Environmental Mitigation Implementation Schedule

 

Environmental Protection Measures

Location

Implementation Status

Apr 06

May 06

Jun 06

Air Quality

Sufficient watering

All unpaved haul roads, stockpiled material, exposed site areas, barging point

@

@

b

Truck speed below 10 km/hr

All areas

b

b

b

Watering for truck loads after removal of tarpaulin cover

Site egress

b

b

b

Provision of vehicle washing facilities

Site egress

b

b

b

Provision of road sweeper

Public road near site egress

b

b

b

A buffer zone, where any dusty materials stockpiled, loading / unloading avoided, of at least 20 m should be maintained

Between the edge of the public fill stockpiling area of the fill bank and the nearest air sensitive receivers at River Trade Terminal

b

b

b

A "truckload control zone" of an area 100 m x 100 m established, where no more than 64 vehicle-trip per hour and 704 vehicle-trip per day shall be allowed to travel to the control zone

The north-eastern corner

b

b

b

Noise

Noisy equipment and activities should be sited by the Contractor as far away from sensitive receivers as is practical

All areas

b

b

b

Replace noisy plant with quieter alternatives

All areas

b

b

b

Idle equipment should be turned off or throttled down

All areas

b

b

b

Quieten power units of stationary and earth moving plant with partial or full enclosures or vibratory isolation

All areas

b

b

b

Properly maintain powered mechanical equipment

All areas

b

b

b

Schedule noisy activities to reduce duration and severity of noise

All areas

b

b

b

Include contract clauses for environmental protection

All areas

b

b

b

Water Quality

Tipping halls enclosed with top and 3-sides to prevent spillage of material into marine water

Seafront

b

b

b

Obtain discharge license

Site offices

@

b

b

Provide proper sewage treatment and disposal facilities in the form of chemical toilets for site workers

All areas

b

b

b

Include contract specifications for environmental protection

All areas

b

b

b

Provide proper drainage for collection of surface runoff

All areas

b

b

b

Provision of buffer distance of at least 50m between stockpiles and the seafront

Along the seafront

b

b

b

Sand and silt removal facility provided for stormwater to be treated before discharge

All areas

b

b

b

Construction of open channel

Perimeter of Fill Bank

b

b

b

Regular removal of sand and silt

All channels

@

@

@

Construction Waste

Segregate different categories of waste

All areas

b

b

b

Register chemical and maintenance wastes

All areas

b

b

b

Bund chemical material storage areas to 110% capacity

All areas

b

b

b

Do not connect chemical material storage areas to the foul or stormwater drainage system

All areas

b

b

b

Store and label dangerous goods

All areas

b

b

b

Prevent disposal of hazardous materials to air, soil, water bodies

All areas

@

@

b

Provide refuse containers at all work areas

All areas

b

b

b

Human waste discharged into septic tanks or tankered away

All areas

b

b

b

Landscape and Visual

Hydroseeding or coloured geo-textile matting (dark green / brown) provided on the slopes of the fill bank as the slopes of each layer of platform are formed

Along the eastern, northern and western sides of the fill bank

b

b

b

A buffer tree planting strip consists of row of at least 3 m high native evergreen trees species with a tall habit when fully grow (e.g. Casuarina equisetifolia) planted prior to operational phase of the project

Along the site boundary facing Lung Mun Road

b

b

b

The surface colour of structures at fill bank an earthy tone with strong natural qualities in green, grey or brown colour and the use of bold colour schemes avoided

All areas

b

b

b

Maximum stockpiling height at the fill bank limited to a maximum of +40mPD

All areas

b

b

b