4. [INPUT ALL NECESSARY DATA AS REQUIRED & ADD TABLES FOR OTHER MONITORING PERIODS IF NECESSARY, REVISE NSR LIMIT LEVEL ACCORDING TO EM&A MANUAL]
4.1 Water quality monitoring was suspended since 1 December 2005 as there is no rock and sand excavation at the inter-tidal zone for the construction of Slope 6SW-D/FR 17.