Inspection date |
Observation |
Contractor’s Follow-up
Action |
|||
4 |
9 |
18 |
25 |
||
Ö |
|
|
|
Sand was found on
pedestrian walkway at C545 and Chainage 2070. Leaves were found on edge of
carriageway at TTA31 and at |
Clear the leaves and
sand. |
Ö |
|
|
|
C&D materials found
on pedestrian walkway at TTA3, FR17 and Chainage 2200-2300. |
Improve housekeeping on
site. |
Ö |
|
|
|
Stockpile of fine
material found at Tai Lam Kok and fugitive dust observed during dumping of
materials at the stockpile. |
Remove the stockpile or
dampen the dusty stockpile / operation. |
|
Ö |
Ö |
|
Mud trails observed
outside the site exit of Gate 1 and Siu Lam roundabout. |
Properly practice
wheel-washing for vehicle before
leaving the site. |
|
Ö |
|
|
Fugitive dust observed
from wind erosion or vehicle movement on the unpaved area at Eastbound from
Grid 9 to Tai Lam Kok. |
Increase water spraying
frequency. |
|
Ö |
|
|
Stockpile of sand was
observed at CH1900 seafront footpath. |
Cover the idle stockpile. |
|
|
Ö |
Ö |
Rubbish and leaves were
found inside u-channel at TTA3and FR17. |
Properly maintain the
drainage syste. |
|
|
|
Ö |
Unpaved area at Chainage
2000 was not dampened. |
Provide water spraying to
prevent dust emission. |
|
|
|
Ö |
C&D waste at site
entrance of Chainage 2000. |
Clear the C&D waste. |