Site Inspection Summary
Date: |
8 June 2006 |
Time: |
14:30 |
Inspection No.: |
21 |
|
Nil |
|
Follow-up Observation |
|
|
1. |
The Contractor was reminded
to remove water ponds /spray with mosquito oil to prevent mosquito breeding
as soon as possible. |
|
|
2. |
Removal of silt accumulated
inside the drainage channel had been completed. |
|
|
|
|
|
New Observation |
|
|
|
|
3. |
Dark smoke was observed
from the rock crushing plant. The Contractor was reminded to replace/repair
the plant as soon as possible. |
|
|
4. |
Oil stain was observed
beside the drip tray for the generator at Barge Loading Point 1. |
|
|
5. |
Oil seepage was observed
during repairment of equipment. The Contractor was reminded to remove the oil
stain and dispose of as chemical waste, and to place tarpaulin sheeting on
ground for all future maintenance works. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Site Inspection Summary
Date: |
13 June 2006 |
Time: |
15:30 |
Inspection No.: |
22 |
|
Nil |
|
Follow-up Observation |
|
|
1. |
The Contractor was reminded
to remove water ponds /spray with mosquito oil to prevent mosquito breeding
more regularly and frequently. |
|
|
2. |
Repairing of rock
crushing plant was in progress. |
|
|
3. |
Oil stain was observed
beside the drip tray for the generator at Barge Loading Point 1. |
|
|
4. |
No oil seepage and equipment
repairing were observed. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Site Inspection Summary
Date: |
20 June 2006 |
Time: |
15:30 |
Inspection No.: |
23 |
|
Nil |
|
Follow-up Observation |
|
|
1. |
The Contractor was reminded
to remove water ponds /spray with mosquito oil to prevent mosquito breeding
more regularly and frequently. |
|
|
2. |
Repairing of rock
crushing plant was completed. |
|
|
3. |
Oil stain found beside
the drip tray for the generator at Barge Loading Point 1 was removed. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Site Inspection Summary
Date: |
27 June 2006 |
Time: |
15:40 |
Inspection No.: |
24 |
|
Nil |
|
Follow-up Observation |
|
|
1. |
The Contractor was reminded
to remove water ponds /spray with mosquito oil to prevent mosquito breeding
more regularly and frequently. |
|
|
|
|
|
|
|
New Observations |
|
|
1. |
The Contractor was reminded
to remove silt materials accumulated inside u-channel more regularly and
frequently. |
|
|
2. |
Uncover open hole of
drip trays were found at Barge Loading Point 1. The Contractor was reminded
to cover/seal the open hole properly for preventing oil leakage. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|