Inspection date |
Observation |
Contractor’s Follow-up
Action |
||||
1 |
8 |
15 |
22 |
29 |
||
Ö |
Ö |
Ö |
Ö |
Ö |
General refuse and leaves
were found inside the catchpit at TTA3 and u-channel at C6/C66. |
Clear the refuse and
leaves to prevent blockage of the drainage system. |
Ö |
|
Ö |
Ö |
|
Mud trails were still
found outside the site exit at Gate 2. |
Implement wheel-washing
at all site exits. |
|
Ö |
Ö |
Ö |
Ö |
One chemical drum and one
oil drum were found without drip tray outside the sub-contractor office
(Chainage 2400). |
Provide drip tray to the
chemical drums. |
|
|
|
Ö |
|
Fugitive dust was
observed during vehicle movement at area near Gate 2. |
Dampen the unpaved area
for dust suppression. |