Appendix H              Summary of Weekly Environmental Site Inspection Observations in April 2007

 

Inspection date

Observation

Contractor’s Follow-up Action

4

10

19

26

Ö

 

 

 

Stockpile of asphalt aggregate was found at Siu Lam Roundabout.

Clear the aggregate to prevent runoff during rainstorm.

 

Ö

 

 

Diesel stains were observed on the paved road around Chainage 2400.

Clean up the diesel stains.

 

Ö

 

 

Mud trails were observed outside the site exit of C6 and small quantity of muddy runoff was running into a gully due to improper collection of wheel-washing / road cleaning water.

Carry out wheel-washing within site area and properly collect the wash water.

 

Ö

 

 

Some stockpiles of C&D material near Tai Lam Kok and C&D waste along the works area at Castle Peak Road

Collect the C&D material.

 

 

Ö

 

C&D material and sand was found on pedestrian walkway at Chainage 1900.

Clear the C&D material and sand.

 

 

Ö

 

Leaves and refuse were found inside the u-channel at TTA3.

Clear the leaves and refuse from the u-channel.

 

 

 

Ö

Skip at Gate 1 was full of refuse. C&D material was accumulated at Tai Lam Kok carpark and Gate 2.

Clear the waste and improve housekeeping on site.

 

 

 

Ö

Mud trails were found on carriageway at site exit of Gate 2.

Clear the mud trails and provide wheel-wash at site exit.