1.1
Maunsell Environmental Management Consultants Limited
(MEMCL) (hereinafter called the “ET”) was appointed by Gammon Construction
Limited (GCL) (hereinafter called the “Contractor”) to undertake Environmental
Monitoring and Audit for “Improvement to
1.2
The EM&A programme for the Project commenced on 16 July
2004. This report presents a summary of the environmental monitoring and audit
works, list of activities, and mitigation measures for the Project in April 2007
(from 1 to 30 April 2007).
1.3
The organisation of the environmental management team is
shown in Figure 1.1. Key personnel contacts are presented in Appendix A.
Environmental
Status in the Reporting Month
1.4
The construction programme of the Project is provided in
Appendix B. In the month, the following activities took place for the
construction of the Project:
·
Seawall
construction;
·
Viaduct
and new road construction; and
·
Reconstruction
of
1.5
Layout plan of the Project work site is provided in Figure
1.2 a to e.
1.6
The description and detailed locations of sensitive
receivers and monitoring stations for air quality, noise and water quality
1.7
The EM&A programme requires environmental monitoring for
air quality, noise and water quality
·
All monitoring parameters
·
Action and Limit levels for all environmental parameters
·
Event and Action Plans
·
Environmental mitigation measures, as recommended in the
project final EIA report
·
Environmental requirements in contract documents.
1.8
The advice on the implementation status of environmental
protection and pollution control/mitigation measures is summarised in Appendix J
of the Report.