Fugitive
dust was still observed during transferring and dumping of waste. The
Contractor was reminded to provide water spraying for sorting and dumping
activities at Area A and at tipping hall without further delay. |
|
|
2. |
Chemical Waste Store had been provided. The
Contractor was reminded to provide drip tray to the chemical drums inside the
Chemical Waste Store. |
|
|
3. |
Clearing of waste from the nullah
was in progress; small portion of the nullah was still filled with waste. The
Contractor agreed to remove all rubbish from the nullah by 10 April 2006. |
|
|
4. |
The Contractor was advised to apply
for the Water Discharge License as soon as possible. |
|
|
5. |
Water ponding outside the site office
at Area B1 was observed. The Contractor was reminded to clear the stagnant
water regularly or fill the area. |
|
|
6. |
Stagnant water was found inside the nullah at
Area A. The Contractor was reminded to
clear the stagnant water regularly to prevent mosquitoes breeding. |
|
|
7. |
Oily water was found accumulated
inside the drip tray next to the tipping hall at Area A had been removed. |
|
|
8. |
Rubbish
scattered around the container office in Area A had been removed. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Date: |
13 April 2006 |
Time: |
10:30 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
36 |
|
Nil |
|
|
|
Follow
up Observations |
|
|
1. |
Fugitive
dust was still observed during transferring and dumping of waste. The
Contractor agreed to provide water spraying for sorting and dumping
activities at tipping hall by 21 April 2006. The Contractor was also reminded
to provide water spraying to dumping and sorting activities at Area A. |
|
|
2. |
Drip tray in chemical waste store had been
provided. |
|
|
3. |
Clearing of waste from the nullah
had completed; small amount of the silty material from the clearance of the
nullah was found accumulated in the nullah. The Contractor was reminded to
clear the silty material as soon as possible. |
|
|
4. |
The Contractor was advised to apply
for the Water Discharge License as soon as possible. |
|
|
5. |
Water ponding outside the site
office at Area B1 had been removed. |
|
|
6. |
Stagnant water was found inside the nullah at
Area A. The Contractor was reminded to
clear the stagnant water regularly to prevent mosquitoes breeding. |
|
|
7. |
Wheel-washing bay at Area B2 was
found mal-function. The Contractor was reminded to repair the wheel-washing
bay as soon as possible. |
|
|
8. |
Oily
water inside the drip tray of the generator and oil bucket without drip tray
were observed behind the CEDD site office in Area A. The Contractor was
reminded to clear the oily water in drip tray and provide drip tray to the
oil bucket. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Date: |
20 April 2006 |
Time: |
15:00 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
38 |
|
Nil |
|
|
|
Follow
up Observations |
|
|
1. |
Fugitive
dust was still observed during transferring and dumping of waste. The
Contractor agreed to provide water spraying for sorting and dumping
activities at tipping hall by 21 April 2006. The Contractor was also reminded
to provide water spraying to dumping and sorting activities at Area A. |
|
|
2. |
Small amount of the silty material from the
clearance of the nullah was found accumulated in the nullah. The Contractor
was reminded to clear the silty material as soon as possible. |
|
|
3. |
The Contractor was advised to apply
for the Water Discharge License as soon as possible. |
|
|
4. |
Stagnant water inside the nullah at
Area A had been removed. |
|
|
5. |
Wheel-washing bay at Area B2 was
found mal-function. The Contractor was reminded to repair the wheel-washing
bay as soon as possible. |
|
|
6. |
Oily water inside the drip tray of the generator
and oil bucket without drip tray had been removed. |
|
|
|
|
|
|
|
New
Observations |
|
|
7. |
Water ponding was found outside the site office
at Area B1. |
|
|
8. |
Silty material was found
accumulated inside the u-channel at area B2. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Date: |
27 April 2006 |
Time: |
14:45 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
40 |
|
Nil |
|
|
|
Follow
up Observations |
|
|
1. |
Fugitive
dust was still observed during transferring and dumping of waste; haul roads
in Area A and B2 appeared dry. The Contractor had installed water sprinklers at
tipping hall but water supply was still awaiting. The Contractor was also
reminded to provide water spraying to dumping and sorting activities at Area
A and increase water spraying frequency along haul roads. |
|
|
2. |
Silty material inside the nullah had been cleared.
However, stagnant water was found inside the nullah. The Contractor was
reminded to remove the stagnant water after rain events. |
|
|
3. |
The Contractor was advised to apply
for the Water Discharge License as soon as possible. |
|
|
4. |
Wheel-washing bay at Area B2 was
found mal-function. The Contractor was reminded to repair the wheel-washing
bay as soon as possible. |
|
|
5. |
Water ponding outside the site
office at Area B1 had been filled. |
|
|
6. |
Silty material was found accumulated inside the
u-channel at area B2. |
|
|
|
|
|
|
|
New
Observations |
|
|
7. |
Oil stains from oil buckets were found near
tipping hall. The Contractor was reminded to remove the oil stain and dispose
of as chemical waste. |
|
|
8. |
Bunding along the nullah had yet
provided. The Contractor was reminded to provide bunding along the nullah to
prevent surface runoff and muddy water release from site. |
|
|
|
|
|
|
|
|
|
|
|