Date |
Monitoring Location |
Tide Mode |
Measured Value (NTU) |
Action Level* (NTU) |
Limit Level* (NTU) |
Possible Reason(s) for the Exceedance |
Action taken/ to be taken |
Remarks |
12/16 |
MW5 |
Mid-Flood |
4.15 |
14.55 or 120% of upstream control stations MR5 (3.35 x 1.2 = 4.02) |
28.86 or 130% of upstream control stations MR5 (3.35 x 1.3 = 4.36) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
Date |
Monitoring
Location |
Tide Mode |
Measured Value
(mg/L) |
Action Level (mg/L) |
Limit Level (mg/L) |
Possible
Reason(s) for the Exceedance |
Action taken/ to
be taken |
Remarks |
12/5 |
MW6 |
Mid-Flood |
5.15 (Surface & Middle) |
5.20 (Surface & Middle) |
4.72 (Surface & Middle) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
12/5 |
WFCZF1 |
Mid- Flood |
4.95 (Surface & Middle) |
5.01 (Surface & Middle) |
5.00 (Surface & Middle) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
12/23 |
WFCZF1 |
Mid-Ebb |
4.33 (Surface & Middle) |
4.91 (Surface & Middle) |
4.24 (Surface & Middle) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
12/23 |
MW1 MW3 MW4 MW5 MW6 |
Mid-Flood |
5.06 4.95 5.14 4.54 4.71 (Surface & Middle) |
5.20 (Surface & Middle) |
4.72 (Surface & Middle) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedances
were considered not due to the Project. Exceedances might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
12/23 |
WFCZF1 |
Mid- Flood |
4.55 (Surface & Middle) |
5.01 (Surface & Middle) |
5.00 (Surface & Middle) |
As there were no marine activities conducted
in the reclamation site on the day of monitoring, the exceedance was
considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
12/23 |
WFCZF1 |
Mid-Ebb |
4.31 (Bottom) |
4.66 (Bottom) |
4.03 (Bottom) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
12/23 |
MW5 MW6 |
Mid-Flood |
4.65 4.86 (Bottom) |
5.00 (Bottom) |
4.65 (Bottom) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedances
were considered not due to the Project. Exceedances might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
Date |
Monitoring
Location |
Tide Mode |
Measured Value
(mg/L) |
Action Level* (mg/L) |
Limit Level* (mg/L) |
Possible
Reason(s) for the Exceedance |
Action taken/ to
be taken |
Remarks |
12/2 |
MW5 |
Mid-Ebb |
6.83 |
11.5 or 120% of upstream control stations MC1 (5.17 x 1.2 = 6.20) |
20.0 or 130% of upstream control stations MC1 (5.17 x 1.3 = 6.72) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
12/5 |
MW3 MW4 |
Mid-Flood |
11.00 11.83 |
9.9 |
11.5 |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedances were considered not due to the Project. Exceedances might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
12/12 |
MW5 |
Mid-Ebb |
6.00 |
11.5 or 120% of upstream control stations MC1 (4.83 x 1.2 = 5.79) |
20.0 or 130% of upstream control stations MC1 (4.83 x 1.3 = 6.27) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
12/14 |
WFCZF1 |
Mid-Ebb |
10.83 |
13.1 or 120% of upstream control stations MC1 (8.83 x 1.2 = 10.59) |
14.1 or 130% of upstream control stations MC1 (8.83 x 1.3 = 11.47) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
12/16 |
MW1 MW2 MW3 MW4 MW5 MW6 |
Mid-Ebb |
5.75 5.50 7.67 7.50 4.83 5.50 |
11.5 or 120% of upstream control stations MC1 (4.00 x 1.2 = 4.80) |
20.0 or 130% of upstream control stations MC1 (4.00 x 1.3 = 5.20) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedances were
considered not due to the Project. Exceedances might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
12/16 |
WFCZF1 |
Mid-Ebb |
5.00 |
13.1 or 120% of upstream control stations MC1 (4.00 x 1.2 = 4.80) |
14.1 or 130% of upstream control stations MC1 (4.00 x 1.3 = 5.20) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
12/19 |
MW1 MW2 |
Mid-Ebb |
8.75 9.25 |
11.5 or 120% of upstream control stations MC1 (5.83 x 1.2 = 6.99) |
20.0 or 130% of upstream control stations MC1 (5.83 x 1.3 = 7.57) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedances
were considered not due to the Project. Exceedances might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
12/23 |
MW4 MW5 |
Mid-Ebb |
9.17 8.33 |
11.5 or 120% of upstream control stations MC1 (5.83 x 1.2 = 6.99) |
20.0 or 130% of upstream control stations MC1 (5.83 x 1.3 = 7.57) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedances
were considered not due to the Project. Exceedances might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
*Traceable to Method Statement (Marine Water Quality
Monitoring and Audit Manual), Rev. 2, Section 3.1 – 3.2