|
Project List:
- A
- B
- C
- D
- E
- F
- G
- H
- I
- J
- K
- L
- M
- N
- O
- P
- Q
- R
- S
- T
- U
- V
- W
- X
- Y
- Z
- 0-9
R |
|
- Railway Development Study Phase II (Part 1) Tai Wai to Ma On Shan KCR Extension to Tsim Sha Tsui Environmental Feasibility Studies
- Reclamation & Servicing of Tuen Mun Area 38 for Special Industries
- Reclamation and Servicing of Tuen Mun Area 38 for Special Industries - Improvement to Roads and Junctions within Tuen Mun
- Reclamation at Lung Kwu Tan
- Reclamation for Kau Yi Chau Artificial Islands
- Reclamation of Sai Wan Typhoon Shelter and Associated Engineering Works at Cheung Chau
- Reclamation Works for District Open Space and GIC Facilities in North Tsing Yi
- Reconstruction of Pak Sha Wan public pier Sai Kung
- Reconstruction of Sham Chung Public Pier, Sai Kung North, Tai Po
- Reconstruction of Wong Shek Public Pier, Sai Kung North, Tai Po
- Regulation of Shenzhen River Stage IV
- Relocation of Diamond Hill Fresh Water and Salt Water Service Reservoirs to Caverns
- Relocation of Tsuen Wan No. 2 Fresh Water Service Reservoir to Caverns
- Relocation of Yau Tong Group Fresh Water and Salt Water Service Reservoirs to Caverns
- Relocation of Yiu Lian Floating Dock No. 3
- Remaining Development in Tung Chung and Tai Ho - Comprehensive Feasibility Study - Environmental Impact Assessment
- Remaining Phase Development of the New Territories North (NTN) - NTN New Town and Man Kam To
- Removal of 132kV Overhead Line and Pylons for B-Line and W-Line
- Removal of 132kV Overhead Line and Pylons for P-Line
- Removal of Sediment in Lo Tik Wan, Sok Kwu Wan and Cheung Sha Wan Fish Culture Zones
- Removal of Sediment in Sham Wan and Kau Sai Fish Culture Zones
- Removal of Temporary Rock Bund from Existing Seabed at Ha Pak Nai
- Renewable Energy by a Wind Turbine System on Lamma Island
- Renewable Energy Supply on Town Island (also known as Dawn Island)
- Renovation Project for Tin Hau Temple in Causeway Bay
- Replacement of Cremators at Fu Shan Crematorium in Shatin
- Replacement of the Existing 11KV Submarine Cable Circuit Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O
- Repositioning and Long Term Operation Plan of Ocean Park
- Reprovision of Bridges D1 and T in West Kowloon
- Re-provision of Open Cycle Gas Turbines at Lamma Power Station
- Reprovisioning and Upgrading of Salt Water Service Reservoirs in Western District for Water Supplies Department
- Reprovisioning of Diamond Hill Crematorium
- Reprovisioning of FEHD Sai Yee Street Vehicle Depot at Yen Ming Road, West Kowloon Reclamation Area
- Restoration of North-West New Territories Landfills
- Restoration to Chik Kwai Study Hall, Sheung Tsuen, Pat Heung, Yuen Long
- Restoration to Tang Ancestral Hall and its adjoining buildings at Ha Tsuen, Yuen Long, N.T.
- Restoration to Yan Tun Kong Study Hall at Ping Shan, Yuen Long, New Territories
- Reuse of Treated Effluent from Ngong Ping Sewage Treatement Plant for Toilet Flushing
- Reuse of Treated Sewage Effluent from a Treatment Plant at Hong Kong Vipassana Meditation Centre, Lantau Island
- Reuse of Treated Sewage Effluent from a Treatment Plant at Mount Pavilia, Sai Kung
- Reuse of Treated Sewage Effluent from Redeveloped Lo Wu Correctional Institution
- Reuse of Treated Wastewater for Cooling Tower make up in Planned Food Factory at No. 3 Dai Shun Street Tai Po Industrial Estate
- Revised Austin Road Flyover
- Revised Trunk Road T4 in Sha Tin
- Revitalisation of Fo Tan Nullah
- Revitalisation of Tai Wai Nullah
- Road P1 Advance Works at Yam O on Lantau Island
- Road P1 (Tai Ho - Sunny Bay Section), Lantau
- Road Widening of Hing Wah Street
- Road Works at West Kowloon
- Roadside Slope Improvement Works along Ma On Shan Tsuen Road within Ma On Shan Country Park
- Rock Hill Street Extension
- Route 10 - Hong Kong Lantau Link - Environmental Impact Assessment
- Route 10 - North Lantau to Yuen Long Highway Investigation and Preliminary Design (Southern Section)
- Route 3 Country Park Section and Ting Kau Bridge - Preliminary Design Stage 2 - Tai Lam Tunnel & Yuen Long Approach Road
- Route 3 Country Park Section and Ting Kau Bridge - Preliminary Design Stage 2 Country Park Section - Ting Kau Bridge
- Route 3 Tai Lam Tunnel & Yuen Long Approach - Southern SectionThe Main Line Conveyor System
- Route 3 Tai Lam Tunnel & Yuen Long Approach Northern Section
- Route 5 Section Between Shek Wai Kok and Chai Wan Kok
- Route 9 between Tsing Yi and Cheung Sha Wan
- Route 11 (Section between Yuen Long and North Lantau)
- Route 16 Investigation Assignment from West Kowloon to Sha Tin - Alternative Alignment Environmental Impact Assessment
- RPIS Minor Rural Improvement Works Package 5, SK-076 Improvement of Lung Mei Tsuen Road, Sai Kung
- Rural Drainage Rehabilitation Scheme Stage 2 Phase 3 - Mo Fan Heung Stream Rehabilitation
|
|
|
|