Date |
Monitoring Location |
Tide Mode |
Measured Value (NTU) |
Action Level* (NTU) |
Limit Level* (NTU) |
Possible Reason(s) for the Exceedance |
Action taken/ to be taken |
Remarks |
Nil |
Nil |
Nil |
Nil |
Nil |
Nil |
Nil |
Nil |
Nil |
Date |
Monitoring
Location |
Tide Mode |
Measured Value
(mg/L) |
Action Level (mg/L) |
Limit Level (mg/L) |
Possible
Reason(s) for the Exceedance |
Action taken/ to
be taken |
Remarks |
1/25 |
MW5 MW6 |
Mid-Flood |
5.01 5.18 (Surface & Middle) |
5.20 (Surface & Middle) |
4.72 (Surface & Middle) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedances
were considered not due to the Project. Exceedances might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
Date |
Monitoring
Location |
Tide Mode |
Measured Value
(mg/L) |
Action Level* (mg/L) |
Limit Level* (mg/L) |
Possible
Reason(s) for the Exceedance |
Action taken/ to
be taken |
Remarks |
1/2 |
MW5 |
Mid-Flood |
9.83 |
18.6 or 120% of upstream control stations MR5 (8.17 x 1.2 = 9.80) |
23.4 or 130% of upstream control stations MR5 (8.17 x 1.3 = 10.62) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
1/6 |
MW3 MW4 MW5 |
Mid-Ebb |
11.67 12.67 11.67 |
11.5 or 120% of upstream control stations MC1 (11.33 x 1.2 = 13.59) |
20.0 or 130% of upstream control stations MC1 (11.33 x 1.3 = 14.72) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedances
were considered not due to the Project. Exceedances might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
1/6 |
MW3 MW4 |
Mid-Flood |
10.67 10.67 |
9.9 |
11.5 |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedances were considered not due to the Project. Exceedances might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
1/11 |
MW5 |
Mid-Flood |
7.67 |
18.6 or 120% of upstream control stations MR5 (5.50 x 1.2 = 6.60) |
23.4 or 130% of upstream control stations MR5 (5.50 x 1.3 = 7.15) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
1/16 |
MW5 |
Mid-Flood |
6.83 |
18.6 or 120% of upstream control stations MR5 (5.50 x 1.2 = 6.60 ) |
23.4 or 130% of upstream control stations MR5 (5.50 x 1.3 = 7.15) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
1/16 |
MW6 |
Mid-Flood |
6.67 |
18.6 or 120% of upstream control stations MR6 (5.50 x 1.2 = 6.60) |
23.4 or 130% of upstream control stations MR6 (5.50 x 1.3 = 7.15) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
1/20 |
MW6 |
Mid-Flood |
6.50 |
18.6 or 120% of upstream control stations MR6 (5.17 x 1.2 = 6.20) |
23.4 or 130% of upstream control stations MR6 (5.17 x 1.3 = 6.72) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
1/25 |
MW3 MW4 |
Mid-Ebb |
7.50 6.50 |
11.5 or 120% of upstream control stations MC1 (4.50 x 1.2 = 5.40) |
20.0 or 130% of upstream control stations MC1 (4.50 x 1.3 = 5.85) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedances
were considered not due to the Project. Exceedances might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
1/25 |
WFCZF1 |
Mid-Ebb |
5.83 |
13.1 or 120% of upstream control stations MC1 (4.50 x 1.2 = 5.40) |
14.1 or 130% of upstream control stations MC1 (4.50 x 1.3 = 5.85) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedance
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
1/27 |
MW3 |
Mid-Ebb |
6.67 |
11.5 or 120% of upstream control stations MC1 (4.33 x 1.2 = 5.19) |
20.0 or 130% of upstream control stations MC1 (4.33 x 1.3 = 5.62) |
As there were no marine activities
conducted in the reclamation site on the day of monitoring, the exceedances
was considered not due to the Project. Exceedance might be due to: ·
Natural fluctuation of water
body |
Nil |
Nil |
*Traceable to Method Statement (Marine Water Quality
Monitoring and Audit Manual), Rev. 2, Section 3.1 – 3.2