Date |
Monitoring Location |
Tide Mode |
Measured Value (NTU) |
Action Level* (NTU) |
Limit Level* (NTU) |
Possible Reason(s) for the Exceedance |
Action taken/ to be taken |
Remarks |
Nil |
Nil |
Nil |
Nil |
Nil |
Nil |
Nil |
Nil |
Nil |
Date |
Monitoring
Location |
Tide Mode |
Measured Value
(mg/L) |
Action Level (mg/L) |
Limit Level (mg/L) |
Possible
Reason(s) for the Exceedance |
Action taken/ to
be taken |
Remarks |
11/4 |
MW5 MW6 |
Mid-Flood |
5.11 5.02 (Surface & Middle) |
5.20 (Surface & Middle) |
4.72 (Surface & Middle) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedances
were considered not due to the Project. Exceedances might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/4 |
WFCZF1 |
Mid-Flood |
4.81 (Surface & Middle) |
5.01 (Surface & Middle) |
5.00 (Surface & Middle) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/7 |
MW1 MW5 MW6 |
Mid-Flood |
5.19 5.14 5.02 (Surface & Middle) |
5.20 (Surface & Middle) |
4.72 (Surface & Middle) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedances
were considered not due to the Project. Exceedances might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/9 |
WFCZF1 |
Mid-Ebb |
4.81 (Surface & Middle) |
4.91 (Surface & Middle) |
4.24 (Surface & Middle) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/9 |
MW5 MW6 |
Mid-Flood |
5.02 5.19 (Surface & Middle) |
5.20 (Surface & Middle) |
4.72 (Surface & Middle) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedances
were considered not due to the Project. Exceedances might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/11 |
MW5 |
Mid-Flood |
5.18 (Surface & Middle) |
5.20 (Surface & Middle) |
4.72 (Surface & Middle) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/16 |
MW6 |
Mid-Flood |
5.15 (Surface & Middle) |
5.20 (Surface & Middle) |
4.72 (Surface & Middle) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
|
11/18 |
MW6 |
Mid-Flood |
5.18 (Surface & Middle) |
5.20 (Surface & Middle) |
4.72 (Surface & Middle) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/18 |
WFCZF1 |
Mid-Flood |
4.97 (Surface & Middle) |
5.01 (Surface & Middle) |
5.00 (Surface & Middle) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/21 |
MW5 MW6 |
Mid-Flood |
5.11 5.02 (Surface & Middle) |
5.20 (Surface & Middle) |
4.72 (Surface & Middle) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedances
were considered not due to the Project. Exceedances might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/21 |
WFCZF1 |
Mid-Flood |
4.81 (Surface & Middle) |
5.01 (Surface & Middle) |
5.00 (Surface & Middle) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/23 |
MW5 |
Mid-Flood |
5.18 (Surface & Middle) |
5.20 (Surface & Middle) |
4.72 (Surface & Middle) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/25 |
WFCZF1 |
Mid-Ebb |
4.49 (Surface & Middle) |
4.91 (Surface & Middle) |
4.24 (Surface & Middle) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/25 |
MW3 MW5 MW6 |
Mid-Flood |
5.11 4.70 4.87 (Surface & Middle) |
5.20 (Surface & Middle) |
4.72 (Surface & Middle) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedances
were considered not due to the Project. Exceedances might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/25 |
WFCZF1 |
Mid- Flood |
4.71 (Surface & Middle) |
5.01 (Surface & Middle) |
5.00 (Surface & Middle) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/25 |
WFCZF1 |
Mid-Ebb |
4.47 (Bottom) |
4.66 (Bottom) |
4.03 (Bottom) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/25 |
MW5 |
Mid-Flood |
4.95 (Bottom) |
5.00 (Bottom) |
4.65 (Bottom) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
Date |
Monitoring
Location |
Tide Mode |
Measured Value
(mg/L) |
Action Level* (mg/L) |
Limit Level* (mg/L) |
Possible
Reason(s) for the Exceedance |
Action taken/ to
be taken |
Remarks |
11/4 |
MW1 MW2 MW3 MW4 MW6 |
Mid-Ebb |
12.25 10.75 11.33 11.33 12.33 |
11.5 or 120% of upstream control stations MC1 (8.33 x 1.2 = 9.99) |
20.0 or 130% of upstream control stations MC1 (8.33 x 1.3 = 10.82) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedances
