Site Inspection Summary

 

Inspection Information

Date:

2 August 2006

Time:

14:40

Inspection No.:

29

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow-up Observation

 

 

1.

Oil seepage from repairement of excavator at Barge Loading Point 1 was removed.

 

 

2.

Oil drum placed on bare ground was found at Barge Loading Point 1. The Contractor was reminded to store the container in an adequate area.

 

 

3.

No fugitive dust was observed during loading dusty material at crushing plant area.

 

 

4.

Crushing plant was under-maintenance during the inspection, no dark smoke was observed.

 

 

 

 

 

New Observation

 

 

5.

Large area of oil stains were found at Barge Loading Point 1. The Contractor was reminded to remove the stain as chemical waste properly. 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

 

 


Site Inspection Summary

 

Inspection Information

Date:

8 August 2006

Time:

15:00

Inspection No.:

30

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow-up Observations

 

 

1.

Oil drum placed on bare ground was found at Barge Loading Point 1. The Contractor was reminded to store the container in an adequate area.

 

 

2.

Large area of oil stains found at Barge Loading Point 1 was removed.

 

 

3

No dark smoke was emitted from crushing plant during operation.

 

 

 

 

 

 

 

New Observations

 

 

3.

Empty chemical containers placed on bare ground were found at Barge Loading Point 1. The Contractor was reminded to dispose them as chemical waste/ store the containers in an adequate area as soon as possible.

 

 

4.

Water pondings were found within the site area. The Contractor was reminded to remove/fill up the ponds properly.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

 

 


Site Inspection Summary

 

Inspection Information

Date:

15 August 2006

Time:

14:45

Inspection No.:

31

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow-up Observations

 

 

1.

Oil drums placed on bare ground were found at Barge Loading Point 1. The Contractor was reminded to store the containers in an adequate area as soon as possible.

 

 

2

Empty chemical containers placed on bare ground found at Barge Loading Point 1 were removed.

 

 

3

Water pondings were found within the site area. The Contractor was reminded to remove/fill up the ponds properly.

 

 

 

 

 

 

 

New Observations

 

 

4.

Dark smoke emitted from crushing plant was observed. The Contractor was reminded to keep well maintain of the plant more frequently.

 

 

5.

Silty materials accumulated inside the drainage channel was observed. The Contractor was reminded to de-silt more regularly and frequently.

 

 

6.

Fugitive dust generated from crushing plant was observed. The Contractor was reminded to provide sufficient water spaying facilities for dust suppression.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

 

 


Site Inspection Summary

 

Inspection Information

Date:

22 August 2006

Time:

15:05

Inspection No.:

32

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow-up Observations

 

 

1.

Oil drums placed on bare ground were found at Barge Loading Point 1. The Contractor was reminded to store the containers in an adequate area as soon as possible.

 

 

2.

Water pondings were found within the site area. The Contractor was reminded to remove/fill up the ponds properly.

 

 

3.

Dark smoke emitted from crushing plant was observed. The Contractor was reminded to keep well maintain of the plant more frequently.

 

 

4.

Silty materials accumulated inside the drainage channel was observed. The Contractor was reminded to de-silt more regularly and frequently.

 

 

6.

Fugitive dust generated from crushing plant was observed. The Contractor was reminded to provide sufficient water spaying facilities for dust suppression.

 

 

 

New Observations

 

 

7.

Oil stains were observed at Barge Loading Point 1 Area. The Contractor was reminded to remove it as chemical waste properly.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

 

 


Site Inspection Summary

 

Inspection Information

Date:

29 August 2006

Time:

11:00

Inspection No.:

33

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow-up Observations

 

 

1.

Oil drums placed on bare ground at Barge Loading Point 1 was stored with drip tray.

 

 

2.

Water pondings were found within the site area. The Contractor was reminded to remove/fill up the ponds properly.

 

 

3.

The crushing plant was out of served, no dark smoke was observed from crushing plant.

 

 

4.

Silty materials accumulated inside the drainage channel was removed in progress.

 

 

6.

The crushing plant was out of served, no fugitive dust was observed from crushing plant.

 

 

7.

Oil stains were observed at Barge Loading Point 1 Area. The Contractor was reminded to remove it as chemical waste properly.

 

 

 

New Observations

 

 

8.

Oil containers were found not to be used at crushing plant area (near boundary fence). The Contractor agreed to remove them as soon as possible.

 

 

9.

Open stockpile was found at Tipping Hall No.2. The Contractor was reminded to cover it properly.

 

 

10.

Wasted chemical containers disposed in general refuse container were observed. The Contractor was reminded to dispose them as chemical waste properly.

 

 

 

 

 

 

 

 

 

 

 

Remarks