IMPORTANT NOTE:

This EM&A Monthly Report Template provides protocol statements to be included for air quality / noise level / water quality impact monitoring, landscape & visual, and environmental site inspections.  All RED TEXT (including body text and headers) would be Project Specific and respective PMs MUST revise accordingly.  Instructions to update particular items are shown as hidden BLUE TEXT, all PMs should read and input to respective sections in the Report accordingly.  The Front Page (Cover) of this Template shall use the latest version in M:\Data\Template\Submission Checking Record.doc.

 

7.                CONCLUSIONS AND RECOMMENDATIONS

 

Conclusions

 

7.1              Environmental monitoring and audit was performed in October 2006. All monitoring and audit results in the month were checked and reviewed.

 

7.2              All 1-hour and 24-hour TSP monitoring results recorded in the month complied with the Action and Limit Levels.

 

7.3              All noise monitoring results recorded in the month complied with the Action and Limit Levels.

 

7.4              Water quality monitoring was suspended since 1 December 2005 as there is no rock and sand excavation at the inter-tidal zone for the construction of Slope 6SW-D/FR 17.

 

7.5              In general, the Contractor satisfactorily implemented all the required mitigation measure and was reasonably responsive to the ET’s recommendations on any discrepancy observed during the weekly environmental site inspection.

 

 

7.8              No environmental complaint, notification of summons and successful prosecution was received in the reporting month.

 

 

7.10         

Recommendations

 

7.9              According to results of weekly environmental site inspections performed in the month and the construction programme for the coming month, recommendations for air quality, construction noise, water quality and chemical and waste management are detailed in Section 6.1.Noise level monitoring was performed in this reporting period. [SUMMARIZE NOISE MONITORING RESULTS, EXCEEDANCES & FOLLOW-UP ACTIONS TAKEN IN REPORTING MONTH]