5.1
Site inspection was carried out on a weekly basis to monitor
the timely implementation of proper environmental pollution control and
mitigation measures for the Project. In the month, four site inspections were
carried out. The summary of weekly environmental site inspections observations
and environmental site inspection checklists are attached in Appendix H
Review of
Environmental Monitoring Procedures
5.2
The monitoring works conducted by the Environmental Team
were inspected regularly. Observations have been recorded for the monitoring
works as follows:
Air Quality
Monitoring
·
The
monitoring team recorded the observations around the monitoring stations within
and outside of the construction site.
·
The
monitoring team recorded the temperature and general weather condition on the
monitoring day.
Noise Monitoring
·
The
monitoring team recorded the observations around the monitoring stations, which
might affect the results.
·
Major
noise sources were identified and recorded.
Advice on
Waste Management Status
5.3
The actual quantities of uncontaminated sediment,
contaminated sediment, inert C&D materials and C&D wastes generated by
activities of the Project in the month are provided in Table 5.1. Trip ticket
system was implemented for all offsite waste disposal.
Table 5.1 Summary of Waste Disposal in The Month
Type of Waste Material |
Disposed Quantity |
Destination |
|
Uncontaminated sediments |
Nil |
Not Applicable |
|
Contaminated sediments |
Nil |
Not Applicable |
|
Inert C&D materials |
200m3 |
Tuen Mun
Area 38 |
|
Non-inert
C&D waste |
Metals |
Nil |
Recycling companies |
Paper/cardboard packaging |
Nil |
Not Applicable |
|
Plastics |
Nil |
Not Applicable |
|
Chemical waste |
Nil |
Not Applicable |
|
Others, e.g. general refuse |
10m3 |
WENT Landfill |
[INPUT SOLID WASTE DISPOSAL QUANTITIES &
DESTINATIONS WITH CONTRACTOR’S WASTE DISPOSAL INFORMATION IN REPORTING MONTH]
Status
Environmental Licences and Permits
5.4
The status of all permits/licences obtained/in-use in the
month is summarised in Appendix I.
Implementation
Status of Environmental Mitigation Measures
5.5
An updated summary of the Environmental Mitigation
Implementation Schedule (EMIS) is presented in Appendix J.
5.6
During the weekly site inspection conducted by the
Environmental Team in the month, the following observations and recommendations
were made.
Resource Management
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Material
Storage/Spillage/Leakage
·
Stockpile of asphalt aggregates was found at Siu Lam Roundabout. The Contractor was reminded to clear
the aggregate as soon as possible to prevent runoff during rainstorm.
·
Little diesel stains were observed on the paved road
around Chainage 2400. The Contractor was advised to
timely clean up those diesel stains.
·
Some stockpiles of C&D material near Tai Lam Kok and C&D waste along the works area at
·
The Contractor was reminded to clear the C&D
material and sand on pedestrian walkway at Chainage
1900.
Waste Management
·
Skip at Gate 1 was full of refuse. C&D material
was accumulated at Tai Lam Kok carpark
and Gate 2. The Contractor was reminded to clear the waste and improve
housekeeping on site.
Water Pollution
·
Small quantity of muddy runoff was running into a
gully due to improper collection of wheel-washing / road cleaning water. The
Contractor was advised to properly collect the wash water.
·
The Contractor was reminded to clear the leaves and
refuse in the u-channel at TTA3.
Air Emissions
·
Mud trails were observed outside the site exit of C6.
The Contractor was advised to carry out wheel-washing within the site area.
·
Mud trails were found on carriageway at site exit of
Gate 2. The Contractor was reminded to clear the mid trails and provide
wheel-wash at site exit.
Noise/Vibration
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Abnormal/Emergency
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Miscellaneous
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Summary of Exceedances of Environmental Quality
Performance Limit
5.7
The Event and Action Plans for air quality and noise are
presented in Appendix K.
5.8
No exceedance of impact 1-hour and
24-hour TSP and noise monitoring was recorded in the reporting month.
Summary of
Environmental Complaints, Notifications of Summons and Successful Prosecutions
5.9
Figure 5.1 presents the environmental complaint flow diagram
of the Project.
5.10
No environmental complaint, notification of summons and
successful prosecution was received in the reporting month.