Inspection date |
Observation |
Contractor’s Follow-up
Action |
||||
2 |
9 |
16 |
23 |
30 |
||
Ö |
|
|
Ö |
|
General refuse was found
accumulated at C6/C66. |
Clear the refuse. |
Ö |
|
|
|
Ö |
Leaves were accumulated
inside the u-channel at C6. |
Clear the leaves to
prevent blockage. |
|
Ö |
|
|
|
Gullies at TTA38 and
TTA31 were found blocked. |
Clear the blockage and
properly maintain the drainage system. |
|
Ö |
|
|
|
Stockpile of sand was
found uncovered at TTA31. |
Cover the stockpile to
prevent runoff during rainfall. |
|
|
Ö |
|
|
Broken branches and
leaves were found inside the u-channel at TTA3. |
Clear the leaves and
branches inside the drainage system to prevent blockage. |
|
|
Ö |
|
|
Stockpiles of C&D
waste were found at C6/C66. |
Clear the waste off site
regularly. |
|
|
|
Ö |
|
General refuse was found
accumulated on ground at C6/C66 near Gate 2. |
Properly collect the
refuse and improve housekeeping on site. |
|
|
|
|
Ö |
Mud trails were found
outside site exit at C6/C66. |
Clear the mud trails and
provide wheel-washing at site exits. |
|
|
|
|
Ö |
Oil seepage was observed
from an oil drum at the Sub-Contractor office (Chainage 2200). |
Clear the oil stain. |