Inspection date |
Observation |
Contractor’s Follow-up
Action |
|||
5 |
12 |
19 |
26 |
||
Ö |
|
|
|
C&D waste was found
inside the u-channel at C6/C66. |
Clear the C&D waste
and properly maintain the drainage system. |
Ö |
Ö |
Ö |
Ö |
Stockpile of C&D
waste were found at C6/C66 and FR17. |
Clear the C&D waste
off-site regularly. |
|
Ö |
|
|
Mud trails were found at
site exit of Gate 2. |
Clear the mud trails and
provide wheel-wash to vehicles using site exits. |
|
Ö |
|
|
Refuse collection bins
were full at footbridge of Grid 9 abutment. |
Clear the refuse
regularly. |
|
|
|
Ö |
Fugitive dust was
observed during vehicles movement along unpaved area at C6/C66. |
Provide water spraying to
unpaved areas. |