Appendix H              Summary of Weekly Environmental Site Inspection Observations in May 2007

 

Inspection date

Observation

Contractor’s Follow-up Action

3

10

17

23

31

Ö

 

 

 

 

Leaves were found inside u-channel at TTA3. Debris and silt were found inside u-channel underneath the abutment at Siu Lam.

Clear the debris and properly maintain the drainage system.

Ö

 

 

 

 

Sand runoff on pedestrian walkway near Gate 1 (Siu Lam).

Clear the sand and improve housekeeping.

 

Ö

 

 

 

Leaves and debris in u-channel and catchpit at C6/C66.

Clear the debris and properly maintain the drainage system.

 

Ö

 

 

 

Mud trails on carriageway outside Gate 2.

Implement wheel-washing at site exits.

 

 

Ö

 

 

General refuse found at Chainage 2200.

Clear the debris and improve site tidiness.

 

 

 

Ö

Ö

Inert C&D materials at C66.

Clear the C&D materials.

 

 

 

Ö

 

Skip for collecting refuse at Gate 2 was full near Gate 2.

Clear the refuse off-site.

 

 

 

 

Ö

Stockpile of excavated material was found next to the catchpit at TTA3.

Remove or cover the stockpile to prevent runoff during rain events

 

 

 

 

Ö

U-channel at Siu Lam roundabout filled with silty materials.

Clear the silty material inside u-channel.