Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
|
|
|
|
|
Application
for EIA Study Brief
|
|
|
|
|
|
|
Nil
|
|
|
|
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
|
|
|
|
Nil
|
|
|
|
|
|
|
Application
for Approval of EIA Report
|
|
|
|
|
|
|
EIA-273/2021
|
Revised
Trunk Road T4 in Sha Tin
|
EIA Reports
|
https://www.epd.gov.hk/eia/register/report/eiareport/eia_2732021/Index.htm
|
|
|
|
|
|
|
Application
for Environmental Permit
|
|
|
|
|
|
|
AEP-594/2021
|
Installation
of the Proposed 132kV Cable Circuits Connecting with Ho To West Substation
and Existing 132kV Fanling to Mai Po Cable
Circuits
|
Environmental
Permit issued (EP-594/2021)
|
https://www.epd.gov.hk/eia/register/permit/latest/ep5942021.htm
|
|
|
|
|
|
|
AEP-595/2021
|
Asia
Direct Cable System - Hong Kong Segment (ADC-HK) - Chung Hom Kok
|
Environmental
Permit issued (EP-595/2021)
|
https://www.epd.gov.hk/eia/register/permit/latest/ep5952021.htm
|
|
|
|
|
|
|
Application
for Variation of an Environmental Permit
|
|
|
|
|
|
|
VEP-596/2021
|
Siu Ho Wan Water Treatment Works
Extension
|
Environmental
Permit issued (EP-207/2005/A)
|
https://www.epd.gov.hk/eia/register/permit/latest/vep5962021.htm
|
|
|
|
|
|
|
VEP-597/2021
|
Hong
Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline
for Black Point Power Station (BPPS) and the associated Gas Receiving
Station (GRS) in BPPS
|
Environmental
Permit issued (FEP-03/558/2018/B)
|
https://www.epd.gov.hk/eia/register/permit/latest/vep5972021.htm
|
|
|
|
|
|
|
VEP-598/2021
|
Reuse
of Treated Sewage Effluent from a Treatment Plant at Hong Kong Vipassana Meditation Centre, Lantau
Island
|
Environmental
Permit issued (EP-580/2020/A)
|
https://www.epd.gov.hk/eia/register/permit/latest/vep5982021.htm
|
|
|
|
|
|
|
VEP-599/2021
|
Drainage
Improvement Works at Ngong Ping
|
Environmental
Permit issued (EP-456/2013/B)
|
https://www.epd.gov.hk/eia/register/permit/latest/vep5992021.htm
|
|
|
|
|
|
|
Application
for Further Environmental Permit
|
|
|
|
|
|
|
Nil
|
|
|
|
|
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental
Submissions
|
|
|
|
|
|
|
EP-575/2020
|
H2H Express
Submarine Cable
|
Post-Project
Coral Survey Report(Aug 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5752020_content.html
|
|
|
|
|
|
|
EP-503/2015/A
|
Desalination Plant at Tseung
Kwan O
|
Detailed
Design Plan for Chlorine and Carbon Dioxide Storage of Desalination Plant
|
https://www.epd.gov.hk/eia/english/register/index8/vep5402018_content.html
|
|
|
|
|
|
|
EP-01/503/2015/A
|
Desalination Plant at Tseung
Kwan O
|
Detailed
Design Plan for Chlorine and Carbon Dioxide Storage of Desalination Plant
|
https://www.epd.gov.hk/eia/english/register/index7/fep1922019_content.html
|
|
|
|
|
|
|
EP-453/2013/B
|
Underpass Road
and Austin Road Flyover Serving the West Kowloon Cultural District
|
Landscape
Mitigation Plan (4th Submission to EPD)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html
|
|
|
|
|
|
|
EP-226/2005/G
|
Development
of an EcoPark in Tuen Mun Area 38
|
Technical
Note for 24 Hours Operation of Pilot Plant at Lot T8-T11 at EcoPark(Jan 2022 to
Dec 2023)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5882021_content.html
|
|
|
|
|
|
|
EP-487/2014/A
|
Tai Shue Wan Development at Ocean Park
|
Visual and
Landscape Plan(RevC)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html
|
|
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central
Link - Tai Wai to Hung Hom
Section
|
Monthly
Operational Airborne Rail Noise Monitoring Report (Wing Fung Building) No.2
|
https://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
|
|
EP-477/2013
|
Development
of Lok Ma Chau Loop
|
Re-appraisal Report
|
https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html
|
|
|
|
|
|
|
EP-541/2017/A
|
Flyover from Kwai
Tsing Interchange Upramp
to Kwai Chung Road
|
Alternative
Air Quality Monitoring Station
|
https://www.epd.gov.hk/eia/english/register/index8/vep5842020_content.html
|
|
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Monitoring
Report for Wetland Compensation Area (NO.10) (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
|
|
EP-487/2014/A
|
Tai Shue Wan Development at Ocean Park
|
Noise Audit
Report (Aug 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html
|
|
|
|
|
|
|
EP-477/2013
|
Development
of Lok Ma Chau Loop
|
Submission
of Revised Remediation Report
|
https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html
|
|
|
|
|
|
|
EP-482/2013/C
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
As-built Drawings of Landscape and Visual Mitigation
Measures
|
https://www.epd.gov.hk/eia/english/register/index8/vep5732020_content.html
|
|
|
|
|
|
|
EP-489/2014
|
Expansion of
Hong Kong International Airport into a Three-Runway System
|
Submission
of Management Organizations(Aug 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
Submission
as required by Environmental Permit Condition - EM&A Report
|
|
|
|
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
