Table 4.1     Summary of Environmental Licensing and Permit Status

Permit No.

Valid Period

Section

Status

From

To

Environmental Permit

EP-104/2001/B

 

16/02/05

N/A

Site formation, drainage, geotechnical and landscape works for the toll plaza. Construction of the Sha Tin Heights Tunnels, the Sha Tin Approach Roads and the Slip Road Connecting to Che Kung Miu Road including all formation, structure, road, geotechnical, drainage and landscape work. Construction of the structure of the portal buildings of the Sha Tin Heights Tunnel and noise mitigation measures.

 

Valid

 

Construction Noise Permit

GW-RN0238-06

13/5/06

12/11/06

Installation of VE Panel inside the RCFE during general holiday included Sunday between 0900 hrs and 1900 hrs, and any day not being a holiday included Sunday between 1900 hrs and 2300 hrs.

 

Valid

GW-RN0242-06

17/5/06

16/11/06

Installation of VE Panel inside the Tunnels during general holiday included Sunday between 0900 hrs and 1900 hrs, and any day not being a holiday included Sunday between 1900 hrs and 2300 hrs.

 

Valid

GW-RN0300-06

15/6/06

14/12/06

Apply lining to 1050 diameter Sewer during general holiday including Sundays between 0700 hrs and 0700 hrs on next day and any day not being a general holiday including Sundays between 1900 hrs and 0700 hrs on next day

Valid

 

GW-RN0327-06

25/6/06

24/12/06

Dismantling of the suspended working platform over KCRC tracks during any day not being a general holiday and not being a day immediately following a general holiday between 0030 hrs and 0530 hrs.

Valid

 

GW-RN0438-06

29/8/06

28/2/07

Installation of cladding over the bridge during general holiday including Sundays between 0700 hrs and 2300 hrs and any day not being a holiday including Sundays between 1900 hrs and 2300 hrs

Valid

 

Wastewater Discharge License

3024

 

 

16/6/03

15/6/08

Wastewater discharge at the site office in Sha Tin Heights.

Valid

2984

 

 

 

21/8/03

20/8/08

Trade effluent and all other wastewater arising from the work areas, Sedimentation Barrier, Sedimentation tanks, Aqua Sep and Wet Sep

Valid

Waste Disposal (Chemical Waste)

WPN:

5213-754-C3250-01

 

 

N/A

N/A

Disposal of chemical waste such as waste lubricating oil and diesel oil arising from construction work.

Valid