Key Issues for the Coming Month
6.1
Key issues to be considered in
the coming month include:
·
Generation of dust from
stockpiles, haul road and vehicles movement on-site;
·
Noise from operation equipment
and machinery on-site;
·
Regular removal of demolished
wastes;
·
Regular removal of mud, sand
and silt along drainage channel;
·
Wastewater discharge from site;
·
Storage of chemicals/fuel and chemical
waste/waste oil on site; and
·
Surface runoff from site and
wheel washing bay.
Monitoring Schedule for the Next
Month
6.2
The environmental monitoring
schedule for the next month is shown in Appendix C.