Action and Limit Levels for Water Quality

 

Calculated Action and Limit Levels (Ebb Tide)

Monitoring Station

Upstream Control Station

DO,

Surface & Middle

(mg/L)

DO,

Bottom

(mg/L)

Turbidity

(NTU)

SS

(mg/L)

Ebb

Action

Limit

Action

Limit

Action

Limit

Action

Limit

MW1

MC1

3.88

3.29

3.90

3.35

13.29

or 120% of upstream control station's Tby at the same tide of the same day

18.37

or 130% of upstream control station's Tby at the same tide of the same day

11.5

or 120% of upstream control station's SS at the same tide of the same day

20.0

or 130% of upstream control station's SS at the same tide of the same day

MW2

MW3

MW4

MW5

MW6

WFCZF1

4.91

4.24

4.66

4.03

16.70

23.12

13.1

14.1

Notes:

·         All the figures given in the table are used for reference only and the EPD may amend the figures whenever it is considered necessary.

 

Calculated Action and Limit Levels (Flood Tide)

Monitoring Station

Upstream Control Station

DO,

Surface & Middle

(mg/L)

DO,

Bottom

(mg/L)

Turbidity

(NTU)

SS

(mg/L)

Flood

Action

Limit

Action

Limit

Action

Limit

Action

Limit

MW1

Nil

5.20

4.72

5.00

4.65

14.55

or 120% of upstream control station's Tby at the same tide of the same day

28.86

or 130% of upstream control station's Tby at the same tide of the same day

18.6

or 120% of upstream control station's SS at the same tide of the same day

23.4

or 130% of upstream control station's SS at the same tide of the same day

MW2

MW3

11.50

12.80

9.9

11.5

MW4

MW5

MR5

14.55

28.86

18.6

23.4

MW6

MR6

WFCZF1

Nil

5.01

5.00

4.69

4.55

20.07

21.61

17.1

18.1

Notes:      All the figures given in the table are used for reference only and the EPD may amend the figures whenever it is considered necessary.