Site Inspection Summary
Date: |
2 August 2006 |
Time: |
14:40 |
Inspection No.: |
29 |
|
Nil |
|
Follow-up Observation |
|
|
1. |
Oil seepage from repairement
of excavator at Barge Loading Point 1 was removed. |
|
|
2. |
Oil drum placed on bare
ground was found at Barge Loading Point 1. The Contractor was reminded to
store the container in an adequate area. |
|
|
3. |
No fugitive dust was observed during loading dusty material at crushing plant area. |
|
|
4. |
Crushing plant was under-maintenance during the inspection, no dark
smoke was observed. |
|
|
|
|
|
New Observation |
|
|
5. |
Large area of oil
stains were found at Barge Loading Point 1. The Contractor was reminded to
remove the stain as chemical waste properly. |
|
|
|
|
|
|
|
|
|
|
|
|
Site Inspection Summary
Date: |
8 August 2006 |
Time: |
15:00 |
Inspection No.: |
30 |
|
Nil |
|
Follow-up Observations |
|
|
1. |
Oil drum placed on bare
ground was found at Barge Loading Point 1. The Contractor was reminded to
store the container in an adequate area. |
|
|
2. |
Large area of oil
stains found at Barge Loading Point 1 was removed. |
|
|
3 |
No dark smoke was emitted from crushing plant during operation. |
|
|
|
|
|
|
|
New Observations |
|
|
3. |
Empty chemical
containers placed on bare ground were found at Barge Loading Point 1. The
Contractor was reminded to dispose them as chemical waste/ store the
containers in an adequate area as soon as possible. |
|
|
4. |
Water pondings were found within the site area. The Contractor was
reminded to remove/fill up the ponds properly. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Site Inspection Summary
Date: |
15 August 2006 |
Time: |
14:45 |
Inspection No.: |
31 |
|
Nil |
|
Follow-up Observations |
|
|
1. |
Oil drums placed on
bare ground were found at Barge Loading Point 1. The Contractor was reminded
to store the containers in an adequate area as soon as possible. |
|
|
2 |
Empty chemical
containers placed on bare ground found at Barge Loading Point 1 were removed.
|
|
|
3 |
Water pondings were found within the site area. The Contractor was
reminded to remove/fill up the ponds properly. |
|
|
|
|
|
|
|
New Observations |
|
|
4. |
Dark smoke emitted from
crushing plant was observed. The Contractor was reminded to keep well
maintain of the plant more frequently. |
|
|
5. |
Silty materials accumulated inside the drainage channel was observed.
The Contractor was reminded to de-silt more regularly and frequently. |
|
|
6. |
Fugitive dust generated from crushing plant was observed. The
Contractor was reminded to provide sufficient water spaying facilities for
dust suppression. |
|
|
|
|
|
|
|
|
|
|
|
|
Site Inspection Summary
Date: |
22 August 2006 |
Time: |
15:05 |
Inspection No.: |
32 |
|
Nil |
|
Follow-up Observations |
|
|
1. |
Oil drums placed on
bare ground were found at Barge Loading Point 1. The Contractor was reminded
to store the containers in an adequate area as soon as possible. |
|
|
2. |
Water pondings were found within the site area. The Contractor was
reminded to remove/fill up the ponds properly. |
|
|
3. |
Dark smoke emitted from
crushing plant was observed. The Contractor was reminded to keep well
maintain of the plant more frequently. |
|
|
4. |
Silty materials accumulated
inside the drainage channel was observed. The Contractor was reminded to
de-silt more regularly and frequently. |
|
|
6. |
Fugitive dust generated from crushing plant was observed. The
Contractor was reminded to provide sufficient water spaying facilities for
dust suppression. |
|
|
|
New Observations |
|
|
7. |
Oil stains were observed at Barge Loading Point 1 Area. The Contractor
was reminded to remove it as chemical waste properly. |
|
|
|
|
|
|
|
|
|
|
|
|
Site Inspection Summary
Date: |
29 August 2006 |
Time: |
11:00 |
Inspection No.: |
33 |
|
Nil |
|
Follow-up Observations |
|
|
1. |
Oil drums placed on
bare ground at Barge Loading Point 1 was stored with drip tray. |
|
|
2. |
Water pondings were found within the site area. The Contractor was
reminded to remove/fill up the ponds properly. |
|
|
3. |
The crushing plant was
out of served, no dark smoke was observed from crushing plant. |
|
|
4. |
Silty materials
accumulated inside the drainage channel was removed in progress. |
|
|
6. |
The crushing plant was
out of served, no fugitive dust was observed from
crushing plant. |
|
|
7. |
Oil stains were observed at Barge Loading Point 1 Area. The Contractor
was reminded to remove it as chemical waste properly. |
|
|
|
New Observations |
|
|
8. |
Oil containers were found not to be used at crushing plant area (near
boundary fence). The Contractor agreed to remove them as soon as possible. |
|
|
9. |
Open stockpile was found at Tipping Hall No.2. The Contractor was
reminded to cover it properly. |
|
|
10. |
Wasted chemical containers disposed in general refuse container were
observed. The Contractor was reminded to dispose them as chemical waste
properly. |
|
|
|
|
|
|
|
|
|
|
|
|