5.1
Site inspection was carried out on a weekly basis to monitor
the timely implementation of proper environmental pollution control and
mitigation measures for the Project. In the month, five site inspections were
carried out. The summary of weekly environmental site inspections observations
and environmental site inspection checklists are attached in Appendix H
Review of
Environmental Monitoring Procedures
5.2
The monitoring works conducted by the Environmental Team
were inspected regularly. Observations have been recorded for the monitoring
works as follows:
Air Quality Monitoring
·
The
monitoring team recorded the observations around the monitoring stations within
and outside of the construction site.
·
The
monitoring team recorded the temperature and general weather condition on the
monitoring day.
Noise Monitoring
·
The
monitoring team recorded the observations around the monitoring stations, which
might affect the results.
·
Major
noise sources were identified and recorded.
Advice on
Waste Management Status
5.3
The actual quantities of uncontaminated sediment,
contaminated sediment, inert C&D materials and C&D wastes generated by
activities of the Project in the month are provided in Table 5.1. Trip ticket
system was implemented for all offsite waste disposal.
Table 5.1 Summary of Waste Disposal in The Month
Type of Waste Material |
Disposed Quantity |
Destination |
|
Uncontaminated sediments |
Nil |
Not Applicable |
|
Contaminated sediments |
Nil |
Not Applicable |
|
Inert C&D materials |
75m3 |
Tuen Mun
Area 38 |
|
Non-inert
C&D waste |
Metals |
Nil |
Recycling companies |
Paper/cardboard packaging |
Nil |
Not Applicable |
|
Plastics |
Nil |
Not Applicable |
|
Chemical waste |
Nil |
Not Applicable |
|
Others, e.g. general refuse |
25m3 |
WENT Landfill |
[INPUT SOLID WASTE DISPOSAL QUANTITIES &
DESTINATIONS WITH CONTRACTOR’S WASTE DISPOSAL INFORMATION IN REPORTING MONTH]
Status
Environmental Licences and Permits
5.4
The status of all permits/licences obtained/in-use in the
month is summarised in Appendix I.
Implementation
Status of Environmental Mitigation Measures
5.5
An updated summary of the Environmental Mitigation
Implementation Schedule (EMIS) is presented in Appendix J.
5.6
During the weekly site inspection conducted by the
Environmental Team in the month, the following observations and recommendations
were made.
Resource Management
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Material
Storage/Spillage/Leakage
·
Stockpile of sand was found uncovered at TTA31. The
Contractor was reminded to cover the stockpile to prevent runoff during
rainfall.
·
Stockpile of C&D waste were found at C6/C66. The
Contractor was requested to clear the C&D waste off site regularly.
·
Oil seepage was observed from an oil drum at the
Sub-Contractor office (Chainage 2200). The Contractor
was reminded to clear the oil stain.
Waste Management
·
General refuse was found accumulated at C6/C66 near
Gate 2. The Contractor was reminded to clear the refuse.
Water Pollution
·
Leaves were accumulated inside the u-channel at C6/C66.
The Contractor was reminded to clear the leaves to prevent blockage.
·
Gullies
at TTA38 and TTA31 were found blocked. The Contractor was advised to clear the
blockage and properly maintain the drainage system.
·
Broken
branches and leaves were found inside the u-channel at TTA3. The Contractor was
reminded to clear the leaves and branches inside the drainage system to prevent
blockage.
Air Emissions
·
Mud trails were found outside site exit at C6/C66. The
Contractor was advised to clear the mud trails and provide wheel-washing at
site exits.
Noise/Vibration
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Abnormal/Emergency
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Miscellaneous
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Summary of Exceedances of Environmental Quality
Performance Limit
5.7
The Event and Action Plans for air quality and noise are
presented in Appendix K.
5.8
No exceedance of impact 1-hour and
24-hour TSP and noise monitoring was recorded in the reporting month.
Summary of
Environmental Complaints, Notifications of Summons and Successful Prosecutions
5.9
Figure 5.1 presents the environmental complaint flow diagram
of the Project.
5.10
No environmental complaint, notification of summons and
successful prosecution was received in the reporting month.