Inspection date |
Observation |
Contractor’s Follow-up
Action |
||||
3 |
10 |
17 |
23 |
31 |
||
Ö |
|
|
|
|
Leaves were found inside
u-channel at TTA3. Debris and silt were found inside u-channel underneath the
abutment at Siu Lam. |
Clear the debris and
properly maintain the drainage system. |
Ö |
|
|
|
|
Sand runoff on pedestrian
walkway near Gate 1 (Siu Lam). |
Clear the sand and
improve housekeeping. |
|
Ö |
|
|
|
Leaves and debris in
u-channel and catchpit at C6/C66. |
Clear the debris and
properly maintain the drainage system. |
|
Ö |
|
|
|
Mud trails on carriageway
outside Gate 2. |
Implement wheel-washing
at site exits. |
|
|
Ö |
|
|
General refuse found at
Chainage 2200. |
Clear the debris and
improve site tidiness. |
|
|
|
Ö |
Ö |
Inert C&D materials
at C66. |
Clear the C&D
materials. |
|
|
|
Ö |
|
Skip for collecting
refuse at Gate 2 was full near Gate 2. |
Clear the refuse
off-site. |
|
|
|
|
Ö |
Stockpile of excavated
material was found next to the catchpit at TTA3. |
Remove or cover the
stockpile to prevent runoff during rain events |
|
|
|
|
Ö |
U-channel at Siu Lam
roundabout filled with silty materials. |
Clear the silty material
inside u-channel. |