Summary of Exceedances
5.1
In the reporting quarter, all the 1-hr TSP and noise
monitoring results complied with the
Review of the Reasons for and the
Implications of Non-compliance
5.2
The 24-hr TSP action and limit level exceedances recorded at MA1 in October were concluded mainly due
to poor ambient air quality.
5.3
There were no marine works conducted at Sham Tseng
Reclamation Site in the reporting quarter. Therefore, all the exceedances were considered not related to the reclamation
works and they were likely due to concurrent marine activities nearby, natural
fluctuation of water body, poor ambient water quality and local impacts.
5.4
Interim notifications had been issued for the exceedances in the reporting quarter to inform the EPD,
AFCD, ER, IC(E) and the Contractor about the
incidents.