Site Inspection Summary

 

Inspection Information

Date:

8 June 2006

Time:

14:30

Inspection No.:

21

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow-up Observation

 

 

1.

The Contractor was reminded to remove water ponds /spray with mosquito oil to prevent mosquito breeding as soon as possible.

 

 

2.

Removal of silt accumulated inside the drainage channel had been completed.

 

 

 

 

 

New Observation

 

 

 

 

3.

Dark smoke was observed from the rock crushing plant. The Contractor was reminded to replace/repair the plant as soon as possible.

 

 

4.

Oil stain was observed beside the drip tray for the generator at Barge Loading Point 1.

 

 

5.

Oil seepage was observed during repairment of equipment. The Contractor was reminded to remove the oil stain and dispose of as chemical waste, and to place tarpaulin sheeting on ground for all future maintenance works.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

 

 


Site Inspection Summary

 

Inspection Information

Date:

13 June 2006

Time:

15:30

Inspection No.:

22

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow-up Observation

 

 

1.

The Contractor was reminded to remove water ponds /spray with mosquito oil to prevent mosquito breeding more regularly and frequently.

 

 

2.

Repairing of rock crushing plant was in progress.

 

 

3.

Oil stain was observed beside the drip tray for the generator at Barge Loading Point 1.

 

 

4.

No oil seepage and equipment repairing were observed.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

 

 


Site Inspection Summary

 

Inspection Information

Date:

20 June 2006

Time:

15:30

Inspection No.:

23

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow-up Observation

 

 

1.

The Contractor was reminded to remove water ponds /spray with mosquito oil to prevent mosquito breeding more regularly and frequently.

 

 

2.

Repairing of rock crushing plant was completed.

 

 

3.

Oil stain found beside the drip tray for the generator at Barge Loading Point 1 was removed.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

 

 


Site Inspection Summary

 

Inspection Information

Date:

27 June 2006

Time:

15:40

Inspection No.:

24

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow-up Observation

 

 

1.

The Contractor was reminded to remove water ponds /spray with mosquito oil to prevent mosquito breeding more regularly and frequently.

 

 

 

 

 

 

 

New Observations

 

 

1.

The Contractor was reminded to remove silt materials accumulated inside u-channel more regularly and frequently.

 

 

2.

Uncover open hole of drip trays were found at Barge Loading Point 1. The Contractor was reminded to cover/seal the open hole properly for preventing oil leakage.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks