6.         CONCLUSIONS AND RECOMMENDATIONS

Conclusions

 

6.1              Environmental monitoring works were performed in the reporting month and all monitoring results were checked and reviewed.

 

Environmental Monitoring

 

6.2              No Action/Limit Level exceedance was recorded for both 1-hour TSP and 24-hour TSP of dust monitoring in the reporting month.

 

6.3              No Action/Limit Level exceedance was recorded for noise monitoring in the reporting month.

 

Complaints and Prosecution

 

6.4              No prosecution was received in the reporting month.

 

6.5              No complaint was received during the reporting month.

Recommendations

 

6.6              According to the environmental audit performed in this reporting month, the following recommendations were made:

 

Dust Impact

 

·          To ensure the dust mitigation measures, such as water spray, are fully implemented during excavation works.

·          To cover or water stockpiles of dusty materials on site.

 

Noise Impact

 

·          To space out noisy equipment and position as far away as possible from sensitive receivers.

·          To provide temporary noise barriers for operations of noisy equipment near the noise sensitive receivers.

 

Water Quality Impact

 

·          To regularly maintain the condition of u-channel, catch pits and wheel washing facilities within construction site.

·          To regularly maintain the wastewater treatment facilities and ensure the proper.

·          To regularly clean the AquaSed as maintain in good working condition.

 

Waste/Chemical Management

 

·          To check for any accumulation of waste materials or rubbish on construction site.

·          To avoid any directly discharge of chemical waste or oil from the site.