|
|
|
|
- Island District
|
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong International Airport into a Three-Runway
System
|
Construction Phase Monthly EM&A Report No.67
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines (GT5 & GT7) into a
Combined Cycle Unit
|
Monthly Environmental Monitoring And Audit Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
|
|
|
|
FEP-01/558/2018/A
|
Hong Kong Offshore
LNG Terminal - Works associated with the double berth jetty at LNG Terminal
|
Monthly
Environmental Monitoring and Audit (EM&A) Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html
|
|
|
|
|
|
|
EP-532/2017/A
|
Mui Wo Lai
Chi Yuen Cemetery Extension
|
Monthly EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5582019_content.html
|
|
|
|
|
|
|
FEP-02/558/2018/A
|
Hong Kong Offshore
LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas
Receiving Station (GRS) in LPS
|
Monthly
Environmental Monitoring and Audit (EM&A) Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html
|
|
|
|
|
|
|
FEP-03/558/2018/A
|
Hong Kong
Offshore LNG Terminal - Works associated with the subsea gas pipeline for
Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS)
in BPPS
|
Monthly
Environmental Monitoring and Audit (EM&A) Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5872020_content.html
|
|
|
|
|
|
|
FEP-01/558/2018/A
|
Hong Kong Offshore
LNG Terminal - Works associated with the double berth jetty at LNG Terminal
|
Quarterly
Environmental Monitoring and Audit (EM&A) Report(Apr 2021 to Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html
|
|
|
|
|
|
|
FEP-02/558/2018/A
|
Hong Kong Offshore
LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas
Receiving Station (GRS) in LPS
|
Quarterly
Environmental Monitoring and Audit (EM&A) Report(Apr 2021 to Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html
|
|
|
|
|
|
|
FEP-03/558/2018/A
|
Hong Kong Offshore
LNG Terminal - Works associated with the subsea gas pipeline for Black
Point Power Station (BPPS) and the associated Gas Receiving Station (GRS)
in BPPS
|
Quarterly
Environmental Monitoring and Audit (EM&A) Report(Apr 2021 to Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5872020_content.html
|
|
|
|
|
|
|
FEP-01/558/2018/A
|
Hong Kong Offshore
LNG Terminal - Works associated with the double berth jetty at LNG Terminal
|
Updated
Environmental Monitoring and Audit (EM&A) Manual
|
https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html
|
|
|
|
|
|
|
FEP-02/558/2018/A
|
Hong Kong Offshore
LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas
Receiving Station (GRS) in LPS
|
Updated
Environmental Monitoring and Audit (EM&A) Manual
|
https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html
|
|
|
|
|
|
|
FEP-03/558/2018/A
|
Hong Kong Offshore
LNG Terminal - Works associated with the subsea gas pipeline for Black
Point Power Station (BPPS) and the associated Gas Receiving Station (GRS)
in BPPS
|
Updated
Environmental Monitoring and Audit (EM&A) Manual
|
https://www.epd.gov.hk/eia/english/register/index8/vep5872020_content.html
|
|
|
|
|
|
|
EP-071/2000/D
|
1,800 MW Gas-Fired Power Station at Lamma Extension
|
Monthly
Environmental Monitoring and Audit Report Unit L11& L12 (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html
|
|
|
|
|
|
|
EP-071/2000/D
|
1,800 MW Gas-Fired Power Station at Lamma Extension
|
Environmental
Monitoring and Audit Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html
|
|
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing
Facilities
|
Monthly
EM&A Report(Jul 2021)(HY/2019/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
|
|
EP-353/2009/K
|
Hong
Kong - Zhuhai - Macao Bridge Hong Kong Boundary
Crossing Facilities
|
Monthly EM&A
Report(Jul 2021) (HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development
of the Integrated Waste Management Facilities Phase 1
|
Monthly
EM&A Report No.37(Rev A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
|
EP-01/097/2001/C
|
Water Recreation Centre at Penny's Bay
(part & remaining part)
|
Monthly Environmental Monitoring and
Audit Report (No. 192)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
|
|
|
|
EP-352/2009/D
|
Hong
Kong - Zhuhai - Macao Bridge Hong Kong Link Road
|
Monthly EM&A
Report(Jul 2021) (HY/2011/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
|
|
EP-456/2013/A
|
Drainage Improvement Works at Ngong Ping
|
Monthly Environmental Monitoring And
Audit Report (Jul 2021)(DC/2019/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5592019_content.html
|
|
|
|
|
|
|
EP-560/2018
|
Intermodal
Transfer Terminal – Bonded Vehicular Bridge and Associated Roads
|
EM&A
Report(Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5602018_content.html
|
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
|
EP-535/2017
|
Improvement Dredging for Lamma Power
Station Navigation Channel
|
Monthly
EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5352017_content.html
|
|
|
|
|
|
|
