1.1
Maunsell Environmental Management Consultants Limited
(MEMCL), which changed the name to ENSR Asia (HK) Ltd. (ENSR) on 1 May 2007
(hereinafter called the “ET”) was appointed by Gammon Construction Limited
(GCL) (hereinafter called the “Contractor”) to undertake Environmental
Monitoring and Audit for “Improvement to Castle Peak Road between Ka Loon Tsuen and Siu Lam” (hereinafter called the “Project”).
Under the requirements of Section 4 of Environmental Permit EP-171/2003/B and
Further Environmental Permit EP-01/171/2004/A, EM&A programme as set out in
the approved EM&A Manual is required to be implemented. In accordance with
the approved EM&A Manual, environmental monitoring of air quality, noise
and water quality and environmental site inspections are required for the
Project.
1.2
The EM&A programme for the Project commenced on 16 July
2004. This report presents a summary of the environmental monitoring and audit
works, list of activities, and mitigation measures for the Project in November
2007 (from 1 to 30 November 2007).
1.3
The organisation of the environmental management team is
shown in Figure 1.1. Key personnel contacts are presented in Appendix A.
Environmental Status in the Reporting Month
1.4
The construction programme of the Project is provided in
Appendix B. In the month, the following activities took place for the construction
of the Project:
·
Viaduct
and new road construction; and
·
Reconstruction
of
1.5
Layout plan of the Project work site is provided in Figure
1.2 a to e.
1.6
The description and detailed locations of sensitive
receivers and monitoring stations for air quality, noise and water quality
1.7
The EM&A programme requires environmental monitoring for
air quality, noise and water quality
·
All monitoring parameters
·
Action and Limit levels for all environmental parameters
·
Event and Action Plans
·
Environmental mitigation measures, as recommended in the
project final EIA report
·
Environmental requirements in contract documents.
1.8
The advice on the implementation status of environmental
protection and pollution control/mitigation measures is summarised in Appendix J
of the Report.