Inspection date |
Observation |
Contractor’s Follow-up
Action |
||||
1 |
6 |
15 |
22 |
29 |
||
Ö |
|
|
|
|
C&D waste found on
slope of TTA3, Chainage 2200 and Tai Lam Kok Roundabout carpark. |
Clear the C&D waste
regularly. |
Ö |
|
Ö |
Ö |
Ö |
Leaves were found inside
catchpit and u-channel at TTA3. |
Properly maintain the
drainage system |
|
Ö |
|
|
|
Fugitive dust was
observed during vehicles movement and excavation at Gate 1. |
Provide sufficient water
spraying. |
|
Ö |
|
|
|
Mud trails were observed
at site exit at Siu Lam Roundabout. |
Provide wheel-washing to
all site exit. |
|
|
Ö |
|
|
Soil runoff was found on
pedestrian walkway at Gate 1. |
Improve housekeeping on
site. |
|
|
Ö |
|
Ö |
Refuse was found at FR17. |
Clear the refuse regularly. |
|
|
|
Ö |
|
C&D waste was found
behind the temple. Refuse and C&D waste found at F17. |
Regularly remove the
refuse and C&D waste off-site. |
|
|
|
|
Ö |
Skip was found full of
general refuse at Gate 1. |
Regularly remove the
refuse off site. |
|
|
|
|
Ö |
One oil drum at Tai Lam
Kok was found without drip tray. |
Provide drip tray to all
chemicals. |
|
|
|
|
Ö |
Soil / asphalt found
deposited at the site exit of Siu Lam Roundabout. |
Clear the deposited soil. |