4.1Water quality monitoring was
suspended since 1 December 2005 as there is no rock and sand excavation at the
inter-tidal zone for the construction of Slope 6SW-D/FR 17.
[INCLUDE LAB WATER
QUALITY TESTING QC RESULTS FOR THE REPORTING MONTH IN APPENDIX L]