EP-312/2008/A
|
Disposal of
Contaminated Sediment - Dredging, Management and Capping of sediment
Disposal Facility at Sha Chau
|
Monthly Progress Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html
|
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste
Treatment Facilities, Phase I
|
Seventy-fourth Monthly EM&A
Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
191st Monthly EM&A Report (12
Jul 2021 – 11 Aug
2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
|
|
|
|
- North District
|
|
|
|
|
|
|
EP-534/2017/A
|
Site
Formation and Associated Infrastructural Works for Development of Columbarium,
Crematorium and Related Facilities at Sandy Ridge Cemetery
|
Monthly EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html
|
|
|
|
|
|
|
EP-534/2017
|
Site
Formation and Associated Infrastructural Works for Development of
Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery
|
Monthly EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html
|
|
|
|
|
|
|
FEP-01/534/2017
|
Site
Formation and Associated Infrastructural Works for Development of
Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery
|
Monthly EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html
|
|
|
|
|
|
|
FEP-01/534/2017/A
|
Site
Formation and Associated Infrastructural Works for Development of Columbarium,
Crematorium and Related Facilities at Sandy Ridge Cemetery
|
Monthly EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html
|
|
|
|
|
|
|
EP-477/2013
|
Development
of Lok Ma Chau Loop
|
Monthly EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html
|
|
|
|
|
|
|
EP-329/2009
|
Provision of Cremators at Wo Hop Shek Crematorium
|
Monthly
EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
|
|
|
|
EP-329/2009
|
Provision of Cremators at Wo Hop Shek Crematorium
|
Monthly
EM&A Report (Aug 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
|
|
|
|
EP-324/2008/E
|
Widening
of Tolo Highway/Fanling
Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Jul 2021)(HY/2012/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
|
EP-324/2008/E
|
Widening
of Tolo Highway/Fanling
Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Aug 2021)(HY/2012/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
|
EP-324/2008/E
|
Widening
of Tolo Highway/Fanling
Highway between Island House Interchange and Fanling
|
Monthly EM&A Report
(Jul 2021)(CV/2012/09)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
|
EP-517/2017/A
|
Expansion
of Sha Tau Kok Sewage
Treatment Works
|
Monthly EM&A Report
(Jul
2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html
|
|
|
|
|
|
|
EP-510/2016
|
Police Facilities in
Kong Nga Po
|
Monthly EM&A Report (Jul
2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5102016_content.html
|
|
|
|
|
|
|
FEP-02/474/2013
|
Shek Wu Hui Effluent Polishing Plant
|
Monthly
EM&A Report(Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html
|
|
|
|
|
|
|
EP-470/2013
|
NENT - Utilization of Treated Sewage
Effluent (TSE) from Shek Wu Hui
Sewage Treatment Works
|
Monthly
EM&A Report(Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html
|
|
|
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary Wholesale Market in Fanling
North New Development Area
|
Monthly
EM&A Report(Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
|
|
|
EP-468/2013/A
|
Kwu Tung North New Development Area Road D1 to D5
|
Monthly
EM&A Report(Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html
|
|
|
|
|
|
|
EP-466/2013
|
NENT
- Castle Peak Road Diversion
|
Monthly EM&A Report(Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html
|
|
|
|
|
|
|
EP-467/2013/A
|
Kwu
Tung North New Development Area Road P1 and P2 and Associated New Kwu Tung Interchange and Pak Shek
Au Interchange Improvement
|
Monthly EM&A Report(Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html
|
|
|
|
|
|
|
EP-469/2013
|
NENT - Sewage Pumping Stations in Kwu
Tung North New Development Area
|
Monthly EM&A Report(Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html
|
|
|
|
|
|
|
EP-473/2013/A
|
Fanling
Bypass Eastern Section
|
Monthly EM&A Report(Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai Boundary Control Point and Associated Works
|
Monthly EM&A Report
(Jul 2021)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
|
|
FEP-01/460/2013/A
|
Development of
Organic Waste Treatment Facilities, Phase 2
|
Monthly
EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5792020_content.html
|
|
|
|
|
|
|
- Sai Kung
District
|
|
|
|
|
|
|
EP-134/2002/N
|
Fill Bank at
Tseung Kwan O Area 137
|
Monthly
Environmental Monitoring and Audit Report (Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5632019_content.html
|
|
|
|
|
|
|
FEP-01/503/2015/A
|
Desalination Plant at Tseung Kwan O
|
Monthly EM&A Report
(Jul
2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1922019_content.html
|
|
|
|
|
|
|
FEP-01/308/2008/B
|
South-East New
Territories Landfill Extension
|
Monthly
