Inspection date |
Observation |
Contractor’s Follow-up
Action |
|||
4 |
10 |
19 |
26 |
||
Ö |
|
|
|
Stockpile of asphalt
aggregate was found at Siu Lam Roundabout. |
Clear the aggregate to
prevent runoff during rainstorm. |
|
Ö |
|
|
Diesel stains were
observed on the paved road around Chainage 2400. |
Clean up the diesel
stains. |
|
Ö |
|
|
Mud trails were observed
outside the site exit of C6 and small quantity of muddy runoff was running
into a gully due to improper collection of wheel-washing / road cleaning
water. |
Carry out wheel-washing
within site area and properly collect the wash water. |
|
Ö |
|
|
Some stockpiles of
C&D material near Tai Lam Kok and C&D waste along the works area at |
Collect the C&D
material. |
|
|
Ö |
|
C&D material and sand
was found on pedestrian walkway at Chainage 1900. |
Clear the C&D
material and sand. |
|
|
Ö |
|
Leaves and refuse were
found inside the u-channel at TTA3. |
Clear the leaves and
refuse from the u-channel. |
|
|
|
Ö |
Skip at Gate 1 was full
of refuse. C&D material was accumulated at Tai Lam Kok carpark and Gate
2. |
Clear the waste and
improve housekeeping on site. |
|
|
|
Ö |
Mud trails were found on
carriageway at site exit of Gate 2. |
Clear the mud trails and
provide wheel-wash at site exit. |