TABLE OF CONTENTS
Introduction
Environmental
Monitoring Works
Environmental
Licenses and Permits
Key
Information in the Reporting Quarter
Background
Project
Organizations
2. ENVIRONMENTAL
MONITORING AND AUDIT REQUIREMENTS
Monitoring
Parameters and Monitoring Locations
Monitoring
Methodology
Environmental
Quality Performance Limits (Action and Limit Levels)
Implementation
Status of Environmental Mitigation Measures
Site
Audit Summary
Status
of Waste Management
Weather
Conditions
Air
Quality
Construction
Noise
Landscape
and Visual
Influencing
Factors on the Monitoring Results
Comparison
of EM&A results with EIA predictions
4. COMMENTS,
CONCLUSIONS AND RECOMMENDATIONS
Review
of the Reasons for and the Implications of Non-compliance
Review
of Monitoring Methodology and the Practicality and Effectiveness of EM&A Programme
Effectiveness
of Mitigation Measures
Recommendations
LIST OF TABLE
Table I Summary
Table for Non-compliance Recorded in the Reporting Quarter
Table II Summary
Table for Key Information in the Reporting Quarter
Table 1.1 Key
Project Contacts
Table 2.1 Status
of Required Submissions under EP
Table 3.1 Major Noise Sources during the Monitoring in the Reporting
Period
LIST OF FIGURES
Figure 1 Layout
Plan of the Project
Figure 2 Locations
of Construction Noise Monitoring Stations
LIST OF APPENDICES
C Action
and Limit Levels for Noise
D Noise
Monitoring Results and Graphical Presentations
E Environmental
Mitigation Implementation Schedule (EMIS)
G Monthly
Summary Waste Flow Table
LIST OF ANNEXES
Annex
I Comparison of EM&A Data
and EIA Predictions