EM&A Report No. 31(Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
|
FEP-01/308/2008/B
|
South-East New
Territories Landfill Extension
|
Quarterly
EM&A Report (Apr 2021 to Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
|
EP-503/2015/A
|
Desalination
Plant at Tseung Kwan O
|
2nd
Annual EM&A Review Report(Aug 2019 to Aug2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5402018_content.html
|
|
|
|
|
|
|
EP-503/2015/A
|
Desalination
Plant at Tseung Kwan O
|
Monthly EM&A Report
(Jul
2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5402018_content.html
|
|
|
|
|
|
|
EP-503/2015/A
|
Desalination
Plant at Tseung Kwan O
|
36th Monthly EM&A
Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5402018_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
|
EP-319/2009/D
|
Development of a Biodiesel Plant at Tseung
Kwan O Industrial Estate
|
Monthly EM&A Report (Jul 2021) (V.1)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4242014_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04
- Cha Kwo Ling
|
Monthly EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
|
- Sha Tin
District
|
|
|
|
|
|
|
EP-494/2015
|
In-situ Reprovisioning of Sha
Tin Water Treatment Works - South Works
|
Monthly EM&A Report No.65
|
http://www.epd.gov.hk/eia/english/register/aep/ep4942014_content.html
|
|
|
|
|
|
|
EP-463/2013/B
|
Widening and
Reconstruction of Tai Po Road (Sha Tin Section)
|
Monthly EM&A Report(Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5142016_content.html
|
|
|
|
|
|
|
EP-533/2017
|
Sha Tin Cavern Sewage Treatment Works
|
Monthly EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html
|
|
|
|
|
|
|
EP-345/2009/A
|
Inter-reservoirs
Transfer Scheme (IRTS) - Water Tunnel between Kowloon Byewash
Reservoir and Lower Shing Mun
Reservoir
|
25th Monthly EM&A Report(Rev.2)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5822020_content.html
|
|
|
|
|
|
|
- Tai Po District
|
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway
between Island House Interchange and Fanling
|
Monthly EM&A Report
(Jul 2021)(HY/2012/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway
between Island House Interchange and Fanling
|
Monthly EM&A Report
(Aug 2021)(HY/2012/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway
between Island House Interchange and Fanling
|
Monthly EM&A Report
(Jul 2021)(CV/2012/09)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
|
EP-470/2013
|
NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment
Works
|
Monthly EM&A Report(Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html
|
|
|
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary Wholesale Market in Fanling
North New Development Area
|
Monthly EM&A Report(Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
|
|
|
EP-468/2013/A
|
Kwu Tung North New Development Area Road D1 to D5
|
Monthly EM&A Report(Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html
|
|
|
|
|
|
|
EP-466/2013
|
NENT - Castle Peak Road Diversion
|
Monthly EM&A Report(Jul
2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html
|
|
|
|
|
|
|
EP-467/2013/A
|
Kwu Tung North New
Development Area Road P1 and P2 and Associated New Kwu
Tung Interchange and Pak Shek Au Interchange
Improvement
|
Monthly EM&A Report(Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html
|
|
|
|
|
|
|
EP-469/2013
|
NENT - Sewage Pumping Stations in Kwu
Tung North New Development Area
|
Monthly EM&A Report(Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html
|
|
|
|
|
|
|
EP-473/2013/A
|
Fanling Bypass Eastern Section
|
Monthly EM&A Report(Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
|
- Tsuen Wan District
|
|
|
|
|
|
|
EP-076/2000
|
Upgrading
of Siu Ho Wan Sewage Treatment Plant
|
Monthly
Environmental Monitoring And Audit Report (Jul 2021)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html
|
|
|
|
|
|
|
EP-076/2000
|
Upgrading
of Siu Ho Wan Sewage Treatment Plant
|
Quarterly
Environmental Monitoring And Audit Report (May 2021 to Jul 2021)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html
|
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase
I
|
Seventy-fourth Monthly EM&A Report
(Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Jul 2021)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong International Airport into a Three-Runway
System
|
Construction Phase Monthly EM&A Report No.67
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
- Tuen Mun District
|
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong International Airport into a Three-Runway
System
|
Construction Phase Monthly EM&A Report No.67
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
EP-210/2005/D
|
Expansion and Extension of Fill Bank at Tuen
Mun Area 38
|
Monthly EM&A Report (Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5772020_content.html
|
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development
of the Integrated Waste Management Facilities Phase 1
|
Monthly
EM&A Report No.37(Rev A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
