Site Inspection Summary

 

Inspection Information

Date:

4 July 2006

Time:

15:30

Inspection No.:

25

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow-up Observation

 

 

1.

Removal of silt materials accumulated inside u-channel was observed.

 

 

2.

Open holes of drip trays at Barge Loading Point 1 were covered.

 

 

 

New Observations

 

 

3.

Oil drums and chemical containers placed on bare ground were observed at crushing plant area. The Contractor was reminded to store those containers in an adequate area as soon as possible.

 

 

4.

Stagnant water accumulated under the rest room at crushing plant area and inside the tires near the Contractor’s site office were observed. The Contractor was reminded to remove the water as soon as possible.

 

 

5.

Silty water discharging from the de-silting chamber near Barge Loading Point 3 was observed. The Contractor was reminded to improve the situation as soon as possible.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

 

 


Site Inspection Summary

 

Inspection Information

Date:

14 July 2006

Time:

14:40

Inspection No.:

26

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow-up Observation

 

 

1.

Oil drums and chemical containers placed on bare ground were observed at crushing plant area. The Contractor was reminded to store those containers in an adequate area as soon as possible.

 

 

2.

Stagnant water accumulated under the rest room at crushing plant area and inside the tires near the Contractor’s site office were observed. The Contractor was reminded to remove the water as soon as possible.

 

 

3.

No silty water discharged from the de-silting chamber near Barge Loading Point 3 was observed.

 

 

 

New Observation

 

 

4.

Oil seepage from repairement of excavator at Barge Loading Point 1 was observed.                        

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

 

 


Site Inspection Summary

 

Inspection Information

Date:

18 July 2006

Time:

15:00

Inspection No.:

27

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow-up Observation

 

 

1.

Oil drums and chemical containers placed on bare ground at crushing plant area were removed.

 

 

2.

Stagnant water accumulated under the rest room at crushing plant area and inside the tires near the Contractor’s site office were observed. The Contractor was reminded to remove the water as soon as possible.

 

 

3.

Oil seepage from repairement of excavator at Barge Loading Point 1 was removed.

 

 

 

New Observation

 

 

4.

Oil drum placed on bare ground was found at Barge Loading Point 1. The Contractor was reminded to provide drip tray for storing the drum properly.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

 

 


Site Inspection Summary

 

Inspection Information

Date:

25 July 2006

Time:

15:40

Inspection No.:

28

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow-up Observation

 

 

1.

Stagnant water accumulated under the rest room at crushing plant area and inside the tires near the Contractor’s site office were removed.

 

 

2.

Oil seepage from repairement of excavator at Barge Loading Point 1 was observed. The Contractor was reminded to remove the oil stain and dispose it as chemical waste, and to place tarpaulin sheeting on ground for all future maintenance works.

 

 

3.

Oil drum placed on bare ground was found at Barge Loading Point 1. The Contractor was reminded to store the container in an adequate area.

 

 

 

 

 

 

 

New Observation

4.

Fugitive dust generated from loading dusty material at crushing plant area was observed. The Contractor was reminded to provide water spray during dusty operation.

 

 

5.

Dark smoke emitted from crushing plant was observed. The Contractor was reminded to keep well maintain of the plant more regularly.

 

 

 

 

 

 

 

 

 

 

 

Remarks