were considered not due to the Project. Exceedances might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/4 |
MW2 |
Mid-Flood |
20.00 |
18.6 |
23.4 |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/4 |
MW3 MW4 |
Mid-Flood |
20.17 20.67 |
9.9 |
11.5 |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedances
were considered not due to the Project. Exceedances might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/4 |
MW5 |
Mid-Flood |
19.33 |
18.6 or 120% of upstream control stations MR5 (21.0 x 1.2 = 25.2) |
23.4 or 130% of upstream control stations MR5 (21.0 x 1.3 = 27.3) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/7 |
MW5 |
Mid-Flood |
10.83 |
18.6 or 120% of upstream control stations MR5 (7.67 x 1.2 = 9.20) |
23.4 or 130% of upstream control stations MR5 (7.67 x 1.3 = 9.97) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/9 |
MW3 MW4 MW6 |
Mid-Ebb |
11.67 11.50 11.33 |
11.5 or 120% of upstream control stations MC1 (8.17 x 1.2 = 9.80) |
20.0 or 130% of upstream control stations MC1 (8.17 x 1.3 = 10.62) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedances
were considered not due to the Project. Exceedances might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/9 |
MW3 MW4 |
Mid-Flood |
11.83 12.50 |
9.9 |
11.5 |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedances
were considered not due to the Project. Exceedances might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/9 |
MW5 |
Mid-Flood |
11.33 |
18.6 or 120% of upstream control stations MR5 (7.67 x 1.2 = 9.20) |
23.4 or 130% of upstream control stations MR5 (7.67 x 1.3 = 9.97) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/16 |
MW6 |
Mid-Ebb |
11.33 |
11.5 or 120% of upstream control stations MC1 (9.00 x 1.2 = 10.80) |
20.0 or 130% of upstream control stations MC1 (9.00 x 1.3 = 11.70) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/16 |
MW5 |
Mid-Flood |
15.33 |
18.6 or 120% of upstream control stations MR5 (7.67 x 1.2 = 9.20) |
23.4 or 130% of upstream control stations MR5 (7.67 x 1.3 = 9.97) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/18 |
MW4 |
Mid-Ebb |
8.00 |
11.5 or 120% of upstream control stations MC1 (4.50 x 1.2 = 5.40) |
20.0 or 130% of upstream control stations MC1 (4.50 x 1.3 = 5.85) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/21 |
MW3 |
Mid-Ebb |
6.67 |
11.5 or 120% of upstream control stations MC1 (5.17 x 1.2 = 6.20) |
20.0 or 130% of upstream control stations MC1 (5.17 x 1.3 = 6.72) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/25 |
MW3 MW4 MW5 MW6 |
Mid-Ebb |
4.67 4.00 4.67 4.50 |
11.5 or 120% of upstream control stations MC1 (3.33 x 1.2 = 3.99) |
20.0 or 130% of upstream control stations MC1 (3.33 x 1.3 = 4.32) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedances
were considered not due to the Project. Exceedances might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/25 |
WFCZF1 |
Mid-Ebb |
5.83 |
13.1 or 120% of upstream control stations MC1 (3.33 x 1.2 = 3.99) |
14.1 or 130% of upstream control stations MC1 (3.33 x 1.3 = 4.32) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/25 |
MW5 |
Mid-Flood |
6.17 |
18.6 or 120% of upstream control stations MR5 (5.00 x 1.2 = 6.00) |
23.4 or 130% of upstream control stations MR5 (5.00 x 1.3 = 6.50) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/28 |
MW1 MW2 MW3 MW4 MW5 MW6 |
Mid-Ebb |
10.50 11.50 10.00 10.33 10.83 10.33 |
11.5 or 120% of upstream control stations MC1 (8.33 x 1.2 = 9.99) |
20.0 or 130% of upstream control stations MC1 (8.33 x 1.3 = 10.82) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedances
were considered not due to the Project. Exceedances might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
11/28 |
WFCZF1 |
Mid-Ebb |
10.33 |
13.1 or 120% of upstream control stations MC1 (8.33 x 1.2 = 9.99) |
14.1 or 130% of upstream control stations MC1 (8.33 x 1.3 = 10.82) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
*Traceable to Method Statement (Marine Water Quality
Monitoring and Audit Manual), Rev. 2, Section 3.1 – 3.2