5.1
Site inspection was carried out on a weekly basis to monitor
the timely implementation of proper environmental pollution control and
mitigation measures for the Project. In the month, three site inspections were
carried out and due to site close for Lunar New Year,
the site inspection of week 2 of the reporting month was suspended. The summary
of weekly environmental site inspections observations and environmental site
inspection checklists are attached in Appendix H .
Review of Environmental Monitoring Procedures
5.2
The monitoring works conducted by the Environmental Team
were inspected regularly. Observations have been recorded for the monitoring
works as follows:
Air Quality Monitoring
·
The
monitoring team recorded the observations around the monitoring stations within
and outside of the construction site.
·
The
monitoring team recorded the temperature and general weather condition on the
monitoring day.
Noise Monitoring
·
The
monitoring team recorded the observations around the monitoring stations, which
might affect the results.
·
Major
noise sources were identified and recorded.
Advice on Waste Management Status
5.3
The actual quantities of uncontaminated sediment,
contaminated sediment, inert C&D materials and C&D wastes generated by
activities of the Project in the month are provided in Table 5.1. Trip ticket
system was implemented for all offsite waste disposal.
Table 5.1 Summary of Waste Disposal in The Month
Type of Waste Material |
Disposed Quantity |
Destination |
|
Uncontaminated sediments |
Nil |
Not Applicable |
|
Contaminated sediments |
Nil |
Not Applicable |
|
Inert C&D materials |
|
Tuen Mun
Area 38 |
|
Non-inert C&D waste |
Metals |
Nil |
Recycling companies |
Paper/cardboard packaging |
Nil |
Not Applicable |
|
Plastics |
Nil |
Not Applicable |
|
Chemical waste |
Nil |
Not Applicable |
|
Others, e.g. general refuse |
|
WENT Landfill |
[INPUT SOLID WASTE
DISPOSAL QUANTITIES & DESTINATIONS WITH CONTRACTOR’S WASTE DISPOSAL
INFORMATION IN REPORTING MONTH]
Status Environmental Licences and Permits
5.4
The status of all permits/licences obtained/in-use in the
month is summarised in
Implementation Status of Environmental Mitigation Measures
5.5
An updated summary of the Environmental Mitigation
Implementation Schedule (EMIS) is presented in Appendix J.
5.6
During the weekly site inspection conducted by the Environmental
Team in the month, the following observations and recommendations were made.
Resource Management
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Material Storage/Spillage/Leakage
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Waste Management
·
No observations
and recommendations were made during the weekly site inspections in the month.
Water Pollution
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Air Emissions
·
Dust emission
from handling of C&D waste was observed at TTA 47. The Contractor was
reminded to provide watering fro dust suppression.
Noise/Vibration
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Abnormal/Emergency
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Miscellaneous
·
No
observations and recommendations were made during the weekly site inspections
in the month.
Summary of Exceedances of Environmental Quality
Performance Limit
5.7
The Event and Action Plans for air quality and noise are
presented in Appendix K.
5.8
No exceedance of impact 1-hour and
24-hour TSP and noise monitoring was recorded in the reporting month.
Summary of Environmental Complaints, Notifications of
Summons and Successful Prosecutions
5.9
Figure 5.1 presents the environmental complaint flow diagram
of the Project.
5.10
No environmental complaint, notification of summons and
successful prosecution was received in the reporting month.