Site Inspection Summary
Date: |
4 July 2006 |
Time: |
15:30 |
Inspection No.: |
25 |
|
Nil |
|
Follow-up Observation |
|
|
1. |
Removal of silt
materials accumulated inside u-channel was observed. |
|
|
2. |
Open holes of drip
trays at Barge Loading Point 1 were covered. |
|
|
|
New Observations |
|
|
3. |
Oil drums and chemical
containers placed on bare ground were observed at crushing plant area. The
Contractor was reminded to store those containers in an adequate area as soon
as possible. |
|
|
4. |
Stagnant water
accumulated under the rest room at crushing plant area and inside the tires
near the Contractor’s site office were observed. The Contractor was reminded
to remove the water as soon as possible. |
|
|
5. |
Silty water discharging from the de-silting chamber near Barge Loading
Point 3 was observed. The Contractor was reminded to improve the situation as
soon as possible. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Site Inspection Summary
Date: |
14 July 2006 |
Time: |
14:40 |
Inspection No.: |
26 |
|
Nil |
|
Follow-up Observation |
|
|
1. |
Oil drums and chemical
containers placed on bare ground were observed at crushing plant area. The
Contractor was reminded to store those containers in an adequate area as soon
as possible. |
|
|
2. |
Stagnant water
accumulated under the rest room at crushing plant area and inside the tires
near the Contractor’s site office were observed. The Contractor was reminded
to remove the water as soon as possible. |
|
|
3. |
No silty water discharged
from the de-silting chamber near Barge Loading Point 3 was observed. |
|
|
|
New Observation |
|
|
4. |
Oil seepage from repairement
of excavator at Barge Loading Point 1 was observed. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Site Inspection Summary
Date: |
18 July 2006 |
Time: |
15:00 |
Inspection No.: |
27 |
|
Nil |
|
Follow-up Observation |
|
|
1. |
Oil drums and chemical
containers placed on bare ground at crushing plant area were removed. |
|
|
2. |
Stagnant water
accumulated under the rest room at crushing plant area and inside the tires
near the Contractor’s site office were observed. The Contractor was reminded
to remove the water as soon as possible. |
|
|
3. |
Oil seepage from repairement
of excavator at Barge Loading Point 1 was removed. |
|
|
|
New Observation |
|
|
4. |
Oil drum placed on bare
ground was found at Barge Loading Point 1. The Contractor was reminded to
provide drip tray for storing the drum properly. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Site Inspection Summary
Date: |
25 July 2006 |
Time: |
15:40 |
Inspection No.: |
28 |
|
Nil |
|
Follow-up Observation |
|
|
1. |
Stagnant water
accumulated under the rest room at crushing plant area and inside the tires
near the Contractor’s site office were removed. |
|
|
2. |
Oil seepage from repairement
of excavator at Barge Loading Point 1 was observed. The Contractor was
reminded to remove the oil stain and dispose it as chemical waste, and to
place tarpaulin sheeting on ground for all future maintenance works. |
|
|
3. |
Oil drum placed on bare
ground was found at Barge Loading Point 1. The Contractor was reminded to
store the container in an adequate area. |
|
|
|
|
|
|
|
New Observation |
4. |
Fugitive dust generated from loading dusty material at crushing plant area was observed. The Contractor was reminded to provide water spray
during dusty operation. |
|
|
5. |
Dark smoke emitted from crushing plant was observed. The Contractor
was reminded to keep well maintain of the plant more regularly. |
|
|
|
|
|
|
|
|
|
|
|
|