|
FEP-01/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works
associated with the double berth jetty at LNG Terminal
|
Monthly Environmental Monitoring and Audit
(EM&A) Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html
|
|
|
|
|
|
|
FEP-02/558/2018/A
|
Hong Kong Offshore
LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas
Receiving Station (GRS) in LPS
|
Monthly
Environmental Monitoring and Audit (EM&A) Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html
|
|
|
|
|
|
|
FEP-03/558/2018/A
|
Hong Kong Offshore
LNG Terminal - Works associated with the subsea gas pipeline for Black
Point Power Station (BPPS) and the associated Gas Receiving Station (GRS)
in BPPS
|
Monthly
Environmental Monitoring and Audit (EM&A) Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5872020_content.html
|
|
|
|
|
|
|
FEP-01/558/2018/A
|
Hong Kong Offshore
LNG Terminal - Works associated with the double berth jetty at LNG Terminal
|
Quarterly
Environmental Monitoring and Audit (EM&A) Report(Apr 2021 to Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html
|
|
|
|
|
|
|
FEP-02/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works
associated with the subsea gas pipeline for Lamma
Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS
|
Quarterly Environmental Monitoring and
Audit (EM&A) Report(Apr 2021 to Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html
|
|
|
|
|
|
|
FEP-03/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works
associated with the subsea gas pipeline for Black Point Power Station
(BPPS) and the associated Gas Receiving Station (GRS) in BPPS
|
Quarterly Environmental Monitoring and
Audit (EM&A) Report(Apr 2021 to Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5872020_content.html
|
|
|
|
|
|
|
FEP-01/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works
associated with the double berth jetty at LNG Terminal
|
Updated Environmental Monitoring and
Audit (EM&A) Manual
|
https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html
|
|
|
|
|
|
|
FEP-02/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated
with the subsea gas pipeline for Lamma Power
Station (LPS) and the associated Gas Receiving Station (GRS) in LPS
|
Updated Environmental Monitoring and
Audit (EM&A) Manual
|
https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html
|
|
|
|
|
|
|
FEP-03/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated
with the subsea gas pipeline for Black Point Power Station (BPPS) and the
associated Gas Receiving Station (GRS) in BPPS
|
Updated Environmental Monitoring and
Audit (EM&A) Manual
|
https://www.epd.gov.hk/eia/english/register/index8/vep5872020_content.html
|
|
|
|
|
|
|
EP-534/2017/A
|
Site Formation and
Associated Infrastructural Works for Development of Columbarium, Crematorium
and Related Facilities at Sandy Ridge Cemetery
|
Monthly
EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html
|
|
|
|
|
|
|
EP-534/2017
|
Site Formation and
Associated Infrastructural Works for Development of Columbarium,
Crematorium and Related Facilities at Sandy Ridge Cemetery
|
Monthly
EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html
|
|
|
|
|
|
|
FEP-01/534/2017
|
Site Formation and Associated
Infrastructural Works for Development of Columbarium, Crematorium and
Related Facilities at Sandy Ridge Cemetery
|
Monthly
EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html
|
|
|
|
|
|
|
FEP-01/534/2017/A
|
Site Formation and
Associated Infrastructural Works for Development of Columbarium, Crematorium
and Related Facilities at Sandy Ridge Cemetery
|
Monthly
EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html
|
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
|
EP-441/2012/A
|
Enhanced Ash Utilisation and Water
Management Facilities at the Castle Peak Power Station (CPPS)
|
Monthly EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5432018_content.html
|
|
|
|
|
|
|
EP-507/2016/C
|
Installation of One additional gas-fired generation unit (CCGT Unit
No. 1) at the Black Point Power Station
|
Environmental Monitoring and Audit Manual
|
https://www.epd.gov.hk/eia/english/register/index8/vep5752020_content.html
|
|
|
|
|
|
|
- Yuen Long District
|
|
|
|
|
|
|
EP-477/2013
|
Development of Lok Ma Chau Loop
|
Monthly EM&A Report
(Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html
|
|
|
|
|
|
|
EP-311/2008/E
|
Proposed
Comprehensive Development at Wo Shang Wai, Yuen Long
|
Monthly
EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5382017_content.html
|
|
|
|
|
|
|
EP-565/2019
|
Yuen Long
Effluent Polishing Plant
|
Monthly
EM&A Report(Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5652019_content.html
|
|
|
|
|
|
|
EP-565/2019
|
Yuen Long
Effluent Polishing Plant
|
Quarterly
EM&A Summary Report(Apr 2021 to Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5652019_content.html
|
|
|
|
|
|
|
EP-464/2013
|
Expansion of Ha Tsuen Sewage Pumping Station
|
Monthly EM&A Report
(Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4642013_content.html
|
|
|
|
|
|
|
EP-464/2013
|
Expansion of Ha Tsuen Sewage Pumping Station
|
Monthly EM&A Report
(Aug 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4642013_content.html
|
|
|
|
|
|
|
- Kwai Tsing District
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Jul 2021)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
- Central & Western District
|
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation
Phase III
|
Quarterly EM&A
Report (May 2021 to Jul 2021) (HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads
which are classified as primary/district distributor roads
|
Quarterly
EM&A Report (May 2021 to Jul 2021) (HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Jul 2021)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Jul 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai
East(CWB Tunnel)
|
Monthly EM&A Report (Jul 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central - Wanchai Bypass Tunnel (North
Point Section) and Island Eastern Corridor Link
|
Monthly EM&A Report (Jul 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (May 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai
East(CWB Tunnel)
|
Monthly EM&A Report (May 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass - Central
Interchange (Contract No. HY/2009/15)
|
Monthly EM&A Report (May 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central - Wanchai Bypass Tunnel (North
Point Section) and Island Eastern Corridor Link
|
Monthly EM&A Report (May 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai
West (Contract No. HY/2010/08) - Tunnel Work
|
Monthly EM&A Report (May 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link - Hung Hom to Admiralty Section
|
Monthly EM&A Report (Jul 2021)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
FEP-13/364/2009/H
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html
|
|
|
|
|
|
|
- Wan Chai District
|
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation
Phase III
|
Quarterly EM&A
Report (May 2021 to Jul 2021) (HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
|
FEP-03/376/2009
|
DP2-Road P2 and other roads which are classified as primary/district
distributor roads
|
Monthly EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1982020_content.html
|
|
|
|
|
|
|
EP-436/2012/F
|
Shatin to Central Link - Hung Hom to Admiralty Section
|
Monthly EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html
|
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads
which are classified as primary/district distributor roads
|
Quarterly
EM&A Report (May 2021 to Jul 2021) (HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Jul 2021)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link - Hung Hom to Admiralty Section
|
Monthly EM&A Report (Jul 2021)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
FEP-13/364/2009/H
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html
|
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Jul 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai
East(CWB Tunnel)
|
Monthly EM&A Report (Jul 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central - Wanchai Bypass Tunnel (North
Point Section) and Island Eastern Corridor Link
|
Monthly EM&A Report (Jul 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (May 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai
East(CWB Tunnel)
|
Monthly EM&A Report (May 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass - Central
Interchange (Contract No. HY/2009/15)
|
Monthly EM&A Report (May 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central - Wanchai Bypass Tunnel (North
Point Section) and Island Eastern Corridor Link
|
Monthly EM&A Report (May 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai
West (Contract No. HY/2010/08) - Tunnel Work
|
Monthly EM&A Report (May 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
|
- Eastern District
|
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation
Phase III
|
Quarterly EM&A
Report (May 2021 to Jul 2021) (HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Jul 2021)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other
roads which are classified as primary/district distributor roads
|
Quarterly
EM&A Report (May 2021 to Jul 2021) (HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04
- Cha Kwo Ling
|
Monthly EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link - Hung Hom to Admiralty Section
|
Monthly EM&A Report (Jul 2021)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
FEP-13/364/2009/H
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html
|
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Jul 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai
East(CWB Tunnel)
|
Monthly EM&A Report (Jul 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central - Wanchai Bypass Tunnel (North
Point Section) and Island Eastern Corridor Link
|
