district
distributor roads
|
Quarterly EM&A Report (May 2020 to Jul
2020)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (May 2020 to Jul
2020)(HK/2015/01)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (May 2020 to Jul
2020)(HK/2015/01)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
|
|
|
EP-436/2012/F
|
Shatin to Central Link - Hung Hom to Admiralty Section
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jul
2020)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jul 2020)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/10)(Apr 2020 to Jun
2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
- Eastern District
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Jul 2020)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Quarterly EM&A Report (May 2020 to Jul 2020)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Jul
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)
|
Monthly EM&A Report (Jul
2020)(HK/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Jul
2020)(HK/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central-Wanchai Bypass (CWB) including its road tunnel
and slip roads
|
Monthly EM&A Report (Jul
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Jul
2020)(HK/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
FEP-11/364/2009/E
|
Central - Wan Chai Bypass - Tunnel
Buildings, Systems and Fittings, and Works Associated with Tunnel
Commissioning (Contract No. HY/2011/08)
|
Monthly EM&A Report (Jul
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Monthly
EM&A Report (Jul 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Quarterly
EM&A Report (Mar 2020 to May 2020)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Quarterly
EM&A Report (Mar 2020 to May 2020)(HK/2015/01)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly
EM&A Report (Jul 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Quarterly
EM&A Report (Mar 2020 to May 2020)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Jul 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly
EM&A Report (Mar 2020 to May 2020)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jul 2020)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jul 2020)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/10)(Apr 2020 to Jun
2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (May 2020 to Jul
2020)(HK/2015/01)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (May 2020 to Jul
2020)(HK/2015/01)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04
- Cha Kwo Ling
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
EP-459/2013
|
Cross Bay Link, Tseung Kwan O
|
Monthly EM&A Report (Jul 2020)(Version
2)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
|
|
|
|
|
|
- Southern District
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jul
2020)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jul 2020)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/10)(Apr 2020 to Jun
2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-537/2017
|
Proposed Extension of Academic Block, The Swire Institute
of Marine Science, Faculty of Science, The University of Hong Kong, Cape D’Aguilar Road, Shek O
|
Monthly EM&A Report No.34
|
http://www.epd.gov.hk/eia/8english/register/aep/ep5372017_content.html
|
|
|
|
|
|
EP-487/2014/A
|
Tai Shue
Wan Development at Ocean Park
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
- Kowloon City District
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Mar 2020 to May
2020)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Jul 2020)
(ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Jul
2020)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Jul
2020)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Jul
2020)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Apr 2020 to Jun
2020)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Jul
2020)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Quarterly EM&A Report (Mar 2020 to May
2020)(KL/2012/03)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Jul
2020)(KL/2012/03)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (Jul
2020)(KL/2014/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
|
EP-437/2012/A
|
Shatin to Central Link - Mong
Kok East to Hung Hom Section
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5352017_content.html
|
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung Hom Section
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
|
EP-451/2013
|
Trunk Road T2
|
Monthly EM&A Report (Jul 2020)(KL/2014/03)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
|
|
|
|
|
|
EP-451/2013
|
Trunk Road T2
|
Monthly EM&A Report (Jul
2020)(ED/2018/04)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
|
|
|
|
|
|
EP-445/2013/A
|
Kai Tak
Development – Roads D3A & D4A
|
Monthly EM&A Report (Jul 2020) (ED/2018/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
|
|
EP-445/2013/A
|
Kai Tak
Development – Roads D3A & D4A
|
Monthly EM&A Report (Jul 2020)(KL/2014/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
|
|
EP-544/2017
|
Kai Tak
Sports Park
|
EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
EP-544/2017
|
Kai Tak
Sports Park
|
Quarterly EM&A Report (Apr 2020 to Jun 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Jul 2020)(HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201420.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Jul 2020)(HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201802.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Jul 2020)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201808.html
|
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak West
|
Monthly EM&A Report (Jul 2020)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
|
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (Jul 2020)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html
|
|
|
|
|
|
- Kwun Tong
District
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Mar 2020 to May
2020)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Jul 2020)
(ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Jul
2020)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Jul
2020)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Jul
2020)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Apr 2020 to Jun
2020)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Jul
2020)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Quarterly EM&A Report (Mar 2020 to May
2020)(KL/2012/03)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Jul
2020)(KL/2012/03)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (Jul
2020)(KL/2014/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04
- Cha Kwo Ling
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
EP-513/2016
|
Development of Anderson Road Quarry site - Road
Improvement Works
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html
|
|
|
|
|
|
EP-544/2017
|
Kai Tak
Sports Park
|
EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
EP-544/2017
|
Kai Tak
Sports Park
|
Quarterly EM&A Report (Apr 2020 to Jun 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Jul 2020)(HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201420.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Jul 2020)(HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201802.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Jul 2020)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201808.html
|
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak West
|
Monthly EM&A Report (Jul 2020)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
|
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (Jul 2020)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html
|
|
|
|
|
|
- Sham Shui Po
District
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jul
2020)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jul 2020)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/10)(Apr 2020 to Jun
2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
- Wong Tai Sin District
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Mar 2020 to May
2020)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Jul
2020)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Jul 2020)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Jun 2020)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Jul 2020)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Apr 2020 to Jun
2020)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Jul
2020)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Quarterly EM&A Report (Mar 2020 to May
2020)(KL/2012/03)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Jul
2020)(KL/2012/03)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (Jul
2020)(KL/2014/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung Hom Section
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
|
EP-544/2017
|
Kai Tak
Sports Park
|
EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
EP-544/2017
|
Kai Tak
Sports Park
|
Quarterly EM&A Report (Apr 2020 to Jun 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
- Yau Tsim
Mong District
|
|
|
|
|
|
EP-436/2012/F
|
Shatin to Central Link - Hung Hom to Admiralty Section
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html
|
|
|
|
|
|
EP-437/2012/A
|
Shatin to Central Link - Mong
Kok East to Hung Hom Section
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5352017_content.html
|
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung Hom Section
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
|
EP-453/2013/B
|
Underpass Road and Austin Road Flyover Serving the West
Kowloon Cultural District
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html
|
|
|
|
|
|
EP-455/2013
|
Proposed Road Improvement Works in West Kowloon
Reclamation Development Phase 1
|
Monthly EM&A Report (Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4552013_content.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Jul 2020)(HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201420.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Jul 2020)(HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201802.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Jul 2020)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201808.html
|
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak West
|
Monthly EM&A Report (Jul 2020)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
|
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (Jul 2020)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html
|
|
|
|
|
|
EP-523/2016
|
Proposed Sewage Pumping Station and Dry Weather Flow
Interceptor at Cherry Street Box Culvert
|
Submission of Monthly EM&A
Report No.31
|
https://www.epd.gov.hk/eia/english/register/aep/ep5232016_content.html
|
|
|
|
|
|
|
|
|
|
|
|
|