1.0              INTRODUCTION

 

Wai Kee (Zens) Construction & Transportation Co., Ltd. (WKC&T) has been awarded the Contract No.: CV/2002/11,”Construction of Jetty at Lung Kwu Chau² (the Project) by the CED. ETS-Testconsult Limited (ETL) has been commissioned as Environmental Team (ET) to carry out environmental monitoring at Lung Kwu Chau.

 

Under the requirements of Section 4 of Environmental Permit to Construct and Operate a Designate Project (EP-150/2002/A), EM&A programme as set out in the EM&A Manual was required to be implemented. In accordance with the EM&A manual, environmental monitoring of water quality, ecology and waste management were required for the Project.

 

The EM&A requirement is described in details in subsequent sections, including:

·          Monitoring parameters;

·          Action and Limit levels for all environmental parameters;

·          Event-Action Plans;

·          Environmental mitigation measures, as recommended in the project EIA study report;

·          Environmental requirements in contract documents.

 

This Final EM&A Review Report summarizes the environmental monitoring results and audit findings of the EM&A program during the course of the Project.