Appendix H              Summary of Weekly Environmental Site Inspection Observations in September 2007

 

Inspection date

Observation

Contractor’s Follow-up Action

6

13

20

27

Ö

Ö

 

 

Accumulated C&D waste and general refuse was found at Chainage 2200 outside the sub-contractor office.

Clear the waste off-site regularly.

 

Ö

 

 

The skip at Gate 2 was found full of refuse.

Clear the refuse off-site regularly.

 

 

Ö

Ö

Broken branches and small amount of refuse was found in the u-channel at TTA3 and C6/C66.

Clear the waste inside the drainage system.

 

 

Ö

Ö

Stockpile of C&D waste were found at C6/C66.

Remove the waste off-site regularly.