Monthly EM&A Report (Jul 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (May 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai
East(CWB Tunnel)
|
Monthly EM&A Report (May 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass - Central
Interchange (Contract No. HY/2009/15)
|
Monthly EM&A Report (May 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central - Wanchai Bypass Tunnel (North
Point Section) and Island Eastern Corridor Link
|
Monthly EM&A Report (May 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai
West (Contract No. HY/2010/08) - Tunnel Work
|
Monthly EM&A Report (May 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
|
- Southern District
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Jul 2021)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
EP-537/2017
|
Proposed Extension of Academic Block, The Swire Institute
of Marine Science, Faculty of Science, The University of Hong Kong, Cape D’Aguilar Road, Shek O
|
Monthly EM&A Report No.46
|
http://www.epd.gov.hk/eia/english/register/aep/ep5372017_content.html
|
|
|
|
|
|
|
EP-487/2014/A
|
Tai Shue Wan Development at
Ocean Park
|
Monthly EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html
|
|
|
|
|
|
|
EP-487/2014/A
|
Tai Shue Wan Development at
Ocean Park
|
Quarterly EM&A
Report (Jun 2021 to Aug 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html
|
|
|
|
|
|
|
EP-487/2014/A
|
Tai Shue Wan Development at
Ocean Park
|
Monthly
EM&A Report (Aug 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link - Hung Hom to Admiralty Section
|
Monthly EM&A Report (Jul 2021)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04
- Cha Kwo Ling
|
Monthly EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
|
- Kowloon City District
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads
Serving the Planned Kai Tak Development
|
Monthly
EM&A Report (Jul 2021)
(ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New
Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly
EM&A Report (Jul 2021) (ED/2018/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads
Serving the Planned Kai Tak Development
|
Monthly
EM&A Report (Jul 2021)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads
Serving the Planned Kai Tak Development
|
Quarterly EM&A
Report (Jan 2021 to Mar 2021)(ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads
Serving the Planned Kai Tak Development
|
Monthly EM&A Report
(Mar 2021)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads
Serving the Planned Kai Tak Development
|
Monthly EM&A Report
(Jun 2021)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads
Serving the Planned Kai Tak Development
|
Monthly EM&A Report
(Jul 2021)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-339/2009/A
|
Decommissioning
of the Remaining Parts (EX_GFS Building, Radar Station and Hong Kong
Aviation Club) of the Former Kai Tak Airport
|
Monthly
EM&A Report (Mar 2021)(KL/2014/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
|
|
EP-451/2013
|
Trunk Road T2
|
Monthly EM&A Report (Mar
2021)(KL/2014/03)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
|
|
|
|
|
|
|
EP-445/2013/A
|
Kai Tak
Development – Roads D3A & D4A
|
Quarterly EM&A
Report (Jan 2021 to Mar 2021)(ED/2018/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
|
|
|
EP-445/2013/A
|
Kai Tak
Development – Roads D3A & D4A
|
Monthly EM&A Report
(Jun 2021)(KL/2014/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
|
|
|
EP-445/2013/A
|
Kai Tak
Development – Roads D3A & D4A
|
Monthly EM&A Report
(Jul 2021)(KL/2014/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
|
|
|
EP-451/2013
|
Trunk Road T2
|
Monthly
EM&A Report (Jul 2021)(ED/2018/04)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
|
|
|
|
|
|
|
EP-445/2013/A
|
Kai Tak
Development – Roads D3A & D4A
|
Monthly EM&A Report
(Jul
2021) (ED/2018/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
|
|
|
EP-445/2013/A
|
Kai Tak
Development – Roads D3A & D4A
|
Monthly EM&A Report
(Jul 2021) (ED/2018/05)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
|
|
|
EP-563/2018
|
The Development
of AFCD Animal Management and Animal Welfare Building Complex in Kai Tak Development
|
Monthly
Audit Report No. 10
|
https://www.epd.gov.hk/eia/english/register/aep/ep5632018_content.html
|
|
|
|
|
|
|
FEP-02/457/2013/C
|
Central
Kowloon Route - Yau Ma Tei
East (HY/2014/08)
|
Monthly
EM&A Report (Jul 2021)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html
|
|
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon
Route - Kai Tak West (HY/2014/07)
|
Monthly
EM&A Report (Jul 2021)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central
Kowloon Route
|
Monthly
EM&A Report (Jul 2021)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central
Kowloon Route
|
Monthly
EM&A Report (Jul 2021)(HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central
Kowloon Route
|
Monthly
EM&A Report (Jul 2021)(HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon
Route
|
Monthly
