6.       ENVIRONMENTAL AUDIT

Site Environmental Audit

6.1   Site audit was carried out on a weekly basis to monitor environmental issues on the construction sites to ensure that all mitigation measures were implemented timely and properly.  A summary of the site audits in the reporting period is provided in Appendix H.

Review of Environmental Monitoring Procedures

6.2               The monitoring works conducted by the monitoring team were inspected internally on a regular basis.  The following observations have been recorded for the monitoring works:

Air Quality Monitoring

·         The monitoring team recorded all observations around the monitoring station within and outside of the construction site.

·         The monitoring team recorded the temperature, air pressure and weather conditions on the monitoring day.

Water Quality Monitoring

·         The monitoring team recorded all observations around the monitoring stations, which might affect the monitoring results.

·         Major water pollution sources were identified and recorded.

Status of Environmental Licensing and permitting

6.3   All permits/licences/notifications obtained as of the reporting period are summarised in Table 6.1

 

Table 6.1      Summary of Environmental Notification, Licensing and Permit Status

 

Description

Permit No.

Date of Issue

Date of Expiry

Status

Environmental Permit

EP-210/2005

25 February 2005

-

Issued

Registration of chemical waste producer

5213-421-Y2451-01

26 January 2005

-

Registered

Water Discharge License

EP760/421/011374/I

10 May 2006

31 May 2011

Valid

Implementation Status of Environmental Mitigation Measures

6.4               Weekly site inspections were carried out on 2, 8, 15, 22 and 29 August 2006. The following observations and recommendations were made:

l             Oil drum placed on bare ground at Barge Loading Point 1 (2, 8, 15, 22  August 06);

l             Large area of oil stains were found at Barge Loading Point 1 (2, 22, 29 August 06);

l             Empty chemical containers placed on bare ground were found at Barge Loading Point 1 (8 August 06);

l             Water pondings were found within the site area (8, 15, 22, 29 August 06);

l             Dark smoke emitted from crushing plant was observed (15, 22 August 06);

l             Silty materials accumulated inside the drainage channel was observed (15, 22 August 06);

l             Fugitive dust generated from crushing plant was observed (15, 22 August 06);

l             Oil containers were found not to be used at crushing plant area (near boundary fence) (29 August 06);

l             Open stockpile was found at Tipping Hall No.2 (29 August 06);

l             Wasted chemical containers disposed in general refuse container was observed (29 August 06).

Implementation Status of Event and Action Plans

6.5               The Event and Action Plans for air quality and water quality are presented in Appendix I.

6.6               No exceedance of Action and Limit Levels for 1-hour and 24-hour TSP concentrations was recorded.

6.7               For water quality monitoring, eight exceedances (five Action and three Limit Levels) were recorded during the reporting month. All exceedances were concluded not due to the Project-works.

Implementation Status of Environmental Complaint Handling Procedures

Summary of the Complaints and Prosecutions

6.8               Appendix J presents the environmental complaint flow diagram and the complaint log of the Project.

6.9               No complaint, summon or prosecution related to environmental issues was received or made against the Project in the reporting month.