Environmental
Mitigation Implementation Schedule
Environmental Protection
Measures |
Timing |
Implementation Stages |
|||
Aug 06 |
Sep 06 |
Oct 06 |
Nov 06 |
||
Construction Air Quality |
|
|
|
|
|
Twice daily watering |
All unpaved haul roads, bulldozed material, exposed
site areas |
b |
b |
b |
N/A |
Collection of dust through a fabric filter |
Concrete batching plants |
N/A |
N/A |
N/A |
N/A |
Include contract clauses for environmental
protection |
All areas |
b |
b |
b |
N/A |
Construction Noise |
|
|
|
|
|
Noisy equipment and activities should be sited by
the Contractor as far away from sensitive receivers as is practical |
All areas |
b |
b |
b |
N/A |
Replace noisy plant with quieter alternatives |
All areas |
b |
b |
b |
N/A |
Hand held breakers to comply with EEC Technical
Directive 84/537 |
All areas of road removal |
b |
b |
b |
N/A |
Portable compressors to comply with EEC Technical
Directive 84/533 |
Work yards, all areas where pile cap, column
superstructure, surfacing and retaining wall works are underway |
b |
b |
b |
N/A |
Idle equipment should be turned off or throttled
down |
All areas |
b |
b |
b |
N/A |
Quieter power units of stationary and earth moving
plant with partial or full enclosures or vibratory isolation |
All areas |
b |
b |
b |
N/A |
Properly maintain powered mechanical equipment |
All areas |
b |
b |
b |
N/A |
Use temporary noise barriers or earth embankments
where practicable. Details of the type, length, height and material shall be
submitted to DEP for agreement no later than 1 month before construction.
Surface density of portable barriers should not be less than |
All areas |
b |
b |
b |
N/A |
Schedule noisy activities to reduce duration and
severity of noise |
All areas |
b |
b |
b |
N/A |
Shield prefabrication and concrete batching for SR4 |
Western workyard |
N/A |
N/A |
N/A |
N/A |
Design details (length, height, material and type)
of portable noise barrier of the Castle Peak Road Improvement Project shall
be submitted to EPD no later than 1 month before commencement of construction
of the project. The portable barriers shall have a surface density of not
less than |
All areas |
b |
b |
b |
N/A |
For each stage of the work specified in Section 2.1
of the Project Profile, submitted on 16 February 2001, only 1 set of the
equipment as specified in Table 1 of the Project Profile shall be used at the
same time |
Sham Tseng East Reclamation |
N/A |
N/A |
N/A |
N/A |
All plant and equipment to be used on the
construction site shall be properly maintained in good operating condition.
Silencers, mufflers, acoustic linings or shields, acoustic sheds or screens
shall be used to avoid disturbance to any nearby noise sensitive receivers |
Sham Tseng East Reclamation |
N/A |
N/A |
N/A |
N/A |
Include contract clauses for environmental
protection |
All areas |
b |
b |
b |
N/A |
Construction Water Quality |
|
|
|
|
|
Bund all active work areas to 110% capacity |
All areas |
b |
b |
b |
b |
Obtain discharge consent |
Site offices |
b |
b |
b |
b |
Direct drainage as far away as possible from
sensitive areas |
All areas |
b |
b |
b |
b |
Provide proper sewage treatment and disposal
facilities in the form of chemical toilets for site workers |
All areas |
b |
b |
b |
b |
Undertake works close to beaches outside the
designated bathing seasons |
All areas |
b |
b |
b |
b |
Include contract specifications for environmental
protection |
All areas |
b |
b |
b |
b |
All design and construction measures described in
the submission approved or deposited under conditions 2.1, 2.2, 2.3 and 2.4
of the Environmental Permit AEP-095/2001 shall be fully implemented. |
All areas |
b |
b |
b |
b |
Dredging of marine sediment shall be limited to the
scour apron |
Sham Tseng East Reclamation |
N/A |
N/A |
N/A |
N/A |
No more than 1 derrick lighter shall be used for
marine dredging works. The total maximum dredging rate shall not be more than
|
Sham Tseng East Reclamation |
N/A |
N/A |
N/A |
N/A |
All filling activities shall be carried out behind
rockfill and rock armour |
Sham Tseng East Reclamation |
N/A |
N/A |
N/A |
N/A |
Tightly closed grabs shall be used to restrict the
loss of fine sediment to suspension |
Sham Tseng East Reclamation |
N/A |
N/A |
N/A |
N/A |
Silt curtains shall be used along the reclamation
area during construction to control sediment suspension within the work area |
Sham Tseng East Reclamation |
N/A |
N/A |
N/A |
N/A |
The construction method specified in Section 2.1 of
the Project Profile submitted on 16 February 2001 shall be followed during
the construction |
Sham Tseng East Reclamation |
N/A |
N/A |
N/A |
N/A |
Surface run-off from the Castle Peak Road
Improvement Project sites shall be directed into adequately designed sand/silt
removal facilities such as sand traps, silt traps and sediment basins before
discharge into storm drains. Channels, earth bunds or sand bag barriers shall
be provided on site to properly direct stormwater to such silt removal
facilities |
All areas |
@ |
@ |
@ |
b |
Catchpits and perimeter channels shall be
constructed in advance of site formation works and earthworks of Castle Peak
Road Improvement Project |
All areas |
b |
b |
b |
b |
Silt removal facilities, channels and manholes of
the Castle Peak Road Improvement Project shall be suitably maintained. The
deposited silt and grit shall be removed at least once per week, and at the
onset of and after each rainstorm to ensure that these facilities of the
Castle Peak Road Improvement Project are functioning at all times |
All areas |
@ |
@ |
@ |
b |
Open stockpiles of construction material (e.g.
Aggregates and sand) on the work sites for the Castle Peak Road Improvement
Project shall be covered with tarpaulin or similar fabric during rainstorms.
Such measures as providing sand barriers shall be taken to prevent the
washing away of construction material, soil silt and debris into any drainage
channel. |
All areas |
b |
b |
b |
@ |
All manholes (including any newly constructed ones)
of the Castle Peak Road Improvement Project shall be adequately covered and
temporarily sealed so as to prevent silt, construction materials or debris
from getting into the drainage system |
All areas |
b |
b |
b |
b |
A marine water quality and audit programme shall be
carried out during the construction stage. One monitoring station shall be
located at the |
All areas |
b |
b |
b |
b |
Construction Waste |
|
|
|
|
|
Segregate different categories of waste |
All areas |
b |
b |
b |
N/A |
Use as much excavated spoil on site as possible |
All areas |
b |
b |
b |
N/A |
Register chemical and maintenance wastes |
All areas |
b |
b |
b |
N/A |
Bund chemical material storage areas to 120%
capacity |
Works yards |
b |
b |
b |
N/A |
Do not connect chemical material storage areas to
the foul or stormwater drainage system |
Works yards |
b |
b |
b |
N/A |
Store and label dangerous goods |
All areas |
b |
b |
b |
N/A |
Pack dangerous goods suitably to prevent leakage
during transportation |
All areas |
b |
b |
b |
NA |
Prevent disposal of hazardous materials to air,
soil, water bodies |
All areas |
b |
@ |
@ |
N/A |
Provide refuse containers at all work areas |
All areas |
@ |
@ |
@ |
N/A |
Discharge human waste into septic tanks |
All areas |
N/A |
N/A |
N/A |
N/A |
Landscape and Visual |
|
|
|
|
|
Off-site planting works to ameliorate landscape and
visual impacts |
All areas |
b |
b |
b |
N/A |
Semi-ornamental planting to provide a coordinated
streetscape and interface with road junctions |
Urban areas |
N/A |
N/A |
N/A |
N/A |
Verge planting to enhance the view from the road
and soften the overall appearance of the route |
All areas |
N/A |
N/A |
N/A |
N/A |
Woodland hydroseeding |
Slopes |
b |
b |
b |
N/A |
Screen planting |
Shortcrete areas |
N/A |
N/A |
N/A |
N/A |
Edge planting |
Exposed rock slopes |
N/A |
N/A |
N/A |
N/A |