Inspection date |
Observation |
Contractor’s Follow-up
Action |
|||
1 |
6 |
15 |
22 |
||
Ö |
|
Ö |
Ö |
Branches and leaves were
found inside u-channel and catchpit at TTA3. |
Properly maintain the
drainage system. |
Ö |
|
|
|
Sand was found on
carriageway at TTA3. |
Improve housekeeping on
site. |
|
Ö |
|
|
No drip tray was provided
to the oil containers at Siu Lam Roundabout. |
Provide drip tray to oil
containers. |
|
Ö |
|
|
General Refuse was left
at Grid 9 Tai Lam Kok works area. |
Clean up and dispose of
properly. |
|
Ö |
|
|
Stockpile of C&D
material at Siu Lam Roundabout works area was not dampened or covered. |
Properly cover, dampened
or remove the stockpile. |
|
Ö |
|
|
Fugitive dust was
observed when there was vehicle movement at Tai Lam Kok works area. |
Spray water over the
unpaved area for dust suppression. |
|
Ö |
|
|
Two air compressors
operating at Siu Lam Roundabout without closing the flaps. |
Close the flaps / doors
of operating machinery. |
|
|
Ö |
|
One oil drum at Hong Fai
road junction was found without drip tray. |
Provide drip tray for oil
containers. |
|
|
Ö |
|
Untidy condition at |
Improve housekeeping on
site. |
|
|
Ö |
|
Uncovered excavation area
at Grid 2. |
Take precaution measure
to excavation area to prevent muddy runoff. |
|
|
|
Ö |
C&D waste was found
accumulated at Chainage 2200. |
Regularly clear the
C&D waste off-site. |