5.1
Site inspection was carried out on a weekly basis to monitor
the timely implementation of proper environmental pollution control and
mitigation measures for the Project. In the month, five site inspections were
carried out. The summary of weekly environmental site inspections observations
and environmental site inspection checklists are attached in Appendix H
Review of Environmental Monitoring Procedures
5.2
The monitoring works conducted by the Environmental Team
were inspected regularly. Observations have been recorded for the monitoring
works as follows:
Air Quality
Monitoring
·
The
monitoring team recorded the observations around the monitoring stations within
and outside of the construction site.
·
The
monitoring team recorded the temperature and general weather condition on the
monitoring day.
Noise Monitoring
·
The
monitoring team recorded the observations around the monitoring stations, which
might affect the results.
·
Major
noise sources were identified and recorded.
Advice on Waste Management Status
5.3
The actual quantities of uncontaminated sediment,
contaminated sediment, inert C&D materials and C&D wastes generated by
activities of the Project in the month are provided in Table 5.1. Trip ticket
system was implemented for all offsite waste disposal.
Table 5.1 Summary of Waste Disposal in The Month
Type of Waste Material |
Disposed Quantity |
Destination |
|
Uncontaminated sediments |
Nil |
Not Applicable |
|
Contaminated sediments |
Nil |
Not Applicable |
|
Inert C&D materials |
1,080m3 |
Tuen Mun Area 38 |
|
Non-inert
C&D waste |
Metals |
30.06kg |
Recycling companies |
Paper/cardboard packaging |
Nil |
Not Applicable |
|
Plastics |
Nil |
Not Applicable |
|
Chemical waste |
Nil |
Not Applicable |
|
Others, e.g. general refuse |
95m3 |
WENT Landfill |
Status Environmental Licences and Permits
5.4
The status of all permits/licences obtained/in-use in the
month is summarised in Appendix I.
Implementation Status of Environmental Mitigation
Measures
5.5
An updated summary of the Environmental Mitigation
Implementation Schedule (EMIS) is presented in Appendix J.
5.6
During the weekly site inspection conducted by the
Environmental Team in the month, the following observations and recommendations
were made.
Resource Management
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Material
Storage/Spillage/Leakage
·
One oil drum was found without drip tray on deck at Grid 8. The
Contractor was reminded to provide drip tray to all chemical drums on site.
·
Oil seepage was observed from a drip tray holding an oil drum at Grid 6
(WB) and oil stain was noted underneath a drip tray holding a generator at Grid
6 (EB). The Contractor was requested to clear the seeped oil / oil stain.
·
The Contractor was requested to provide drip tray to an oil drum at Grid
6 (WB).
·
The Contractor was requested to clear the oil left inside the drip tray
at Grid 6 (WB & EB) and handle the cleared oil as chemical waste.
·
Two oil containers were found placed on bareground
without drip tray at Gate 2. The Contractor was reminded to properly store the
chemicals.
Waste Management
·
Leaves were found beside carriageway at TTA31-2A, TTA31-1A and at Hong
Fai Road Junction. C&D materials were found at FR17, TTA31-2A and corner of
·
C&D waste gathered and sorted at Grid 9 had to be collected properly
for disposal.
·
Untidy condition was found at Grid 1. The Contractor was reminded to
improve housekeeping.
·
C&D waste was found on Slope of TTA3. The Contractor was reminded to
improve housekeeping.
·
C&D waste and stockpile of cement bags were found at Chainage 2200-2600. Leaves were found along the side of
carriageway at TTA31 and along footpath at TTA31-2. The Contractor was reminded
to improve housekeeping on site.
Water Pollution
·
Tarpaulin sheets and C&D materials were found inside u-channel at
TTA3 and leaves were found in u-channel at TTA47-S2. The Contractor was
reminded to properly maintain the drainage system.
·
Leaves and sand were found inside the u-channel and carchpit
at TTA3. The Contractor was reminded to properly maintain the drainage system.
·
Gullies at TTA31 were found blocked by leaves. The Contractor was
reminded to properly maintain the drainage system.
Air Emissions
·
Grey smoke was found emitted from an excavator at Gate 1. The Contractor
was reminded to properly maintain the plants on site.
·
The Contractor was advised to provide tarpaulin cover to stockpile of
fill material at Grid 1.
·
Stockpile of fine material was found at Chainage
2200 without cover. The Contractor was reminded to cover the stockpile.
Noise/Vibration
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Abnormal/Emergency
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Miscellaneous
·
The Contractor was reminded to remove the stagnant water in the
wheel-washing bay at Gate 2 to prevent mosquitoes breeding.
·
One concrete chute washing was observed without collection at Chainage 2100. The Contractor was reminded to collect the washwater and treat prior to discharge.
·
Water ponding was found at Gate 1 and on deck
at Grid 3. The Contractor was reminded to remove the stagnant water.
Summary of Exceedances of
Environmental Quality Performance Limit
5.7
The Event and Action Plans for air quality and noise are
presented in Appendix K.
5.8
No exceedance of impact 1-hour and
24-hour TSP and noise monitoring was recorded in the reporting month.
Summary of Environmental Complaints, Notifications
of Summons and Successful Prosecutions
5.9
Figure 5.1 presents the environmental complaint flow diagram
of the Project.
5.10
No environmental complaint, notification of summons and
successful prosecution was received in the reporting month.