EM&A Report (Jul 2021)(HY/2018/02)(Rev.2)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html
|
|
|
|
|
|
|
- Kwun Tong
District
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads
Serving the Planned Kai Tak Development
|
Monthly
EM&A Report (Jul 2021) (ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads
Serving the Planned Kai Tak Development
|
Monthly
EM&A Report (Jul 2021)
(ED/2018/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads
Serving the Planned Kai Tak Development
|
Monthly
EM&A Report (Jul 2021)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads
Serving the Planned Kai Tak Development
|
Quarterly EM&A
Report (Jan 2021 to Mar 2021)(ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads
Serving the Planned Kai Tak Development
|
Monthly EM&A Report
(Mar 2021)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads
Serving the Planned Kai Tak Development
|
Monthly EM&A Report
(Jun 2021)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads
Serving the Planned Kai Tak Development
|
Monthly EM&A Report
(Jul 2021)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-339/2009/A
|
Decommissioning
of the Remaining Parts (EX_GFS Building, Radar Station and Hong Kong
Aviation Club) of the Former Kai Tak Airport
|
Monthly
EM&A Report (Mar 2021)(KL/2014/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
|
|
EP-564/2018
|
Lei Yue Mun Waterfront
Enhancement Project
|
Monthly
EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5642018_content.html
|
|
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East (HY/2014/08)
|
Monthly EM&A Report (Jul 2021)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html
|
|
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak West
(HY/2014/07)
|
Monthly EM&A Report (Jul 2021)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report (Jul 2021)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report (Jul 2021)(HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report (Jul 2021)(HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report (Jul 2021)(HY/2018/02)(Rev.2)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04
- Cha Kwo Ling
|
Monthly EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
|
- Sham Shui Po District
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Jul 2021)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
- Wong Tai Sin District
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak
Development
|
Monthly
EM&A Report (Jul 2021) (ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads
Serving the Planned Kai Tak Development
|
Monthly
EM&A Report (Jul 2021) (ED/2018/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads
Serving the Planned Kai Tak Development
|
Monthly
EM&A Report (Jul 2021)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads
Serving the Planned Kai Tak Development
|
Quarterly
EM&A Report (Jan 2021 to Mar 2021)(ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads
Serving the Planned Kai Tak Development
|
Monthly
EM&A Report (Mar 2021)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads
Serving the Planned Kai Tak Development
|
Monthly
EM&A Report (Jun 2021)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads
Serving the Planned Kai Tak Development
|
Monthly
EM&A Report (Jul 2021)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-339/2009/A
|
Decommissioning
of the Remaining Parts (EX_GFS Building, Radar Station and Hong Kong
Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (Mar 2021)(KL/2014/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
|
|
- Yau
Tsim Mong District
|
|
|
|
|
|
|
EP-453/2013/B
|
Underpass Road and
Austin Road Flyover Serving the West Kowloon Cultural District
|
Monthly EM&A Report
(Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html
|
|
|
|
|
|
|
EP-523/2016
|
Proposed Sewage Pumping Station and Dry Weather Flow Interceptor at
Cherry Street Box Culvert
|
Submission of Monthly EM&A Report No.43
|
https://www.epd.gov.hk/eia/english/register/aep/ep5232016_content.html
|
|
|
|
|
|
|
EP-436/2012/F
|
Shatin to Central Link - Hung Hom to Admiralty Section
|
Monthly EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html
|
|
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East (HY/2014/08)
|
Monthly EM&A Report (Jul 2021)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html
|
|
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak West
(HY/2014/07)
|
Monthly EM&A Report (Jul 2021)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link - Hung Hom to Admiralty Section
|
Monthly EM&A Report (Jul 2021)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report (Jul 2021)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report (Jul 2021)(HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report (Jul 2021)(HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report (Jul 2021)(HY/2018/02)(Rev.2)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html
|
|
|
|
|
|
|
|
|
|
|
|
|
|