Appendix H              Summary of Weekly Environmental Site Inspection Observations in January 2007

 

Inspection date

Observation

Contractor’s Follow-up Action

4

9

18

25

Ö

 

 

 

Sand was found on pedestrian walkway at C545 and Chainage 2070. Leaves were found on edge of carriageway at TTA31 and at Hong Fai Road junction.

Clear the leaves and sand.

Ö

 

 

 

C&D materials found on pedestrian walkway at TTA3, FR17 and Chainage 2200-2300.

Improve housekeeping on site.

Ö

 

 

 

Stockpile of fine material found at Tai Lam Kok and fugitive dust observed during dumping of materials at the stockpile.

Remove the stockpile or dampen the dusty stockpile / operation.

 

Ö

Ö

 

Mud trails observed outside the site exit of Gate 1 and Siu Lam roundabout.

Properly practice wheel-washing for vehicle  before leaving the site.

 

Ö

 

 

Fugitive dust observed from wind erosion or vehicle movement on the unpaved area at Eastbound from Grid 9 to Tai Lam Kok.

Increase water spraying frequency.

 

Ö

 

 

Stockpile of sand was observed at CH1900 seafront footpath.

Cover the idle stockpile.

 

 

Ö

Ö

Rubbish and leaves were found inside u-channel at TTA3and FR17.

Properly maintain the drainage syste.

 

 

 

Ö

Unpaved area at Chainage 2000 was not dampened.

Provide water spraying to prevent dust emission.

 

 

 

Ö

C&D waste at site entrance of Chainage 2000.

Clear the C&D waste.