5.1
Site inspection was carried out on a weekly basis to monitor
the timely implementation of proper environmental pollution control and
mitigation measures for the Project. In the month, five site inspections were
carried out. The summary of weekly environmental site inspections observations
and environmental site inspection checklists are attached in Appendix
Review of Environmental Monitoring Procedures
5.2
The monitoring works conducted by the Environmental Team
were inspected regularly. Observations have been recorded for the monitoring
works as follows:
Air Quality
Monitoring
·
The
monitoring team recorded the observations around the monitoring stations within
and outside of the construction site.
·
The
monitoring team recorded the temperature and general weather condition on the
monitoring day.
Noise Monitoring
·
The
monitoring team recorded the observations around the monitoring stations, which
might affect the results.
·
Major
noise sources were identified and recorded.
Advice on Waste Management Status
5.3
The actual quantities of uncontaminated sediment,
contaminated sediment, inert C&D materials and C&D wastes generated by
activities of the Project in the month are provided in Table 5.1. Trip ticket
system was implemented for all offsite waste disposal.
Table 5.1 Summary of Waste Disposal in The Month
Type of Waste Material |
Disposed Quantity |
Destination |
|
Uncontaminated sediments |
Nil |
Not Applicable |
|
Contaminated sediments |
Nil |
Not Applicable |
|
Inert C&D materials |
1,105m3 |
Tuen Mun Area 38 |
|
Non-inert
C&D waste |
Metals |
103.79kg |
Recycling companies |
Paper/cardboard packaging |
Nil |
Not Applicable |
|
Plastics |
Nil |
Not Applicable |
|
Chemical waste |
Nil |
Not Applicable |
|
Others, e.g. general refuse |
123m3 |
WENT Landfill |
Status Environmental Licences and Permits
5.4
The status of all permits/licences obtained/in-use in the
month is summarised in Appendix K.
Implementation Status of Environmental Mitigation
Measures
5.5
An updated summary of the Environmental Mitigation
Implementation Schedule (EMIS) is presented in Appendix L.
5.6
During the weekly site inspection conducted by the
Environmental Team in the month, the following observations and recommendations
were made.
Resource Management
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Material
Storage/Spillage/Leakage
·
Accumulated construction waste was found at area B and broken tree
branches and leaves were found at gully of C66 and on carriageway at TTA32. The
Contractor was reminded to improve housekeeping on site.
·
Oil seepage was observed from a generator and a few oil drums. The
Contractor was reminded to clean up the oil spillage as soon as possible.
·
Water
was observed accumulated in drip trays with generator and oil drums. The
Contractor was reminded to remove them as soon as possible.
·
Oil seepage was observed from a generator set on deck at Grid 6. The
Contractor was reminded to clear the oil stain and dispose of as chemical
waste.
Waste Management
·
Sand was found on carriageway at TTA12 and TTA3. General refuse was
found at F17, deadleaves were found at C545 behind
the temple and untidy condition was found at C143. The Contractor was reminded
to improve housekeeping at the locations.
Water Pollution
·
Blockage of catchpits were found at TTA3, C66
(outfall BB & EE) and C6. The Contractor was reminded to properly maintain
the drainage system to prevent flooding.
·
Deadleaves were found inside u-channel at TTA58-S2. The
Contractor was reminded to properly maintain the drainage system.
·
Broken concrete and leaves were found inside u-channel at TTA3 and
C6/C66 and gullies at F16 were found blocked. The Contractor was reminded to
properly maintain the drainage system.
·
Deadleaves were found inside u-channel at TTA3. The
Contractor was reminded to properly maintain the drainage system.
Air Emissions
·
Mud trail was found at the site entrance of F17. The Contractor was
reminded to provide wheel-washing at site exits to prevent dust emission.
Noise/Vibration
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Abnormal/Emergency
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Miscellaneous
·
Stagnant water was found at Grid 9 site entrance. The Contractor was
reminded to clear the stagnant water or level the ground to prevent mosquitoes
breeding.
·
Stagnant water was found in the refuse collection bin at Grid 6, inside cachpit at F16 and in the excavated trench at TTA58-S2. The
Contractor was reminded to remove the stagnant water to prevent mosquitoes
breeding.
·
The Contractor was reminded to improve housekeeping at Grid 8 and clear
the sand deposited at site office area.
·
Stagnant water was found inside chamber of Grid 8, excavated trench at
TTA58-S2, inside u-channel at F17 and inside catchpit
at F16. The Contractor was reminded to remove the stagnant water to prevent
mosquitoes breeding.
Summary of Exceedances of Environmental Quality
Performance Limit
5.7
The Event and Action Plans for air quality and noise are
presented in Appendix M.
5.8
One Action level exceedance was
recorded on 24-hour TSP at AM1 on 22 August 2006. The exceedance
was considered not related to the Project.
Summary of Environmental Complaints, Notifications
of Summons and Successful Prosecutions
5.9
Figure 5.1 presents the environmental complaint flow diagram
of the Project.
5.10
No environmental complaint, notification of summons and
successful prosecution was received in the reporting month.