5.1
Site inspection was carried out on a weekly basis to monitor
the timely implementation of proper environmental pollution control and
mitigation measures for the Project. In the month, four site inspections were
carried out. The summary of weekly environmental site inspections observations
and environmental site inspection checklists are attached in Appendix H .
Review of Environmental
Monitoring Procedures
5.2
The monitoring works conducted by the Environmental Team
were inspected regularly. Observations have been recorded for the monitoring
works as follows:
Air Quality Monitoring
·
The
monitoring team recorded the observations around the monitoring stations within
and outside of the construction site.
·
The
monitoring team recorded the temperature and general weather condition on the
monitoring day.
Noise Monitoring
·
The
monitoring team recorded the observations around the monitoring stations, which
might affect the results.
·
Major
noise sources were identified and recorded.
Advice on Waste Management Status
5.3
The actual quantities of uncontaminated sediment, contaminated
sediment, inert C&D materials and C&D wastes generated by activities of
the Project in the month are provided in Table 5.1. Trip ticket system was
implemented for all offsite waste disposal.
Table 5.1 Summary of Waste Disposal in The Month
Type
of Waste Material |
Disposed
Quantity |
Destination |
|
Uncontaminated
sediments |
Nil |
Not
Applicable |
|
Contaminated
sediments |
Nil |
Not
Applicable |
|
Inert
C&D materials |
80m3 |
Tuen Mun Area 38 |
|
Non-inert C&D waste |
Metals |
Nil |
Recycling
companies |
Paper/cardboard
packaging |
Nil |
Not
Applicable |
|
Plastics |
Nil |
Not
Applicable |
|
Chemical
waste |
Nil |
Not
Applicable |
|
Others,
e.g. general refuse |
20m3 |
WENT
Landfill |
Status Environmental Licences and
Permits
5.4
The status of all permits/licences obtained/in-use in the
month is summarised in
Implementation Status of
Environmental Mitigation Measures
5.5
An updated summary of the Environmental Mitigation
Implementation Schedule (EMIS) is presented in Appendix J.
5.6
During the weekly site inspection conducted by the
Environmental Team in the month, the following observations and recommendations
were made.
Resource Management
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Material Storage/Spillage/Leakage
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Waste Management
·
Accumulated C&D waste and general refuse was found
at Chainage 2200 outside the sub-contractor office
and at C6/C66. The Contractor was reminded to clear the waste off-site.
·
The skip at Gate 2 was found full of refuse. The
Contractor was reminded to clear the refuse off-site regularly.
Water Pollution
·
Broken branches and small amount of refuse was found
in the u-channel at TTA3 and C6/C66. The Contractor was reminded to clear the
waste inside the u-channel to prevent blockage of the drainage system.
Air Emissions
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Noise/Vibration
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Abnormal/Emergency
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Miscellaneous
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Summary of Exceedances of Environmental Quality Performance Limit
5.7
The Event and Action Plans for air quality and noise are
presented in Appendix K.
5.8
No exceedance of impact 1-hour TSP
and noise monitoring was recorded in the reporting month.
5.9
One 24-hour TSP action level exceedance
was recorded at AM1 on 15 September 2007.
Summary of Environmental
Complaints, Notifications of Summons and Successful Prosecutions
5.10
Figure 5.1 presents the environmental complaint flow diagram
of the Project.
5.11
No environmental complaint, notification of summons and
successful prosecution was received in the reporting month.