Action and Limit Levels for Air Quality

 

Action and Limit Levels for 1-Hour TSP

 

Location

Action Level, mg/m3

Limit Level, mg/m3

MA1

425

500

MA2

412

MA3

424

MA4

425

MA5

428

 

Action and Limit Levels for 24-Hour TSP

 

Location

Action Level, mg/m3

Limit Level, mg/m3

MA1

166

260

MA2

156

MA3

154

MA4

149

MA5

151

 


Action and Limit Levels for Noise

 

                  Time Period

Action

            Limit

0700-1900 hrs on normal weekdays

When one documented complaint is received

 

75*dB(A)

0900-1900 hrs on general holiday including Sundays & 1900-2100 hrs on any day not being a general holiday

60dB(A)

*           Reduce to 70dB(A) for schools and 65dB(A) during school examination periods

 

 

Day-Time Baseline Noise Level

 

Daytime

0700-1900 hrs on normal weekdays

Range of Noise Levels, dB(A)

Leq

L10

L90

MN1

63.3

(53.6 – 71.1)

65.1

(54.4 – 74.4)

61.3

(52.3 – 68.8)

MN2

70.2

(60.0 – 80.2)

72.5

(63.2 – 85.9)

66.4

(54.0 – 71.5)

MN3

69.0

(66.1 – 73.7)

71.4

(68.3 – 75.2)

65.9

(62.6 – 71.6)

MN4

66.4

(63.2 – 72.1)

68.4

(64.9 – 75.3)

63.3

(60.7 – 70.4)

MN5

60.9

(56.6 – 71.5)

63.7

(58.9 – 75.4)

55.4

(51.1 – 69.4)

MN6

61.0

(56.0 – 72.5)

63.8

(58.2 – 75.5)

56.3

(51.6 – 69.4)

MN7

56.1

(39.6 – 66.0)

59.6

(40.6 – 69.2)

47.0

(33.1 – 57.5)

MN8

59.8

(49.0 – 72.3)

62.5

(50.0 – 74.9)

55.8

(48.0 – 68.2)

MN9

67.7

(58.4 – 74.1)

71.7

(60.4 – 77.9)

55.8

(46.8 – 68.4)

MN10

71.9

(68.9 – 77.2)

75.5

(72.4 – 81.0)

58.0

(54.2 – 58.0)

 


Evening-Time Baseline Noise Level

 

Evening Time

0700-2300 hrs on holidays; and 19:00-23:00 hrs on  all other days

Range of Noise Levels, dB(A)

Leq

L10

L90

MN1

61.3

(51.4 – 71.1)

63.0

(53.2 – 75.2)

59.0

(48.4 – 66.7)

MN2

66.5

(57.2 – 74.4)

69.0

(59.0 – 75.7)

61.8

(36.8 – 68.6)

MN3

66.7

(64.0 – 72.0)

69.2

(65.8 -  74.9)

63.5

(60.6 – 69.4)

MN4

63.3

(61.2 – 71.4)

65.0

(62.5 – 72.0)

61.0

(59.5 – 70.5)

MN5

57.0

(50.9 – 71.6)

58.5

(53.2 – 74.0)

52.5

(47.0 – 69.0)

MN6

56.8

(52.4 – 72.5)

58.6

(53.7 – 75.0)

53.4

(49.6 – 69.2)

MN7

56.7

(38.9 – 70.7)

60.1

(41.4 – 75.0)

49.2

(33.4 – 62.6)

MN8

58.9

(50.1 – 68.4)

61.3

(51.1 – 76.3)

54.3

(48.0 – 67.0)

MN9

66.1

(48.1 – 73.7)

70.5

(49.0 – 76.5)

54.0

(46.0 – 69.5)

MN10

61.3

(55.9 – 78.9)

63.5

(58.1 – 81.3)

56.9

(51.8 – 75.6)

 

Night-Time Baseline Noise Level

 

Night Time

2300-07:00 hrs

of next  days

Range of Noise Levels, dB(A)

Leq

L10

L90

MN1

64.0

(50.6 – 74.9)

65.6

(52.2 – 78.7)

61.9

(48.0 – 71.7)

MN2

62.6

(55.1 – 76.4)

65.5

(57.0 – 76.5)

56.5

(50.5 – 73.5)

MN3

61.6

(57.2 – 68.5)

64.4

(58.6 – 72.3)

57.3

(54.6 – 64.1)

MN4

61.4

(59.4 – 70.6)

62.5

(60.0 – 72.0)

60.0

(58.5 – 69.5)

MN5

54.2

(46.3 – 77.2)

56.0

(48.7 – 78.0)

48.5

(43.0 – 71.0)

MN6

54.2

(46.3 – 77.2)

56.3

(48.7 – 78.0)

50.9

(43.2 – 73.8)

MN7

56.7

(38.7 – 70.6)

60.2

(40.9 – 75.3)

48.3

(32.6 – 61.7)

MN8

58.5

(47.5 – 70.9)

60.2

(48.4 – 71.9)

55.5

(45.4 – 68.3)

MN9

64.4

(54.7 – 72.6)

68.5

(52.5 – 77.5)

51.5

(44.5 – 66.5)

MN10

58.1

(50.6 – 79.3)

60.8

(52.9 – 82.2)

53.0

(46.8 – 75.8)

 


Action and Limit Levels for Water Quality

 

Calculated Action and Limit Levels (Ebb Tide)

Monitoring Station

Upstream Control Station

DO,

Surface & Middle

(mg/L)

DO,

Bottom

(mg/L)

Turbidity

(NTU)

SS

(mg/L)

Ebb

Action

Limit

Action

Limit

Action

Limit

Action

Limit

MW1

MC1

3.88

3.29

3.90

3.35

13.29

or 120% of upstream control station's Tby at the same tide of the same day

18.37

or 130% of upstream control station's Tby at the same tide of the same day

11.5

or 120% of upstream control station's SS at the same tide of the same day

20.0

or 130% of upstream control station's SS at the same tide of the same day

MW2

MW3

MW4

MW5

MW6

WFCZF1

4.91

4.24

4.66

4.03

16.70

23.12

13.1

14.1

Notes:

·         All the figures given in the table are used for reference only and the EPD may amend the figures whenever it is considered necessary.

 

Calculated Action and Limit Levels (Flood Tide)

Monitoring Station

Upstream Control Station

DO,

Surface & Middle

(mg/L)

DO,

Bottom

(mg/L)

Turbidity

(NTU)

SS

(mg/L)

Flood

Action

Limit

Action

Limit

Action

Limit

Action

Limit

MW1

Nil

5.20

4.72

5.00

4.65

14.55

or 120% of upstream control station's Tby at the same tide of the same day

28.86

or 130% of upstream control station's Tby at the same tide of the same day

18.6

or 120% of upstream control station's SS at the same tide of the same day

23.4

or 130% of upstream control station's SS at the same tide of the same day

MW2

MW3

11.50

12.80

9.9

11.5

MW4

MW5

MR5

14.55

28.86

18.6

23.4

MW6

MR6

WFCZF1

Nil

5.01

5.00

4.69

4.55

20.07

21.61

17.1

18.1

Notes:      All the figures given in the table are used for reference only and the EPD may amend the figures whenever it is considered necessary.