5.                ENVIRONMENTAL SITE INSPECTION

 

Site Inspections

 

5.1               Site inspection was carried out on a weekly basis to monitor the timely implementation of proper environmental pollution control and mitigation measures for the Project. In the month, four site inspections were carried out. The summary of weekly environmental site inspections observations and environmental site inspection checklists are attached in Appendix H[INCLUDE SITE INSPECTION RECORDS IN APPENDIX H].

 

Review of Environmental Monitoring Procedures

 

5.2               The monitoring works conducted by the Environmental Team were inspected regularly. Observations have been recorded for the monitoring works as follows:

 

Air Quality Monitoring

·         The monitoring team recorded the observations around the monitoring stations within and outside of the construction site.

·         The monitoring team recorded the temperature and general weather condition on the monitoring day.

 

Noise Monitoring

·         The monitoring team recorded the observations around the monitoring stations, which might affect the results.

·         Major noise sources were identified and recorded.

 

Advice on Waste Management Status

 

5.3               The actual quantities of uncontaminated sediment, contaminated sediment, inert C&D materials and C&D wastes generated by activities of the Project in the month are provided in Table 5.1. Trip ticket system was implemented for all offsite waste disposal.

 

Table 5.1      Summary of Waste Disposal in the Month

 

Type of Waste Material

Disposed Quantity

Destination

Uncontaminated sediments

Nil

Not Applicable

Contaminated sediments

Nil

Not Applicable

Inert C&D materials

590 m3

Tuen Mun Area 38

Non-inert C&D waste

Metals

12,520 kg

Recycling companies

Paper/cardboard packaging

Nil

Not Applicable

Plastics

Nil

Not Applicable

Chemical waste

Nil

Not Applicable

Others, e.g. general refuse

12 m3

WENT Landfill

 [INPUT SOLID WASTE DISPOSAL QUANTITIES & DESTINATIONS WITH CONTRACTOR’S WASTE DISPOSAL INFORMATION IN REPORTING MONTH]

 

Status Environmental Licences and Permits

[INCLUDE ANY NEW LICENSE & PERMIT INFORMATION IN REPORTING MONTH]

5.4               The status of all permits/licences obtained/in-use in the month is summarised in Appendix I. [INCLUDE ALL LICENSE & PERMIT INFORMATION IN APPENDIX M]

 

Implementation Status of Environmental Mitigation Measures

 

5.5               An updated summary of the Environmental Mitigation Implementation Schedule (EMIS) is presented in Appendix J.

 

5.6               [INCLUDE EMIS FOR REPORTING MONTH IN APPENDIX I] During the weekly site inspection conducted by the Environmental Team in the month, the following observations and recommendations were made.

 

Resource Management [INCLUDE AIR QUALITY SITE OBSERVATIONS IN REPORTING MONTH, SOME TYPICAL EXAMPLES SHOWN BELOW FOR REFERENCE]

 

·         No observations and recommendations were made during the weekly site inspections in the month.

 

 [REVISE STATEMENT TO REPORT ON CONTRACTOR’S IMPLEMENTATION STATUS OF MITIGATION MEASURES]

Material Storage/Spillage/Leakage [INCLUDE AIR QUALITY SITE OBSERVATIONS IN REPORTING MONTH, SOME TYPICAL EXAMPLES SHOWN BELOW FOR REFERENCE]

 

·         Oil stain was found next to a generator set at Grid 5 Westbound on deck. The Contractor was reminded to remove the oil stain.

·         One drip tray at Grid 9 was found filled with oily water. The Contractor was reminded to remove the oily water and dispose of as chemical waste.

 

Waste Management [INCLUDE AIR QUALITY SITE OBSERVATIONS IN REPORTING MONTH, SOME TYPICAL EXAMPLES SHOWN BELOW FOR REFERENCE]

 

·         Accumulated general refuse was found in viaduct in between Grid 7 to Grid 8. Eastbound and untidy condition was found at C143 and C184. The Contractor was reminded to improve housekeeping on site.

 

Water Pollution [INCLUDE AIR QUALITY SITE OBSERVATIONS IN REPORTING MONTH, SOME TYPICAL EXAMPLES SHOWN BELOW FOR REFERENCE]

 

·         Stagnant water was found in catchpit at TTA3, rubbish was found in the u-channel at TTA3 and mud was found in the u-channel of Siu Lam roundabout. The Contractor was reminded to properly maintain the drainage system.

·         Muddy water was observed at the shoreline in front of the Marine Police West Division Base. The Contractor was reminded to provide geotextile and sump pit until completion of u-channel at Grid 1 and 2.

·         Catchpits at TTA12 and C66 (outfall D) and u-channel at F16, F17 and TTA 58 were blocked. The Contractor was reminded to clear the blockage and desilt regularly.

·         Leaves were found inside the u-channel at TTA3 and C6/C66. Stagnant water was found at outfall EE and FF and in u-channel at F16. The Contractor was reminded to properly maintain the drainage system.

 

Air Emissions

[INCLUDE AIR QUALITY SITE OBSERVATIONS IN REPORTING MONTH, SOME TYPICAL EXAMPLES SHOWN BELOW FOR REFERENCE]

·         A partially covered stockpile of excavated material was found at FR16. The contractor was reminded to properly cover the stockpile.

 

Noise/Vibration [INCLUDE AIR QUALITY SITE OBSERVATIONS IN REPORTING MONTH, SOME TYPICAL EXAMPLES SHOWN BELOW FOR REFERENCE]

 

·         No observations and recommendations were made during weekly site inspections in the month.

 

Abnormal/Emergency [INCLUDE AIR QUALITY SITE OBSERVATIONS IN REPORTING MONTH, SOME TYPICAL EXAMPLES SHOWN BELOW FOR REFERENCE]

 

·         No observations and recommendations were made during the weekly site inspections in the month.

 

Miscellaneous

 

·         Stagnant water was found at TTAW12. The Contractor was reminded to remove the water or level the area.

·         Sand was found on carriageway at TTAW12, rubbish and untidy condition was found at F16 and FR17. The Contractor was reminded to improve housekeeping in site.

·         Stagnant water was observed in a drip tray with an air compressor in front of the Contractor’s site office and at FR 16 and FR 17.

·         Sand Patches were observed at TTA12. The Contractor was reminded to remove them as soon as possible.

·         Stagnant water was found in chamber on pier at Grid 8 Eastbound. The Contractor was reminded to remove the stagnant water to prevent mosquitoes breeding. [INCLUDE AIR QUALITY SITE OBSERVATIONS IN REPORTING MONTH, SOME TYPICAL EXAMPLES SHOWN BELOW FOR REFERENCE]

·         Stagnant water was found at site entrance and at TTAW12 after heavy rainfall. The Contractor was reminded to clear the stagnant water regularly.

·         The Contractor was reminded to improve housekeeping at TTA58.

 

 

Summary of Exceedances of Environmental Quality Performance Limit

 

5.7               The Event and Action Plans for air quality and noise are presented in Appendix K.

 

5.8               No exceedance of Action and Limit Levels for 1-hour and 24-hour TSP and noise was recorded in the month.

 

Summary of Environmental Complaints, Notifications of Summons and Successful Prosecutions

 

5.9               Figure 5.1 presents the environmental complaint flow diagram of the Project.

 

5.10            No environmental complaint, notification of summons and successful prosecution was received in the reporting month.