5.               ENVIRONMENTAL SITE INSPECTION

 

Site Inspections

 

5.1               Site inspection was carried out on a weekly basis to monitor the timely implementation of proper environmental pollution control and mitigation measures for the Project. In the month, four site inspections were carried out. The summary of weekly environmental site inspections observations and environmental site inspection checklists are attached in Appendix H[INCLUDE SITE INSPECTION RECORDS IN APPENDIX H]HHHHHH.

 

Review of Environmental Monitoring Procedures

 

5.2               The monitoring works conducted by the Environmental Team were inspected regularly. Observations have been recorded for the monitoring works as follows:

 

Air Quality Monitoring

·         The monitoring team recorded the observations around the monitoring stations within and outside of the construction site.

·         The monitoring team recorded the temperature and general weather condition on the monitoring day.

 

Noise Monitoring

·         The monitoring team recorded the observations around the monitoring stations, which might affect the results.

·         Major noise sources were identified and recorded.

 

Advice on Waste Management Status

 

5.3               The actual quantities of uncontaminated sediment, contaminated sediment, inert C&D materials and C&D wastes generated by activities of the Project in the month are provided in Table 5.1. Trip ticket system was implemented for all offsite waste disposal.

 

Table 5.1          Summary of Waste Disposal in The Month

 

Type of Waste Material

Disposed Quantity

Destination

Uncontaminated sediments

Nil

Not Applicable

Contaminated sediments

Nil

Not Applicable

Inert C&D materials

1,840m3

Tuen Mun Area 38

Non-inert C&D waste

Metals

54.91kg

Recycling companies

Paper/cardboard packaging

Nil

Not Applicable

Plastics

Nil

Not Applicable

Chemical waste

Nil

Not Applicable

Others, e.g. general refuse

100m3

WENT Landfill

 

Status Environmental Licences and Permits

[INCLUDE ANY NEW LICENSE & PERMIT INFORMATION IN REPORTING MONTH]

5.4               The status of all permits/licences obtained/in-use in the month is summarised in Appendix I. [INCLUDE ALL LICENSE & PERMIT INFORMATION IN APPENDIX M]

 

Implementation Status of Environmental Mitigation Measures

 

5.5               An updated summary of the Environmental Mitigation Implementation Schedule (EMIS) is presented in Appendix J.

 

5.6               [INCLUDE EMIS FOR REPORTING MONTH IN APPENDIX I] During the weekly site inspection conducted by the Environmental Team in the month, the following observations and recommendations were made.

 

Resource Management

 

·         No observations and recommendations were made during the weekly site inspections in the month.

 

 [REVISE STATEMENT TO REPORT ON CONTRACTOR’S IMPLEMENTATION STATUS OF MITIGATION MEASURES]

Material Storage/Spillage/Leakage [INCLUDE AIR QUALITY SITE OBSERVATIONS IN REPORTING MONTH, SOME TYPICAL EXAMPLES SHOWN BELOW FOR REFERENCE]

 

·         Saw dust was found on ground at Grid 7 on deck. The Contractor was reminded to clear the saw dust and improve housekeeping.

·         The Contractor was reminded to provide drip tray to oil drum on deck at Grid 8.

·         Sand and silt runoff after heavy rainfall was found at TTA58-S2 and site exit of Area B. An uncovered stockpile was found at TTA47. The Contractor was reminded to prevent further surface runoff.

·         Drip tray at Grid 3 for an oil drum was found filled with oily water. The Contractor was reminded to clear the oily water.

·         Oil seepage was found during maintenance of plant and oil drums were found without drip tray at Chainage 1900-2200.

·         Oil stains were found at eastbound of Grid 3 and 5 on deck.

 

Waste Management [INCLUDE AIR QUALITY SITE OBSERVATIONS IN REPORTING MONTH, SOME TYPICAL EXAMPLES SHOWN BELOW FOR REFERENCE]

 

·         Accumulated general refuse was found at Grid 9 and at Gate 2. The Contractor was reminded to clear the refuse off-site regularly.

·         Accumulated refuse was found at Grid 9. The Contractor was reminded to regularly remove the refuse. The Contractor was also reminded to improve housekeeping at TTA58-S2.

·         The Contractor was reminded to improve housekeeping at TTA31, TTA33 and TTA at junction with Hong Fai Road.

 

Water Pollution [INCLUDE AIR QUALITY SITE OBSERVATIONS IN REPORTING MONTH, SOME TYPICAL EXAMPLES SHOWN BELOW FOR REFERENCE]

 

·         Deadleaves were found inside u-channel and catchpit at TTA3. The Contractor was reminded to properly maintain the drainage system.

·         Sand and leaves were found inside u-channel at TTA3, F16 and Siu Lam Roundabout. The Contractor was reminded to properly maintain the drainage system.

 

Air Emissions [INCLUDE AIR QUALITY SITE OBSERVATIONS IN REPORTING MONTH, SOME TYPICAL EXAMPLES SHOWN BELOW FOR REFERENCE]

 

·         Fugitive dust was observed at TTAW12 during rock breaking. The Contractor was reminded to provide sufficient mitigation measures to prevent dust emission.

·         Fugitive dust was observed during vehicle movement along unpaved area at Chainage 1900-2200 and at Siu Lam Roundabout site exit. The Contractor was reminded to frequently dampen the haul road.

·         Dark smoke was observed emitted from an air compressor (偉雄) at grid 1. The Contractor was reminded to properly maintain the plants.

 

Noise/Vibration [INCLUDE AIR QUALITY SITE OBSERVATIONS IN REPORTING MONTH, SOME TYPICAL EXAMPLES SHOWN BELOW FOR REFERENCE]

 

·         No observations and recommendations were made during the weekly site inspections in the month.

 

Abnormal/Emergency [INCLUDE AIR QUALITY SITE OBSERVATIONS IN REPORTING MONTH, SOME TYPICAL EXAMPLES SHOWN BELOW FOR REFERENCE]

 

·         No observations and recommendations were made during the weekly site inspections in the month.

 

 

 

Miscellaneous

 [INCLUDE AIR QUALITY SITE OBSERVATIONS IN REPORTING MONTH, SOME TYPICAL EXAMPLES SHOWN BELOW FOR REFERENCE]

·         Stagnant water was found at carriageway 2000, Siu Lam Roundabout, inside catchpit at F16 and inside broken water-filled barriers. The Contractor was reminded to remove the stagnant water to prevent mosquitoes breeding.

·         Stagnant water was found at Gate 2 wheel-washing bay and below the tools storage. The Contractor was reminded to clear the stagnant water to prevent mosquitoes breeding.

 

Summary of Exceedances of Environmental Quality Performance Limit

 

5.7               The Event and Action Plans for air quality and noise are presented in Appendix K.

 

5.8               No exceedance of impact 1-hour and 24-hour TSP and noise monitoring was recorded in the reporting month.

 

Summary of Environmental Complaints, Notifications of Summons and Successful Prosecutions

 

5.9               Figure 5.1 presents the environmental complaint flow diagram of the Project.

 

5.10            No environmental complaint, notification of summons and successful prosecution was received in the reporting month.