1.1
Maunsell Environmental Management
Consultants Limited (MEMCL), which changed the name to ENSR Asia (HK) Ltd.
(ENSR) on 1 May 2007 (hereinafter called the “ET”) was appointed by Gammon
Construction Limited (GCL) (hereinafter called the “Contractor”) to undertake
Environmental Monitoring and Audit for “Improvement to Castle Peak Road between
Ka Loon Tsuen and Siu Lam”
(hereinafter called the “Project”). Under the requirements of Section 4 of Environmental
Permit EP-171/2003/B and Further Environmental Permit EP-01/171/2004/A,
EM&A programme as set out in the approved EM&A Manual is required to be
implemented. In accordance with the approved EM&A Manual, environmental monitoring
of air quality, noise and water quality and environmental site inspections are
required for the Project.
1.2
The EM&A programme for the Project commenced on 16 July
2004. This report presents a summary of the environmental monitoring and audit
works, list of activities, and mitigation measures for the Project in June 2007
(from 1 to 30 June 2007).
1.3
The organisation of the environmental management team is
shown in Figure 1.1. Key personnel contacts are presented in Appendix A.
Environmental
Status in the Reporting Month
1.4
The construction programme of the Project is provided in
Appendix B. In the month, the following activities took place for the
construction of the Project:
·
Viaduct
and new road construction; and
·
Reconstruction
of
1.5
Layout plan of the Project work site is provided in Figure
1.2 a to e.
1.6
The description and detailed locations of sensitive
receivers and monitoring stations for air quality, noise and water quality
1.7
The EM&A programme requires environmental monitoring for
air quality, noise and water quality
·
All monitoring parameters
·
Action and Limit levels for all environmental parameters
·
Event and Action Plans
·
Environmental mitigation measures, as recommended in the
project final EIA report
·
Environmental requirements in contract documents.
1.8
The advice on the implementation status of environmental
protection and pollution control/mitigation measures is summarised in Appendix J
of the Report.