Appendix H              Summary of Weekly Environmental Site Inspection Observations in February 2007

 

Inspection date

Observation

Contractor’s Follow-up Action

1

6

15

22

Ö

 

Ö

Ö

Branches and leaves were found inside u-channel and catchpit at TTA3.

Properly maintain the drainage system.

Ö

 

 

 

Sand was found on carriageway at TTA3.

Improve housekeeping on site.

 

Ö

 

 

No drip tray was provided to the oil containers at Siu Lam Roundabout.

Provide drip tray to oil containers.

 

Ö

 

 

General Refuse was left at Grid 9 Tai Lam Kok works area.

Clean up and dispose of properly.

 

Ö

 

 

Stockpile of C&D material at Siu Lam Roundabout works area was not dampened or covered.

Properly cover, dampened or remove the stockpile.

 

Ö

 

 

Fugitive dust was observed when there was vehicle movement at Tai Lam Kok works area.

Spray water over the unpaved area for dust suppression.

 

Ö

 

 

Two air compressors operating at Siu Lam Roundabout without closing the flaps.

Close the flaps / doors of operating machinery.

 

 

Ö

 

One oil drum at Hong Fai road junction was found without drip tray.

Provide drip tray for oil containers.

 

 

Ö

 

Untidy condition at Tin Hau Temple, TTA32, TTA58S2 and Hong Fai Road junction.

Improve housekeeping on site.

 

 

Ö

 

Uncovered excavation area at Grid 2.

Take precaution measure to excavation area to prevent muddy runoff.

 

 

 

Ö

C&D waste was found accumulated at Chainage 2200.

Regularly clear the C&D waste off-site.