5.1
Site inspection was carried out on a weekly basis to monitor
the timely implementation of proper environmental pollution control and
mitigation measures for the Project. In the month, four site inspections were
carried out. The summary of weekly environmental site inspections observations
and environmental site inspection checklists are attached in Appendix H .
Review of Environmental Monitoring Procedures
5.2
The monitoring works conducted by the Environmental Team
were inspected regularly. Observations have been recorded for the monitoring
works as follows:
Air Quality Monitoring
·
The
monitoring team recorded the observations around the monitoring stations within
and outside of the construction site.
·
The
monitoring team recorded the temperature and general weather condition on the
monitoring day.
Noise Monitoring
·
The
monitoring team recorded the observations around the monitoring stations, which
might affect the results.
·
Major
noise sources were identified and recorded.
Advice on Waste Management Status
5.3
The actual quantities of uncontaminated sediment,
contaminated sediment, inert C&D materials and C&D wastes generated by
activities of the Project in the month are provided in Table 5.1. Trip ticket
system was implemented for all offsite waste disposal.
Table 5.1 Summary of Waste Disposal in The Month
Type of Waste Material |
Disposed Quantity |
Destination |
|
Uncontaminated sediments |
Nil |
Not Applicable |
|
Contaminated sediments |
Nil |
Not Applicable |
|
Inert C&D materials |
|
Tuen Mun
Area 38 |
|
Non-inert C&D waste |
Metals |
Nil |
Recycling companies |
Paper/cardboard packaging |
Nil |
Not Applicable |
|
Plastics |
Nil |
Not Applicable |
|
Chemical waste |
Nil |
Not Applicable |
|
Others, e.g. general refuse |
|
WENT Landfill |
[INPUT SOLID WASTE
DISPOSAL QUANTITIES & DESTINATIONS WITH CONTRACTOR’S WASTE DISPOSAL
INFORMATION IN REPORTING MONTH]
Status Environmental Licences and Permits
5.4
The status of all permits/licences obtained/in-use in the
month is summarised in
Implementation Status of Environmental Mitigation Measures
5.5
An updated summary of the Environmental Mitigation
Implementation Schedule (EMIS) is presented in Appendix J.
5.6
During the weekly site inspection conducted by the
Environmental Team in the month, the following observations and recommendations
were made.
Resource Management
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Material Storage/Spillage/Leakage
·
One chemical drum at C6/66 near Chainage
2300 was found without drip tray. The Contractor was reminded to provide drip
tray to the chemical drum.
Waste Management
·
The
skip near Gate 2 was found full of refuse. The Contractor was reminded to
remove the refuse off-site more frequently.
Water Pollution
·
General refuse was found inside the u-channel and catchpit at TTA3 and u-channel at C6/C66. The Contractor
was reminded to clear the refuse to prevent blockage of the
drainage system.
Air Emissions
·
Rock
breaking at Chinage 2400 was fond without water
spraying. The Contractor was reminded to provide water spraying to rock
breaking activities for dust suppression.
·
Mud trails were observed at the site exits of Gate 2.
The Contractor was reminded to implement wheel-washing at all site exits.
Noise/Vibration
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Abnormal/Emergency
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Miscellaneous
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Summary of Exceedances of Environmental Quality
Performance Limit
5.7
The Event and Action Plans for air quality and noise are
presented in Appendix K.
5.8
No exceedance of impact 1-hour TSP and
noise monitoring was recorded in the reporting month.
5.9
One 24-hour TSP action level exceedance
was recorded at AM1 on 6 December 2007.
Summary of Environmental Complaints, Notifications of
Summons and Successful Prosecutions
5.10
Figure 5.1 presents the environmental complaint flow diagram
of the Project.
5.11
No environmental complaint, notification of summons and
successful prosecution was received in the reporting month.