Appendix
A - Action and Limit Levels
Table A-1 Action
and Limit Levels for 1-Hour TSP
Location |
Action Level, μg/m3 |
Limit Level, μg/m3 |
A |
328 |
500 |
B |
||
C |
Table A-2 Action
and Limit Levels for 24-Hour TSP
Location |
Action Level, μg/m3 |
Limit Level, μg/m3 |
A |
196 |
260 |
B |
||
C |
Table A-3 Action
and Limit Level for Construction Noise
Period |
Action Level (2) |
Limit Level |
||
N1* |
N2* |
N3 |
||
0700-1900 hrs on normal weekdays |
When one documented complaint is received |
75 dB(A) |
70 dB(A) |
|
1900-2300 hrs on holidays & 0700-2300 hrs on all other days |
- (1) |
|||
2300-0700 hrs of next day |
- (1) |
*Free field noise levels were adjusted with a correction of +3 dB(A)
Notes:
(1) The noise limits shall be
determined by EPD during the application of the construction noise permit (CNP).
(2) Stated in
the “Environmental
Monitoring and Audit Guidelines for Development Projects in
Remarks: Referring to the fax from DSD (DSD ref.: DP/8/7070CD/DC0206/17) dated
of
Table A-4 Compliance
Level for Water Quality
Monitoring Station |
Parameters |
Limit |
W1 |
Turbidity Dissolved Oxygen pH Temperature NH4-N |
N/A > 4 mg/L < 8 30oC 20 mg/L |
W2.1, W2.2, DP1,
DP2, DP3, DP4, DP5, DP6, DP7, DP8 |
pH Temperature Suspended Solids Chemical Oxygen
Demand |
6.5 – 8.5 30oC 30 mg/L 80 mg/L |
Remarks: Referring to the fax from DSD (DSD ref.: DP/8/7070CD/DC0206/17) dated
of